Archives

BUS 561 Quiz 2

BUS 561 Quiz 2

Which of the following would probably not benefit from the use of critical path scheduling? a) constructing a new bridge over the Mississippi River b) moving the company’s credit card center to a new city c) building a new natural […]

9 Pages | September 29, 2015
BUS 579 Quiz 2

BUS 579 Quiz 2

Vertical integration is a good strategic option for a manufacturing company when a) it needs several different parts and subassemblies b) it makes many different products c) its facilities are obsolete d) it uses distributed processing e) it needs one […]

9 Pages | September 29, 2015
BUS 588 Midterm 1

BUS 588 Midterm 1

Studies have shown that combining forecasts can lead to forecast accuracy that is better than that of the individual forecasts. Companies that compete based on flexibility often cannot compete on cost. Answer: True A process can be considered in a […]

9 Pages | September 29, 2015
BUS 605 Midterm 1 The most

BUS 605 Midterm 1 The most

The most important factor in the success or failure of TQM efforts is a) Getting started quickly b) The use of statistical process control c) The genuineness of the organization’s commitment d) The use of cause-and-effect diagrams e) Employee training […]

9 Pages | September 29, 2015
BUS 635 Midterm 2

BUS 635 Midterm 2

Which company is widely considered to be the leader of just-in-time production? a) Ford b) Timex c) Gateway d) Toyota e) Sony In Excel, how can one select cells in a range without using the mouse? a) Ctrl+Arrow Keys b) […]

9 Pages | September 29, 2015
BUS 697 Quiz 1

BUS 697 Quiz 1

Companies that have low customer contact and are capital intensive, yet provide a service, are called service factories. A useful tool for translating customers’ everyday language into specific technical requirements is Quality Function Deployment. Answer: True The MATCH function in […]

9 Pages | September 29, 2015
BUS 710 Midterm 2

BUS 710 Midterm 2

Logistics includes what two major management functions? Why are services more complex to design than manufactured goods? Answer: Services produce intangible products produced with high levels of customer contact. The probability of rejecting a lot or batch of products whose […]

3 Pages | September 29, 2015
BUS 764 Midterm 2

BUS 764 Midterm 2

Which of the following does not have a button for automatic insertion into the custom footer box? a) file name b) worksheet name c) author name d) date e) time The Answer Report Target Cell, Adjustable Cell, and Constraint sections […]

9 Pages | September 29, 2015
BUS 853

BUS 853

The items listed below are stored in a one-dock warehouse. Which of them should be stored at the very front (closest to the dock)? a) ‘Star Trek’ videos b) ballet videos c) Tom Cruise videos d) ‘The Simpsons’ videos e) […]

9 Pages | September 29, 2015
BUSOP 315 Quiz

BUSOP 315 Quiz

An excellent procedure that can be used with location factors that are qualitative is the factor rating method. Firms should balance the flow rather than the process. Answer: False A min-max inventory system implies a larger average inventory than a […]

14 Pages | September 29, 2015
BUSOP 509 Final

BUSOP 509 Final

In what company were the Hawthorne Studies conducted? a) Westinghouse b) General Electric c) Hawthorne Incorporated d) General Motors e) Western Electric A firm has had the following order history over the last 4 months: What is the weighted moving […]

9 Pages | September 29, 2015
BUSOP 592 Midterm

BUSOP 592 Midterm

The financial plan indicates the sources and uses of funds, expected cash flows, anticipated profits and projected budgets. A Gantt chart is a basic scheduling tool for low-volume systems. Answer: True Predetermined time data is a published database of elemental […]

12 Pages | September 29, 2015
BUSOP 862

BUSOP 862

Overtime is the most common method for increasing output capacity. Even though loss of customer goodwill is an intangible cost, it is considered a type of shortage cost. Answer: True Output-based incentive systems are based on the assumption that some […]

13 Pages | September 29, 2015
BUSOP 887

BUSOP 887

Which forecasting method seeks to develop a consensus among a group of experts? a) Market research b) Executive opinion c) Delphi method d) Naïve method e) Gamma method If a company carries 13 weeks of supply, what is the inventory […]

9 Pages | September 29, 2015
BUSOPMT 173

BUSOPMT 173

What are the steps involved in using network planning techniques? While Operations Management focuses on privately−owned firms, governments provide many services and some goods, like: Answer: postal service; family, social, and aged assistance and care, health care, transportation, safety and […]

3 Pages | September 29, 2015
BUSOPMT 192 Midterm 1

BUSOPMT 192 Midterm 1

Consider the following partial MPS record. Beginning inventory is 80 units. When should the first MPS shipment be scheduled? a) period 1 b) period 2 c) period 3 d) period 4 e) period 5 Consider the following partial MPS record. […]

9 Pages | September 29, 2015
BUSOPMT 373 Quiz

BUSOPMT 373 Quiz

A cycle is typically the most difficult data pattern to predict. The first level of capacity planning is at the strategic level. Answer: True Job design ensures that each employee’s activities are closely timed. Answer: False Group Technology has the […]

10 Pages | September 29, 2015
BUSOPMT 442 Test 2

BUSOPMT 442 Test 2

Removing safety time from the individual activities and putting the total safety time at the end of the critical path creates a(n) ___________________. a) project safety net b) project buffer c) overconfident project manager d) activity shortage e) larger number […]

9 Pages | September 29, 2015
BUSOPMT 834 Test 1

BUSOPMT 834 Test 1

In making specific changes to JIT manufacturing, which of the following steps should come first? a) reduce lot sizes and lead times b) switch to pull production c) reorganize workplace d) reduce setup times e) implement layout changes In the […]

9 Pages | September 29, 2015
MGMT 224

MGMT 224

Lot-for-lot ordering is commonly used in materials requirements planning systems. A firm can hedge exchange rate risk by establishing links with suppliers in a variety of countries. Answer: True The single-period inventory model objective is to balance the sale of […]

9 Pages | September 29, 2015
MGMT 242 Quiz

MGMT 242 Quiz

We use _____________________ time estimates when we can make a reliable estimate. a) variable b) probabilistic c) estimated d) deterministic e) cumulative What movement started with the publication of the results of the Hawthorne studies? a) scientific management b) human […]

9 Pages | September 29, 2015
MGMT 323 Midterm 2

MGMT 323 Midterm 2

Johnson Enterprises sells no-spill syrup in bottles. Management is evaluating four different machines with standard deviations of .006, .01, .022, and .04 ounces for Machines A, B, C, and D, respectively. The specification limits 11.95 and 12.05 ounces. Which machines […]

3 Pages | September 29, 2015
MGMT 459 Midterm

MGMT 459 Midterm

Suppose that you are using the three-period simple moving average method to forecast sales, and sales have been increasing by 10% every period. Then your forecasts will be lower than the actual sales. A common practice of scenario analysis is […]

13 Pages | September 29, 2015
MGMT 514 Midterm 2

MGMT 514 Midterm 2

Suppose that Sally’s company uses exponential smoothing to make forecasts. Further suppose that last period’s demand forecast was for 20,000 units and last period’s actual demand was 21,000 units. Sally’s company uses a smoothing constant (α) equal to 40%. What […]

9 Pages | September 29, 2015
MGMT 519

MGMT 519

In TQM the role of the employee is very similar to earlier requirements. If using slack per remaining operations (S/RO) as the scheduling rule, the job with the least slack per remaining operations has the highest priority. Answer: True Backward […]

12 Pages | September 29, 2015
MGMT 655 Quiz

MGMT 655 Quiz

Operations management is the central core function of every company. Planalytics is a company that helps businesses use weather data to make their business plans. Answer: True Marketing is not highly affected by layout planning. Answer: False Benchmarking should only […]

11 Pages | September 29, 2015
MGMT 733 Homework

MGMT 733 Homework

The projected available quantity row in an MPS record keeps track of how many units are available at the beginning of each time period. Outsourcing instead of pursuing vertical integration is often a good strategic option for a firm using […]

11 Pages | September 29, 2015
MSE 280 Final

MSE 280 Final

When evaluating location alternatives the firm should look at a) only qualitative factors b) only quantitative factors c) both qualitative and quantitative factors d) weighted average values e) decision support models only In break-even analysis, what is the break-even point? […]

9 Pages | September 29, 2015
MSE 298 Quiz 1

MSE 298 Quiz 1

Disadvantages of globalization include political risks for countries with unstable governments. The amount of outsourcing in industry is increasing. Answer: True CPFR is an iterative process. Answer: True Gross requirements for finished products are taken from the order entry file. […]

12 Pages | September 29, 2015
MSE 347 Final

MSE 347 Final

A control chart is a schematic diagram of the sequence of steps involved in an operation or process. JIT considers waste anything that does not add value. Answer: True Federal Express subcontracts its work overload to other firms during peak […]

11 Pages | September 29, 2015
MSE 553 Quiz 2

MSE 553 Quiz 2

The aggregate plan is usually updated and reevaluated monthly by the operations group. Economic feasibility is the degree to which the job adds value and the cost of performing the job done are profitable for the company. Answer: True Essay […]

12 Pages | September 29, 2015
MSE 597 Test 1

MSE 597 Test 1

Given the following data: The end product J is made from components K and L. Component K is made from M and N. The authorized MPS calls for 10 J to be completed in week 2, 30 J to be […]

10 Pages | September 29, 2015
MSE 672 Homework

MSE 672 Homework

Productivity gains in the service sector have been much lower than that of manufacturing. When possible, managers should purchase and use CRAFT because it gives an optimal solution to the facility layout problem. Answer: False A key outcome of JIT […]

9 Pages | September 29, 2015
MSE 756 Homework

MSE 756 Homework

To add Cell Comments for a cell in Excel, right-click and choose ____________________. a) Insert Comment b) Format Cells’¦ c) Hyperlink’¦ d) Insert’¦ e) Pick From List’¦ Which of the following can be calculated for an activity once ES, EF, […]

9 Pages | September 29, 2015
MSE 850 Final

MSE 850 Final

What costs are considered in the basic EOQ model? a) annual ordering costs + annual holding costs b) annual purchasing costs + annual holding costs c) annual ordering costs + annual holding costs + annual shortage costs d) annual purchasing […]

9 Pages | September 29, 2015
OIM 365 Final

OIM 365 Final

OM’s transformation role is to add value. Value added is a) performing activities well for the least possible cost b) the net decrease between output product value and input material value c) increasing product value in the first stage d) […]

9 Pages | September 29, 2015
OIM 414 Midterm 1

OIM 414 Midterm 1

JIT manufacturing cannot succeed if set-up costs are too high. For the general warehouse layout problem, the department with the highest ratio of trips to areas needed should be located closest to the dock. Answer: True An error in replenishment […]

9 Pages | September 29, 2015
OIM 434

OIM 434

If customer service is important to the company, average job lateness is probably a more relevant measurement than average job tardiness. A small range and large standard deviation imply that data observations are closely clustered around the mean. Answer: False […]

9 Pages | September 29, 2015
OIM 529

OIM 529

Risk costs are obsolescence, damage deterioration, theft, insurance and taxes. An increase in the desired confidence level will decrease the number of observations necessary in a time study. Answer: False Statistical packages such as SPSS, SAS, and Minitab, are types […]

10 Pages | September 29, 2015
OIM 588 Quiz

OIM 588 Quiz

Aggregate planning, master production scheduling, and rough-cut capacity affect a select area of the organization. Sensitivity reports show what will happen if certain problem parameters are changed from their current values. Answer: True If OT = the mean observed time, […]

12 Pages | September 29, 2015
OIM 844 Midterm

OIM 844 Midterm

Scheduled receipts are replenishment orders that have been placed but not yet received. Efficiency means being able to perform most activities. Answer: False In a fixed position layout, resources are fixed in various locations and the products move from one […]

12 Pages | September 29, 2015
OIM 854 Homework

OIM 854 Homework

George Dantzig developed the Simplex Method in 1947. The cost of space in Silicon Valley is higher now than it was in the late 1990s. Answer: False An order released to the shop floor authorizes withdrawal of the needed materials […]

9 Pages | September 29, 2015
Operation Management 273 Quiz

Operation Management 273 Quiz

Consider the following partial MPS record. Beginning inventory is 0 units. The firm uses a fixed order quantity of 60 units. Fill out the last two rows of the table. The items listed below are stored in a one-dock warehouse. […]

3 Pages | September 29, 2015
Operation Management 344 Quiz 2

Operation Management 344 Quiz 2

An action notice is generated ________________________________________. a) for planned orders in any period b) only for orders that are to be released to the shop floor c) only for movements to and from the warehouse d) only when marketing needs […]

9 Pages | September 29, 2015
Operation Management 490 Homework

Operation Management 490 Homework

Management has decided to add capacity incrementally in smaller chunks as needed, rather than purchasing one large facility. This decision ____________________. a) is very risky b) will result in low initial costs c) will ultimately result in lower costs per […]

9 Pages | September 29, 2015
Operation Management 606

Operation Management 606

Which of the following is equivalent to ‘=SUMPRODUCT(A1:A4,B2:B6)’? a) A1*A4 + B2*B6 b) A1*B2 + A2*B3 + A3*B4 + A4*B5 c) (A1+A4)*(B2+B6) d) (A1+A2+A3+A4)*(B2+B3+B4+B5+B6) e) This is an invalid function. In Excel, which function returns the number of cells containing […]

9 Pages | September 29, 2015
Operation Management 768 Midterm 1

Operation Management 768 Midterm 1

Local wage rates, presence of local unions, and attitudes of local workers would be major factors for location decisions for businesses that ________________________. a) are labor intensive b) have perishable products c) have high transportation costs d) have need for […]

9 Pages | September 29, 2015
Operation Management 821 Quiz 3

Operation Management 821 Quiz 3

The backlog at a work center increases when the work center receives more work than it finishes. The reorder point is used in determining the order quantity in the periodic review system. Answer: False In six-sigma programs, individuals are given […]

11 Pages | September 29, 2015
Operation Management 893

Operation Management 893

Increasing the level of responsibility of a job by adding planning and coordination tasks is ___________. a) job enlargement b) job rotation c) job involvement d) job enrichment e) job backward integration If using CR as the priority rule, which […]

9 Pages | September 29, 2015
OPMGT 120

OPMGT 120

Time series models are generally more difficult to use than causal models. Inventory turnover is the reciprocal of weeks of supply. Answer: False The first mathematical model for inventory management was developed by Elton Mayo. Answer: False If the number […]

12 Pages | September 29, 2015
OPMGT 243 Midterm

OPMGT 243 Midterm

Using the Tibrewala, Phillippe, and Brown technique for a Monday through Sunday work week a regular, full time employee can end up with a Sunday-Monday set of days off. Changes to the MPS that are requested inside of the demand […]

10 Pages | September 29, 2015
OPMGT 349

OPMGT 349

In Excel, when moving a formula to another cell, it is better to use Copy and Paste rather than Cut and Paste. Rationing and shortage gaming occur when supply exceeds demand. Answer: False The TOC focuses on correct placement of […]

12 Pages | September 29, 2015
OPMGT 361 Test

OPMGT 361 Test

Which of the following is true? a) A line with a lower cycle time has greater output than one with a higher cycle time. b) A line with a higher cycle time has greater output than one with a lower […]

9 Pages | September 29, 2015
OPMGT 396 Test 2

OPMGT 396 Test 2

Frank’s umbrella corporation is designing a kanban system. They know that they are expected to produce 100 umbrellas per hour. They’ve also determined that a key external resource takes 30 minutes to deliver the required material once an order has […]

3 Pages | September 29, 2015
OPMGT 436

OPMGT 436

Suppose that the formula in cell C8 is ‘=H2+$P6’. If cell C8 is copied to cell E7, the formula in cell E7 will be ‘=J1+R5’. Whenever demand exceeds supply, the company experiences a lost sale. Answer: False In Excel, you […]

12 Pages | September 29, 2015
OPMGT 449

OPMGT 449

In the ‘liquid’ portion of the MPS, the master scheduler generally has the authority to approve what changes? a) product mix b) changes needing extra resources (already authorized by the aggregate plan) c) product mix and changes needing extra resources […]

9 Pages | September 29, 2015
OPMGT 451 Quiz 2

OPMGT 451 Quiz 2

What occurs when a customer enters one line and then switches to a different line in an effort to reduce his or her waiting time? a) balking b) walking c) reneging d) vacillating e) jockeying Which of the following is […]

9 Pages | September 29, 2015
OPMGT 472

OPMGT 472

The first military use of management science was solving complex problems of logistics control, weapons system design, and deployment of missiles during _____________________. a) World War I b) World War II c) The Korean War d) The Vietnam War e) […]

9 Pages | September 29, 2015
OPMGT 512 Quiz 3

OPMGT 512 Quiz 3

What is the statistic that measures the direction and strength of the linear relationship between two variables? a) r2 b) Coefficient of variation c) Variance d) Coefficient of kurtosis e) Correlation coefficient What are two of the most popular facility […]

9 Pages | September 29, 2015
OPMGT 652

OPMGT 652

According to the textbook, the way to reduce the ppm defective is to a) change product specifications b) increase process capability c) increase the number of inspection points. d) employ more inspectors e) increase process throughput Capacity planning is difficult […]

9 Pages | September 29, 2015
OPMGT 730 Midterm 1

OPMGT 730 Midterm 1

An example of an output measure of capacity is labor hours. Shipments should spend less than 24 hours in a crossdock. Answer: True Capacity decisions at the strategic level include the size of workforce. Answer: False Solving a decision tree […]

10 Pages | September 29, 2015
OPMGT 876

OPMGT 876

What term tells us how frequently a product is completed? a) output rate b) task time c) station time d) cycle time e) output time If the upper control limit for a c-chart is 28 and the lower control limit […]

9 Pages | September 29, 2015
OPMT 262

OPMT 262

What are the three elements of the service package? a) physical goods, sensual benefits, and psychological benefits b) sales, return policy, and warranty c) customer service, return policy, and warranty d) kindness, information provision, and speed e) physiological benefits, sensual […]

9 Pages | September 29, 2015
OPMT 388 Quiz

OPMT 388 Quiz

ERP systems provide _____ and _____ benefits. a) tangible, HR b) intangible, marketing c) marketing, operation d) tangible, intangible e) CEO, CFO Which of the following is true regarding the relative predictability of the cycle of new product introductions? a) […]

10 Pages | September 29, 2015
OPMT 393

OPMT 393

What is the amount by which the efficiency of a production line falls short of 100%? a) balance delay b) efficiency deficiency c) efficiency delay d) balance shortfall e) percentage deficiency How can both the JIT and EOQ inventory theories […]

9 Pages | September 29, 2015
OPMT 464 Quiz 1

OPMT 464 Quiz 1

With probabilistic time estimates for activities, (m) denotes the mean time. ‘Job enrichment’ is an approach in which workers are given a larger portion of the total task to do. Answer: False The objective of supply chain management is to […]

10 Pages | September 29, 2015
OPMT 473 Quiz 3

OPMT 473 Quiz 3

Magnatree is a large company that has been working on a new product. This product has tremendous potential, but Magnatree must move quickly. They have decided that they will introduce the product in two months and have already started developing […]

9 Pages | September 29, 2015
OPMT 500 Midterm 1

OPMT 500 Midterm 1

Which one of these refers to reducing the number of parts and features of the product whenever possible? a) design automation b) design specification c) design reduction d) design standardization e) design simplification In inventory management, when discussing customer service […]

10 Pages | September 29, 2015
OPMT 525 Quiz 3

OPMT 525 Quiz 3

Which of the following is a measure of how long after the due date the job is completed? a) job belatedness b) mean flow time c) makespan d) job overdueness e) job tardiness Something you would not expect to see […]

9 Pages | September 29, 2015
OPMT 627 Quiz 3

OPMT 627 Quiz 3

A company’s accepted time studies are stored in a(n) ____________ for possible future use. a) file cabinet b) time study vault c) warehouse d) jar e) elemental time database Consider a packaged milk products supply chain. A lumber company provides […]

9 Pages | September 29, 2015
OPMT 659

OPMT 659

A feasible solution to an optimization problem is a particular combination of decision variables that satisfies some of the constraints. Spreadsheet flexibility implies that the user should enter each input only once in the model. Answer: True The explosion process […]

12 Pages | September 29, 2015
OPMT 664 Test 2

OPMT 664 Test 2

Moving average forecasts with a larger number of observations are more responsive than those with a smaller number of observations. One of the most important trends in companies today is competition based on time. Answer: True The Delphi method of […]

14 Pages | September 29, 2015
QSO 113 Homework

QSO 113 Homework

Which of the following is considered a ‘quality guru?’ a) Elton Mayo b) W. Edwards Deming c) Alex Gamble d) F.W. Harris e) Frederick W. Taylor Which of the following is not a step in the load-distance model? a) solve […]

9 Pages | September 29, 2015
QSO 136

QSO 136

Companies use a single lot-sizing technique to standardize processes. With Excel Solver, the range for the Changing Cells box must be entered with absolute references ($ signs). Answer: False At Wal-Mart, to maximize customer comfort and enjoyment, layouts are designed […]

13 Pages | September 29, 2015
QSO 182

QSO 182

Crossdocking eliminates the receiving and shipping functions of a distribution warehouse while still performing its storage and order picking functions. For projects whose activities have probabilistic time estimates, the probability of completing the project in a specified amount of time […]

10 Pages | September 29, 2015
QSO 234 Test 2

QSO 234 Test 2

Quality control approaches are part of the production process infrastructure. In general, scheduling resources is less challenging under a process layout than it would be under a product layout. Answer: False Two types of information needed when measuring capacity is […]

10 Pages | September 29, 2015
QSO 466

QSO 466

Consider a single-server queuing system. If the arrival rate is 45 customers per hour and it takes 1 minute on average to serve a customer, what is the average waiting time in the waiting line in minutes? a) 3 b) […]

9 Pages | September 29, 2015
QSO 777 Midterm 2

QSO 777 Midterm 2

The quantity that equates the cost of making a product to the cost of buying the product is generally called what? a) Neutrality point b) Point of equality c) Indifference point d) Point of optimality e) No such point can […]

9 Pages | September 29, 2015
QSO 785 Midterm 1

QSO 785 Midterm 1

Cost data Capacity data Demand data Develop a chase aggregate plan without inventory and back orders. Do no hiring or firing. When demand exceeds regular production, use overtime up to its maximum and then subcontracting. When demand is less than […]

9 Pages | September 29, 2015
QSO 896 Test 2

QSO 896 Test 2

Buying a competitor’s new product and studying its design features by disassembling it and analyzing its parts and features is reverse engineering. Quality Function Deployment (QFD) enhances communication between marketing, operations, and engineering functions. Answer: True Operations Strategy is developed […]

9 Pages | September 29, 2015