BUS 764 Midterm 2

subject Type Homework Help
subject Pages 9
subject Words 1695
subject Authors R. Dan Reid

Unlock document.

This document is partially blurred.
Unlock all pages and 1 million more documents.
Get Access
page-pf1
Which of the following does not have a button for automatic insertion into the custom
footer box?
a) file name
b) worksheet name
c) author name
d) date
e) time
The Answer Report Target Cell, Adjustable Cell, and Constraint sections all include:
a) base value, original value
b) original value, final value
c) base value, final value
d) original value, test value
e) bounded value, un-bounded value
What are the most important three dimensions along which a spreadsheet model should
be evaluated?
page-pf2
a) aesthetic, correct, and flexible
b) aesthetic, documented, and flexible
c) correct, documented, and flexible
d) aesthetic, correct, and documented
e) correct, documented, and random
Which basic EOQ assumption does the EPQ model relax?
a) Lead time is known and constant.
b) Demand is known and constant.
c) Quantity discounts are not considered.
d) Orders arrive at once.
e) Back orders are not allowed.
Last month TMJG Co. started producing a new product called Thingamajigs from its
new plant. Sales were quite good for the first couple of weeks. Unfortunately, a
technological innovation was then announced by a competitor. This innovation will
almost completely eliminate the demand for Thingamajigs. As a result, TMJG has
decided to shut down and dismantle the plant next week. The average cost per unit will
be highest if the plant was _________________________.
page-pf3
a) a small facility
b) in the right location
c) a large facility
d) just-in-time
e) a medium facility
Once you've written the algebraic formulation of the problem, the next setup involved
in Solving Optimization Problems is:
a) develop test cases
b) examine the results and make corrections
c) analyze and interpret the results
d) set up the Solver settings
e) write the problem formulation
Capital Co. is considering which of five different projects to undertake in order to
maximize its net present value (NPV). Define Xias a binary (0-1) variable that equals 1
if project i is undertaken and 0 otherwise, for i = 1,2,3,4,5. The NPV and required
capital (in thousands) for each project are listed below.
page-pf4
What is the proper objective function?
a) Max X1+ X2+ X3+ X4+ X5
b) Min 60X1+ 50X2+ 40X3+ 20X4+ 30X5
c) Max 7X1+ 10X2+ 6X3+ 3X4+ 12X5
d) Max 60X1+ 50X2+ 40X3+ 20X4+ 30X5
e) Min 7X1+ 10X2+ 6X3+ 3X4+ 12X5
Which of the following is least likely to be a consideration in facility location?
a) the design of the production process
b) mistakes in choosing a location can be difficult to correct
c) often there are a number of acceptable locations
d) expanding capacity at a current location may be an option
e) location decisions can have a major impact on operating costs and revenues
page-pf5
What is the methods analysis chart that describes the overall sequence of operation,
movement, inspection, delay, and storage?
a) process flowchart
b) worker-machine chart
c) simultaneous-motion (simo) chart
d) efficiency/time-of-day chart
e) operations chart
Given this information about an activity: ES = 10, EF = 20, LS = 29, and LF = 39. The
amount of slack associated with the activity is ____________________.
a) 29
b) 9
c) 19
d) 38
e) 10
page-pf6
When developing a detailed layout, what tools would be used?
a) MS Excel
b) MULTISTORY
c) CRAFT++
d) 3-D models and CAD software
e) Architecture Software
Given the following calculate (a) cost using a level production plan, (b) cost using a
chase aggregate plan, and identify the lowest cost option. In the level production plan
backorders are allowed but for each unfilled order it costs the company $10/unit. The
employees work an 8 hour day and overtime is not allowed
a) A=5834, B = 5472, C = level
b) A=5472, B = 5834, C = level
c) A=5834, B = 5472, C = chase
d) A=5472, B = 5834, C = chase
e) A =5834, B = 5472, C = either
page-pf7
page-pf8
A bakery bakes bread in two different ovens. Oven 1 can bake a loaf every 30 minutes.
Oven 2 can bake a loaf every 15 minutes. What is the average productivity per oven?
a) 6.00 loaves/hour
b) 3.00 loaves/hour
c) 2.67 loaves/hour
d) 1.33 loaves/hour
e) 0.38 loaves/hour
page-pf9
Which of the following information about activities is not needed in determining how
to crash a project?
a) the normal cost
b) the crash cost
c) the crash time estimate
d) the normal time estimate
e) how many dummy activities there are
Medco plans to open a new medical center and is looking for a suitable location. They
have narrowed their choice down to three locations, on Oak, Elm, and Ash Streets. They
have defined four factors and have assigned weights to these factors as follows:
proximity to hospitals (40), customer parking (30), appearance (20), and ease of
expansion (10). They then rated the three locations for the four factors, using a scale of
one to five. Their ratings are as follows:
(a) Calculate the scores for each location.
(b) According to the model which location should they choose?
page-pfa
If the costs (S and H) and demands (D) are the same, which of the following is not true
with regard to the EPQ model as compared to the EOQ model?
a) The EPQ model produces a higher total annual cost.
b) The maximum inventory level is lower under the EPQ model than under the EOQ
model.
c) Both models use the same formula to compute annual ordering cost.
d) The inventory depletion rate is the same for both models.
e) The two models use different formulas to compute annual holding cost.
Which of the following statements is not correct?
a) A function with multiple variables can be linear.
b) If a constraint is violated, then the problem is infeasible.
c) A Linear Program as described in Supplement B can have more than one objective
function if it has only one constraint.
d) Non-negativity constraints should be added to Linear Programs when the decision
variable represents units of production.
e) An unbounded solution to a mathematical program may occur if there is not a
constraint stopping the objective function value from continuing towards -∞.
page-pfb
In a periodic review system, if you are basing your time between orders on the EOQ,
what should be its length in weeks?
a) EOQ / 52
b) EOQ / average weekly demand
c) average weekly demand / EOQ
d) 52 / EOQ
e) (EOQ)(average weekly demand)
A disadvantage of the level aggregate plan is _________________.
a) workforce instability
b) excess hiring
c) layoffs
d) possible poor customer service from extensive use of backorders
e) excessive purchase of additional tools and equipment
page-pfc
Describe the two aspects to implementing the six-sigma concept.
Why are operations management decisions typically more complex for large companies
than for small companies?
Global competition forces firms to offer _____________________ products.
page-pfd
Tactical decisions can be distinguished from strategic decisions by what set of
characteristics?
Describe advantages and disadvantages of periodic review systems.
Describe why service organizations have tended to lag manufacturing organization in
the application of SQC.
page-pfe
Describe why marketing should be involved in the product design process.
Eli Goldratt's approach to continuous improvement is called ____________.
What is the break-even volume given a fixed cost of $100,000, a variable cost per unit
of $30, and a selling price of $35?