According to the textbook, the way to reduce the ppm defective is to
a) change product specifications
b) increase process capability
c) increase the number of inspection points.
d) employ more inspectors
e) increase process throughput
Capacity planning is difficult because
a) Board of directors set the requirements
b) the mathematical requirements are difficult
c) the planning stages always require global considerations
d) there is no one way to measure it
e) it is easy to confuse the service organization and manufacturing organization
measurements
Given the following data:
page-pf2
The beginning inventory is 0 and there are no scheduled receipts. The order cost is $50
and the holding cost is $1 per part per period.
(a) What are the order costs, carrying costs, and totals cost over the 8 periods using the
lot-for-lot size rule?
(b) What are the order costs, carrying costs, and totals cost over the 8 periods using the
fixed order quantity rule with FOQ = 100?
(c) What are the order costs, carrying costs, and totals cost over the 8 periods using the
period order quantity rule with POQ = 2?
Which of the following is more like a product layout as compared to a process layout?
a) Resources used are specialized.
b) Facilities are less capital intensive.
c) Processing rates are slower.
d) Space requirements for inventory storage are higher.
e) Scheduling resources is more challenging.
page-pf3
If a model produces numerically correct values for the outputs for any legitimate values
of inputs, it is said to be
a) flexible
b) adjustable
c) a transformation
d) accurate
e) inaccurate
Given the following data:
The end product J is made from components K, and L. K is made from M, N, and O.
(a) What is the replenishment lead time for J, assuming there are no inventories?
(b) Calculate the gross requirements for each of the components if the company plans to
build 10 of its J model. Assume that there are no beginning inventories.
(c) Calculate the gross requirements for each of the components if the company plans to
build 10 of its J model if you have these beginning inventories: 20 K and 80 M.
(d) What is the replenishment lead time if the company plans to build 10 of its J model,
assuming the beginning inventories given in (c) above?
page-pf4
Controllable inputs are also called _________________________.
a) decision variables
b) parameters
c) regulated inputs
d) regulated variables
e) dominant variables
What do studies suggest are the three sources of impact?
a) Reduce waste, leverage core competence, and create new opportunities
b) Provide quantity discounts, reduce waste, and create new opportunities
c) Create detailed contracts, reduce waste, and create new opportunities
d) Create detailed contracts, leverage core competence, and reduce waste
e) Create detailed contracts, leverage core competence, and create new opportunities
page-pf5
The comparison of aggregate plans is difficult when they produce different quantities
and thus _________.
a) have different ending inventories
b) have different staffing levels
c) have different amounts of overtime
d) have different amounts of subcontracting
e) have different revenues
For a single-server, single-line, single-phase waiting line system, where  represents
the mean arrival rate of customers and represents the mean service rate, what is the
formula for the average time spent waiting in line?
a)  /
page-pf6
b)  / ( )
c)  2 / ( )
d) 1 / ( )
e) pW
Which of the following is not considered to be a key element of JIT supplier
relationships?
a) suppliers viewed as internal factory
b) use of single-source suppliers
c) long-term supplier relationships developed
d) suppliers locate near customer
e) cost and information sharing
Which of the following waiting line systems best describes a bank with a single waiting
line that feeds customers to multiple identical servers?
a) single-server, single-phase
b) single-server, multi-phase
page-pf7
c) multi-server, single-line, single-phase
d) multi-server, multi-line, single-phase
e) multi-server, multi-phase
Which of the following is more like a product layout as compared to a process layout?
a) Resources used are general purpose.
b) Facilities are less capital intensive.
c) Processing rates are slower.
d) Space requirements for inventory storage are lower.
e) Scheduling resources is more challenging.
What does TL stand for?
a) Transportation lead time
b) Transportation logistics
c) Trucking line
d) Trucking life
e) Truckload (quantity)
page-pf8
Which business function is responsible for planning, coordinating, and controlling the
resources needed to produce a company's products and services?
a) engineering
b) finance
c) human resources
d) marketing
e) operations management
Common causes of variation are also known as __________________________.
a) frequent
b) usual
c) inexpensive
d) ordinary
e) random
page-pf9
Formulate the following as a linear program.
Joe's Sports Shop is sponsoring a weekly boomerang-throwing contest as part of its
spring promotions. Anyone may enter, but the boomerangs used must be purchased at
the shop. Demand is unlimited. Two models can be made: the regular model (with a
profit of $2 each) and the super model (which yields a $5 profit). However, production
facilities are limited. A regular boomerang requires 1 hour of carving and 2 hours of
finishing, while a super boomerang takes 3 hours to carve and 2 hours to finish. The
skilled crafters employed by the shop have indicated they will spend no more than 75
hours carving and 100 hours finishing boomerangs per week. The owner wishes to
allocate production in order to maximize profits.
What are some variations of the mathematical waiting line models that are not
described in Supplement C?
page-pfa
____________ _______________ develops financial plans to support the business
strategy.
Compare the access differences among the Internet, an intranet, and an extranet.
Materials and work in process move farther and more often under
____________________.
Name three things purchasing agents should avoid as they balance loyalty their own
organization and those with whom they deal: ________________________,
________________________, ________________________
page-pfb
Formulate the following as a linear program.
Dane's aircraft muffler manufacturers have 1000 linear feet of steel on hand to
manufacture the three top selling muffler sets. Super mufflers (S) provide $35 profit and
common (C) mufflers' profit margin is $31, while the deluxe (D) muffler set provides a
$40 profit margin. It takes 31 hours to make the super muffler, 29 hours to manufacture
the common muffler, and 40 hours to build the deluxe muffler. If Dane is limited to 200
hours a month what is the optimum combination of mufflers to manufacture to
maximize his profits?