(2) Y ≥ 0
(3) 10X + 4Y ≤ 110
(4) 5X – Y ≤ 40
If constraints (3) and (4) are binding, what is the optimal solution (X, Y)?
a) (11, 0)
b) (0, 27.5)
c) (0, -40)
d) (9, 5)
e) not enough information is provided to answer the problem
Consider the following information.
(a) Determine the sample size needed if the standard time estimate is to be within 5% of
the true mean 99% of the time.
(b) Calculate the normal time for each work element.
(c) Using an allowance factor of 15% based on job time; calculate the standard time for
each work element and for the entire job.
(d) Based on the standard time, how many units should an employee performing at
100% of standard complete during an 8-hour day?