BUSOP 509 Final
In what company were the Hawthorne Studies conducted? a) Westinghouse b) General Electric c) Hawthorne Incorporated d) General Motors e) Western Electric A firm has had the following order history over the last 4 months: What is the weighted moving […]
OPMGT 876
What term tells us how frequently a product is completed? a) output rate b) task time c) station time d) cycle time e) output time If the upper control limit for a c-chart is 28 and the lower control limit […]
MSE 280 Final
When evaluating location alternatives the firm should look at a) only qualitative factors b) only quantitative factors c) both qualitative and quantitative factors d) weighted average values e) decision support models only In break-even analysis, what is the break-even point? […]
MSE 597 Test 1
Given the following data: The end product J is made from components K and L. Component K is made from M and N. The authorized MPS calls for 10 J to be completed in week 2, 30 J to be […]
OPMT 627 Quiz 3
A company’s accepted time studies are stored in a(n) ____________ for possible future use. a) file cabinet b) time study vault c) warehouse d) jar e) elemental time database Consider a packaged milk products supply chain. A lumber company provides […]
BUS 853
The items listed below are stored in a one-dock warehouse. Which of them should be stored at the very front (closest to the dock)? a) ‘Star Trek’ videos b) ballet videos c) Tom Cruise videos d) ‘The Simpsons’ videos e) […]
OPMGT 449
In the ‘liquid’ portion of the MPS, the master scheduler generally has the authority to approve what changes? a) product mix b) changes needing extra resources (already authorized by the aggregate plan) c) product mix and changes needing extra resources […]
BUS 605 Midterm 1 The most
The most important factor in the success or failure of TQM efforts is a) Getting started quickly b) The use of statistical process control c) The genuineness of the organization’s commitment d) The use of cause-and-effect diagrams e) Employee training […]
BUSOPMT 834 Test 1
In making specific changes to JIT manufacturing, which of the following steps should come first? a) reduce lot sizes and lead times b) switch to pull production c) reorganize workplace d) reduce setup times e) implement layout changes In the […]
QSO 785 Midterm 1
Cost data Capacity data Demand data Develop a chase aggregate plan without inventory and back orders. Do no hiring or firing. When demand exceeds regular production, use overtime up to its maximum and then subcontracting. When demand is less than […]
OPMT 473 Quiz 3
Magnatree is a large company that has been working on a new product. This product has tremendous potential, but Magnatree must move quickly. They have decided that they will introduce the product in two months and have already started developing […]
OPMT 525 Quiz 3
Which of the following is a measure of how long after the due date the job is completed? a) job belatedness b) mean flow time c) makespan d) job overdueness e) job tardiness Something you would not expect to see […]
BUSOPMT 192 Midterm 1
Consider the following partial MPS record. Beginning inventory is 80 units. When should the first MPS shipment be scheduled? a) period 1 b) period 2 c) period 3 d) period 4 e) period 5 Consider the following partial MPS record. […]
MSE 850 Final
What costs are considered in the basic EOQ model? a) annual ordering costs + annual holding costs b) annual purchasing costs + annual holding costs c) annual ordering costs + annual holding costs + annual shortage costs d) annual purchasing […]
BUS 764 Midterm 2
Which of the following does not have a button for automatic insertion into the custom footer box? a) file name b) worksheet name c) author name d) date e) time The Answer Report Target Cell, Adjustable Cell, and Constraint sections […]
Operation Management 606
Which of the following is equivalent to ‘=SUMPRODUCT(A1:A4,B2:B6)’? a) A1*A4 + B2*B6 b) A1*B2 + A2*B3 + A3*B4 + A4*B5 c) (A1+A4)*(B2+B6) d) (A1+A2+A3+A4)*(B2+B3+B4+B5+B6) e) This is an invalid function. In Excel, which function returns the number of cells containing […]
OPMGT 361 Test
Which of the following is true? a) A line with a lower cycle time has greater output than one with a higher cycle time. b) A line with a higher cycle time has greater output than one with a lower […]
Operation Management 344 Quiz 2
An action notice is generated ________________________________________. a) for planned orders in any period b) only for orders that are to be released to the shop floor c) only for movements to and from the warehouse d) only when marketing needs […]
BUS 635 Midterm 2
Which company is widely considered to be the leader of just-in-time production? a) Ford b) Timex c) Gateway d) Toyota e) Sony In Excel, how can one select cells in a range without using the mouse? a) Ctrl+Arrow Keys b) […]
OPMGT 652
According to the textbook, the way to reduce the ppm defective is to a) change product specifications b) increase process capability c) increase the number of inspection points. d) employ more inspectors e) increase process throughput Capacity planning is difficult […]
OIM 365 Final
OM’s transformation role is to add value. Value added is a) performing activities well for the least possible cost b) the net decrease between output product value and input material value c) increasing product value in the first stage d) […]
MSE 756 Homework
To add Cell Comments for a cell in Excel, right-click and choose ____________________. a) Insert Comment b) Format Cells’¦ c) Hyperlink’¦ d) Insert’¦ e) Pick From List’¦ Which of the following can be calculated for an activity once ES, EF, […]
BUSOP 887
Which forecasting method seeks to develop a consensus among a group of experts? a) Market research b) Executive opinion c) Delphi method d) Naïve method e) Gamma method If a company carries 13 weeks of supply, what is the inventory […]
OPMT 262
What are the three elements of the service package? a) physical goods, sensual benefits, and psychological benefits b) sales, return policy, and warranty c) customer service, return policy, and warranty d) kindness, information provision, and speed e) physiological benefits, sensual […]
BUS 561 Quiz 2
Which of the following would probably not benefit from the use of critical path scheduling? a) constructing a new bridge over the Mississippi River b) moving the company’s credit card center to a new city c) building a new natural […]
OPMGT 451 Quiz 2
What occurs when a customer enters one line and then switches to a different line in an effort to reduce his or her waiting time? a) balking b) walking c) reneging d) vacillating e) jockeying Which of the following is […]
Operation Management 768 Midterm 1
Local wage rates, presence of local unions, and attitudes of local workers would be major factors for location decisions for businesses that ________________________. a) are labor intensive b) have perishable products c) have high transportation costs d) have need for […]
MGMT 242 Quiz
We use _____________________ time estimates when we can make a reliable estimate. a) variable b) probabilistic c) estimated d) deterministic e) cumulative What movement started with the publication of the results of the Hawthorne studies? a) scientific management b) human […]
Operation Management 490 Homework
Management has decided to add capacity incrementally in smaller chunks as needed, rather than purchasing one large facility. This decision ____________________. a) is very risky b) will result in low initial costs c) will ultimately result in lower costs per […]
Operation Management 893
Increasing the level of responsibility of a job by adding planning and coordination tasks is ___________. a) job enlargement b) job rotation c) job involvement d) job enrichment e) job backward integration If using CR as the priority rule, which […]
BUSOPMT 442 Test 2
Removing safety time from the individual activities and putting the total safety time at the end of the critical path creates a(n) ___________________. a) project safety net b) project buffer c) overconfident project manager d) activity shortage e) larger number […]
OIM 414 Midterm 1
JIT manufacturing cannot succeed if set-up costs are too high. For the general warehouse layout problem, the department with the highest ratio of trips to areas needed should be located closest to the dock. Answer: True An error in replenishment […]
OPMGT 120
Time series models are generally more difficult to use than causal models. Inventory turnover is the reciprocal of weeks of supply. Answer: False The first mathematical model for inventory management was developed by Elton Mayo. Answer: False If the number […]
OPMGT 436
Suppose that the formula in cell C8 is ‘=H2+$P6’. If cell C8 is copied to cell E7, the formula in cell E7 will be ‘=J1+R5’. Whenever demand exceeds supply, the company experiences a lost sale. Answer: False In Excel, you […]
QSO 234 Test 2
Quality control approaches are part of the production process infrastructure. In general, scheduling resources is less challenging under a process layout than it would be under a product layout. Answer: False Two types of information needed when measuring capacity is […]
MGMT 655 Quiz
Operations management is the central core function of every company. Planalytics is a company that helps businesses use weather data to make their business plans. Answer: True Marketing is not highly affected by layout planning. Answer: False Benchmarking should only […]
OIM 844 Midterm
Scheduled receipts are replenishment orders that have been placed but not yet received. Efficiency means being able to perform most activities. Answer: False In a fixed position layout, resources are fixed in various locations and the products move from one […]
QSO 896 Test 2
Buying a competitor’s new product and studying its design features by disassembling it and analyzing its parts and features is reverse engineering. Quality Function Deployment (QFD) enhances communication between marketing, operations, and engineering functions. Answer: True Operations Strategy is developed […]
OIM 854 Homework
George Dantzig developed the Simplex Method in 1947. The cost of space in Silicon Valley is higher now than it was in the late 1990s. Answer: False An order released to the shop floor authorizes withdrawal of the needed materials […]
MGMT 519
In TQM the role of the employee is very similar to earlier requirements. If using slack per remaining operations (S/RO) as the scheduling rule, the job with the least slack per remaining operations has the highest priority. Answer: True Backward […]
BUSOP 592 Midterm
The financial plan indicates the sources and uses of funds, expected cash flows, anticipated profits and projected budgets. A Gantt chart is a basic scheduling tool for low-volume systems. Answer: True Predetermined time data is a published database of elemental […]
OPMGT 243 Midterm
Using the Tibrewala, Phillippe, and Brown technique for a Monday through Sunday work week a regular, full time employee can end up with a Sunday-Monday set of days off. Changes to the MPS that are requested inside of the demand […]
BUSOP 315 Quiz
An excellent procedure that can be used with location factors that are qualitative is the factor rating method. Firms should balance the flow rather than the process. Answer: False A min-max inventory system implies a larger average inventory than a […]
OIM 529
Risk costs are obsolescence, damage deterioration, theft, insurance and taxes. An increase in the desired confidence level will decrease the number of observations necessary in a time study. Answer: False Statistical packages such as SPSS, SAS, and Minitab, are types […]
BUSOP 862
Overtime is the most common method for increasing output capacity. Even though loss of customer goodwill is an intangible cost, it is considered a type of shortage cost. Answer: True Output-based incentive systems are based on the assumption that some […]
MSE 672 Homework
Productivity gains in the service sector have been much lower than that of manufacturing. When possible, managers should purchase and use CRAFT because it gives an optimal solution to the facility layout problem. Answer: False A key outcome of JIT […]
BUS 697 Quiz 1
Companies that have low customer contact and are capital intensive, yet provide a service, are called service factories. A useful tool for translating customers’ everyday language into specific technical requirements is Quality Function Deployment. Answer: True The MATCH function in […]
OPMGT 349
In Excel, when moving a formula to another cell, it is better to use Copy and Paste rather than Cut and Paste. Rationing and shortage gaming occur when supply exceeds demand. Answer: False The TOC focuses on correct placement of […]
MGMT 224
Lot-for-lot ordering is commonly used in materials requirements planning systems. A firm can hedge exchange rate risk by establishing links with suppliers in a variety of countries. Answer: True The single-period inventory model objective is to balance the sale of […]
OPMGT 730 Midterm 1
An example of an output measure of capacity is labor hours. Shipments should spend less than 24 hours in a crossdock. Answer: True Capacity decisions at the strategic level include the size of workforce. Answer: False Solving a decision tree […]