Quality control approaches are part of the production process infrastructure.
In general, scheduling resources is less challenging under a process layout than it would
be under a product layout.
Two types of information needed when measuring capacity is the amount of available
capacity and the effectiveness of capacity use.
It is not possible to develop a U shaped scatter diagram relationship.
page-pf2
An assembly line is an example of an intermittent processing system.
Walking occurs when a customer decides not to enter the waiting line.
Forecasts are more accurate for individual items than for groups or families of items.
Descriptive statistics are used to describe quality characteristics and relationships.
page-pf3
Human resources is not really involved in work sampling as this is a production facility
process.
A predecessor can be worked in parallel with a successor.
In general, companies use periodic review systems for items that are expensive and/or
critical to the company.
Worker participation in decision making is a key feature of scientific management.
page-pf4
An operations strategy should not impact the firm's supply chain design.
Shortening the total time for completing a project by incurring higher costs from
shortening activities is ________.
a) normal cost
b) backward pass
c) crashing
d) leveling
e) project control
Which of the following statements is correct?
a) Given a Linear Program with a maximization objective, the optimal objective
function value may increase if a ≥ constraint is added to the program.
b) Given a Linear Program with a maximization objective, the optimal objective
function value may increase if a ≤ constraint is added to the program.
c) Given a Linear Program with a minimization objective, the optimal objective
function value cannot increase if a ≥ constraint is added to the program.
d) Given a Linear Program with a minimization objective, the optimal objective
function value cannot increase if a ≤ constraint is added to the program.
e) Given a Linear Program with a maximization objective, the optimal objective
function value may decrease if a ≥ constraint is added to the program.
page-pf5
If your company is concerned with customer response time you will measure
scheduling effectiveness in terms of:
a) job reject rates
b) job profit ratio
c) response time
d) input time
e) makespan
Which of the following is not characteristic of intermittent operations?
a) produce many different products with varying processing requirements
b) capital intensive
c) workers need to be able to perform different tasks depending on the processing needs
of the product
d) general purpose equipment
e) volume of goods produced directly tied to number of customer orders
page-pf6
What does the textbook define as the three most critical factors in successful
partnering?
a) Impact, mission, vision
b) Impact, intimacy, vision
c) Contracting, mission, vision
d) Contracting, intimacy, mission
e) Contracting, impact, intimacy
In Excel, which function returns the square root?
a) ROOT(number)
b) SQR(number)
c) SQRT(number)
d) SQUAREROOT(number)
e) ROOT2(number)
page-pf7
General Electric's Trading Process Network primarily handles transactions between
_______________.
a) individual customers
b) companies and individual customers
c) companies and their shipping firms
d) companies and their distributors
e) companies and their suppliers
A series of stages that products pass through in their lifetime, characterized by changing
product demands over time is defined as
a) Development life cycle
b) Design program
c) Product life cycle
d) Services life cycle
e) Product life methodology
Which of the following most closely describes job enrichment?
a) vertical expansion
page-pf8
b) transferring workers through a series of jobs to increase their scope of experience
c) increasing the amount of workspace assigned to a worker
d) horizontal expansion
e) assigning two jobs to the same worker
In JIT the workforce is viewed as
a) another resource to be managed
b) another contractual obligation
c) a long-term asset
d) a short term asset
e) an asset that must be closely managed
Project managers use network planning techniques to ________________________.
a) evaluate costs
b) assign resources to activities
c) estimate how long it will take to assign activities
d) calculate the expected completion time of the project
page-pf9
e) invert activities
Which of the following steps is not included when a time study analyst uses standard
elemental times?
a) Identify the standard elements of the job.
b) Determine the performance rating factor.
c) Adjust the database times if needed.
d) Check the database for time studies done on these elements.
e) If no valid studies exist for this or a similar work element, do a time study for the
new work element.
Which of the following is not an example of factory focus?
a) Ann Taylor
b) Sears
c) Limited Too
d) The Gap
e) The Limited
page-pfa
Operations management personnel perform a variety of functions, including all of the
following except ___________________.
a) analyzing production problems
b) analyzing potential mergers
c) developing forecasts
d) developing employee schedules
e) monitoring inventory
Which of the following is not characteristic of the critical chain approach?
a) It can help get projects done faster and more consistently at or before the project due
date.
b) The focus is on project milestones.
c) The idea is that project activities are uncertain.
d) Safety time is added to project time estimates.
e) Safety time is placed at the end of the critical path.
page-pfb
Net marketplaces are designed to:
a) bring together only internal resources.
b) bring together limited external resources.
c) bring together significant number of purchasing firms.
d) limit the number of daily transactions.
e) limit cyber security risks.
What quality control tool resembles a "fishbone?"
a) Checklists
b) Scatter diagrams
c) Pareto analysis
d) Cause-and-effect diagrams
e) Flowcharts
A firm has the following order history over the last 6 months.
page-pfc
What would be the 4-month simple moving average forecast for July?
a) 97.5
b) 325
c) 90
d) 81.25
e) 50
Which of the following statements is not true?
a) A two-bin system allows a firm to not have to keep perpetual inventory records.
b) Using perpetual inventory records results in different order quantities than using a
two-bin system.
c) In a two-bin system, units in the second bin are not used until the first bin is empty.
d) In a two-bin system, the size of the second bin should equal the demand during
replenishment lead time.
e) Perpetual inventory records are appropriate when using the EPQ model.
page-pfd
What value of the correlation coefficient implies that there is no relationship between
the two variables of a linear regression model?
a) 1
b) 0
c) 0.5
d) 1
e) 
Uhura Enterprises provides consulting services for customers. Consultants are brought
in for two-hour shifts. A consultant will spend one full hour with a customer. The
customers remain for that hour and then leaves. Each consultant is paid $25 per hour.
Let Xirepresent the number of consultants starting their shift at hour i, (i = 1,2,3,4). The
firm wishes to minimize salary costs while satisfying demand. Customer demand is as
follows.
Suppose that if consultants start shifts at both 1:00 and 2:00, then the firm will incur an
additional fixed cost of $100 (for secretarial support). Let Y be a binary (0-1) variable
that equals 1 if this event occurs, and 0 otherwise. Which of the following would
'activate' Y (i.e., which would force Y to equal 1 when it is supposed to)? (In the options
page-pfe
below, Y and qiare binary (0-1) variables.)
a) X1+ X2≤ 5000Y
b) X1≤ 5000Y and X2≤ 5000Y
c) X1+ X2≥ 5000Y
d) X1+ X2≥ Y
e) X1≤ 5000q1and X2≤ 5000q2and q1+ q2≤ 1 + Y
Suppose that a product has two parts, both of which must be working in order for the
product to function. The reliability of the first part is .85, and the reliability of the
second part is .82. In addition, the second part comes with a backup that is 50%
reliable. What is the overall reliability of the product?
A firm whose variable cost of providing a function is $10 while a potential supplier will
outsource the function if ______________________
page-pff
What are the objectives of second-generation ERP systems?
Solver's Changing Cells corresponds to the ________ in the algebraic model.
What are the characteristics of self-managed teams?
page-pf10
What are three reasons that respect for people is important in JIT?