In TQM the role of the employee is very similar to earlier requirements.
If using slack per remaining operations (S/RO) as the scheduling rule, the job with the
least slack per remaining operations has the highest priority.
Backward scheduling develops the LS and LF times.
Project managers use network planning techniques to assign resources to activities.
page-pf2
Slack values for non-binding constraints are equal to 0.
Output/(all inputs used) is called total productivity.
Changing from a multi-line model to a single-line model is most appropriate when the
company is concerned about fairness for its customers.
Removing safety time from the individual activities and putting the total safety time at
the end of the critical path creates a project buffer.
page-pf3
The theoretical minimum number of stations results in the production of daily
requirements when no inefficiency exists.
Facilities decisions are part of the production process infrastructure.
Consider an MPS record. An MPS shipment amount is always set equal to the absolute
value of the amount in the projected available row if that amount is negative.
page-pf4
Typically the job chosen for the time study will be a routine job that is labor intensive.
TQM promotes employees to identify problems and pass onto someone else.
Cause-and-effect diagrams are problem solving tools commonly used by quality control
teams.
In Linear Programming models, what do you want to do with the objective?
a) upsize or downsize
b) rightsize or wrongsize
c) maximize or minimize
d) memorize
e) popularize
page-pf5
Constraints that are not at their limits at the optimal solution of a Linear Program, that
is, with the left-hand-side value not equal to the right-hand-side value, are called
_________________________.
a) inequality constraints
b) non-binding constraints
c) binding constraints
d) limiting constraints
e) shadow constraints
In the 'Solver Options' box of Excel Solver, what should be checked to ensure that all
decision variables are ≥ 0?
a) Assume Linear Model
b) Use Automatic Scaling
c) Assume Positive
d) Assume Non-Negative
e) Assume Nonzero
page-pf6
Inspectors want to develop process control charts to measure the weight of crates of
wood. Data (in pounds) from three samples are:
(a) What is the upper control limit for the R chart?
(b) What is the lower control limit for the R chart?
(c) What is the upper control limit for the x-bar chart?
(d) What is the lower control limit for the x-bar chart?
(e) Is the process in a state of control? If not, why not?
page-pf7
Consider the following information.
(a) Determine the sample size needed if the standard time estimate is to be within 1% of
the true mean 90% of the time.
(b) Calculate the normal time for each work element.
(c) Using an allowance factor of 10% based on job time; calculate the standard time for
each work element and for the entire job.
(d) Based on the standard time, how many units should an employee performing at
100% of standard complete during an 8-hour day?
One common definition of quality is __________, which focuses on measuring how
well the product or service meets targets and tolerances determined by its designers.
a) Fitness for use
b) Value for price paid
c) Technical perception
d) Judgmental evaluation
e) Conformance to specifications
page-pf8
JIT production workers
a) Keep data to themselves
b) Participate in team problem-solving activities
c) Do not understand data
d) Never use data
e) Rely on others to do data analysis
Which of the following is not a correctly stated step of the CPOPF method?
a) Determine the appropriate planning factors using forecasted demand data.
b) Multiply the MPS quantities by the appropriate planning factor.
c) Sum capacity requirements for each resource by time period.
d) Allocate capacity requirements to individual work centers based on historical
percentages.
e) Evaluate the workload at each resource to validate MPS feasibility.
page-pf9
The master production schedule is typically stated as:
a) resource requirements
b) sales quotas
c) work-in-process
d) specific finished goods
e) composite products
What term refers to attaining levels of productivity and competitiveness that are not
possible through normal supplier relationships?
a) Intimacy
b) Vision
c) Impact
d) Power
e) Collusion
page-pfa
Ritz-Carlton employees are empowered to spend up to how much money on the spot to
correct any customer complaint?
a) $25
b) $50
c) $100
d) $1000
e) $2000
Disadvantages of individual incentive systems include all except which of the
following?
a) They undermine teamwork.
b) A study has shown they had no effect on worker performance.
c) They avoid the 'free-rider' problem.
d) They need a significant amount of data collection.
e) They give employees a short-term focus.
Which of the following is not true concerning replenishment orders?
a) They are generated when there is not enough inventory.
page-pfb
b) MRP specifies when to place the order.
c) The order may be for material from a supplier.
d) They are orders for the final product.
e) The order may be for material from the manufacturing floor.
The objective of quality at the source is not only to identify a quality problem, but also
to
a) Determine its extent
b) Uncover its root cause
c) Rate its seriousness
d) Place blame
e) Categorize it
NAFTA and the EU are _________________________.
a) certification groups
b) regional trade agreements
c) quality control methods
d) logistics providers
page-pfc
e) U.S. government agencies
_____________________ capacity can serve to intimidate and preempt competitors
from entering the market.
a) Design
b) Flexible
c) Extra
d) Effective
e) Focused
A high-volume paper mill is an example of which layout type?
a) inverted
b) circular
c) process
d) fixed position
e) product
page-pfd
An activity has eight weeks allotted to it, but we should be able to do it in five weeks.
Waiting three weeks before getting started on it is an example of the
_____________________.
a) project buffer approach
b) common sense approach
c) professor approach
d) academic approach
e) student syndrome
What can be used to display graphically the scheduled times for activities?
a) an AOA network diagram
b) an AON network diagram
c) a project structure tree
d) a Gantt chart
e) an affinity diagram
page-pfe
Leveraging core competence is about sharing:
a) workers
b) knowledge
c) machines
d) expenses
e) financial hedges
Companies that use back orders are asking their customers to ___________________.
a) resubmit their orders
b) wait for delivery of the product
c) check back to see what their last order was
d) receive the product immediately and pay for it later
e) send back their last order
Who popularized the moving assembly line?
a) James Watt
page-pff
b) Adam Smith
c) Eli Whitney
d) Frederick W. Taylor
e) Henry Ford
Which of the following is least likely to be considered an infinite customer population?
a) subassemblies in a just-in-time manufacturing environment
b) customers in an amusement park
c) a class of 500 students who might visit their professor during office hours
d) customers in a grocery store
e) cars taking Exit 76 off of a freeway during rush hour
Global Metalworks can produce its own hinges for a weekly cost of $96,400 and a cost
per hinge of $0.10. Currently an outside supplier is used for a weekly cost of $82,500
and a cost per hinge of $0.24. Current weekly demand is 98,000 units. How much larger
must weekly demands grow in order to make insourcing economical?
page-pf10
Cycle time assumes that each workstation has ____________ time to work on a
product.
What are the characteristics of overtime?
What transactions can cause information in the inventory records file to change?
page-pf11
What are the three major categories of holding costs?
What is the target inventory if Frank's dairy inventory review is every 7 days and they
consume an average of 15 cases of milk cartons every day? Frank's new milk carton
supplier says they can deliver an order every 5 days. While Frank's material coordinator
says they should order 45 cases at a time, what is their target inventory level if they do
not want to maintain a safety stock?
What inventory function protects against supply shortages?
What are the three kinds of constraints defined by TOC?