Mathematics Chapter 8 Homework Problem 8-42 If rate is unchanged or decreases

Mathematics Chapter 8 Homework Problem 8-42 If rate is unchanged or decreases

Lock-in now -$1,000 0.3 0.5 Increase 0.5% Increase 0.5% 1 -$4,800 -$2,900 -$4,800 0.25 Don’t lock-in 1 month Unchanged 2 -$2,400 -$270 -$3,000 -$2,400 0.25 Decrease 0.5% $0 $0 Lock-in 1 month -$500 -$500 0.5 0.25 Don’t lock-in now Unchanged […]

1 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-41 Pilot Study 018 Good Market 0745 0900

Mathematics Chapter 8 Homework Problem 8-41 Pilot Study 018 Good Market 0745 0900

0.78 Good market 0.45 Poor market Positive result 0.500 1 0.500 0.851 Not Produce 0.800 0.800 Questionnaire 0.27 0.823 Good market 0.950 Produce 0.950 0.622 0.73 0.55 Poor market Negative result 0.500 2 0.500 0.800 Not Produce 0.800 0.800 0.89 […]

2 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-40 Good Market 120000 Produce 140000 

Mathematics Chapter 8 Homework Problem 8-40 Good Market 120000 Produce 140000 

0.78 Good market (a) Conduct questionnaire. $135,000 If positive, produce razor. Produce $140,000 $135,000 0.27 -$5,000 $35,824 Good market $135,000 Produce $140,000 $135,000 $0 -$28,520 0.73 0.55 Poor market Negative result -$89,000 2 -$84,000 -$89,000 $0 -$5,000 Not Produce -$5,000 […]

1 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-39 Monetary Value Risk Seeker 2400 

Mathematics Chapter 8 Homework Problem 8-39 Monetary Value Risk Seeker 2400 

Dollar Utility -$600 0.00 -$500 0.03 $550 0.17 $3,400 0.90 $3,500 1.00 0.75 Risk seeker. -$600 $0 $600 $1,200 $1,800 $2,400 $3,000 $3,600 Monetary value Problem 8-39 (b) 0.00 0.25 0.50 1.00 Utility Utility Curve -$50 0.10 $400 0.15

1 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-38 Sell Land 50 063 Negative 50 50

Mathematics Chapter 8 Homework Problem 8-38 Sell Land 50 063 Negative 50 50

Test land. If test is positive, drill. If test is negative, sell. Expected profit = $427,300. Sell land 0.37 $650 $550 Positive 2 0.46 $0 $1,240 Oil $3,400 Drill Land $4,000 $3,400 -$500 $1,240 0.54 Test land Dry -$600 -$100 […]

1 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-37 If test is negative, sell Land 50 Negative 

Mathematics Chapter 8 Homework Problem 8-37 If test is negative, sell Land 50 Negative 

Test land. If test is positive, drill. If test is negative, sell. Expected profit = $565,000. Sell land 0.3 $650 $550 Positive 2 0.65 $0 $2,000 Oil $3,400 Drill Land $4,000 $3,400 -$500 $2,000 0.35 Test land Dry -$600 -$100 […]

1 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-36 Lose Point If serve bad, use hard 2nd serve.

Mathematics Chapter 8 Homework Problem 8-36 Lose Point If serve bad, use hard 2nd serve.

0.75 Win point 0.00 0.00 0.000 0.75 Win point 0.65 1.00 Hard 1st serve Serve good 1.00 1.00 0.00 0.658 0.00 0.750 0.25 Lose point Hard 2nd serve 0.00 0.00 0.00 0.00 0.488 0.35 Serve bad 0.00 0.35 0.00 0.000 […]

2 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-35 Posterior probabilities GIVEN pilot works

Mathematics Chapter 8 Homework Problem 8-35 Posterior probabilities GIVEN pilot works

Conditional probabilities Prior Probabilities P(Pilot works | Facility works) = 0.80 P(Facility works) = 0.60 P(Pilot fails | Facility works) = 0.20 P(Facility fails) = 0.40 Problem 8-35 P(Pilot works | Facility fails) = 0.15 P(Pilot fails | Facility fails) […]

2 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-34 If pilot plant succeeds, build facility

Mathematics Chapter 8 Homework Problem 8-34 If pilot plant succeeds, build facility

0.85 Facility works 0.60 Facility fails Pilot works -$885,000 1 -$825,000 –$885,000 $0 $390,000 Don’t build -$60,000 $0 -$60,000 Build pilot 0.20 -$60,000 $210,000 Facility works $615,000 Build facility $675,000 $615,000 $0 -$585,000 0.80 0.40 Facility fails Pilot fails -$885,000 […]

1 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-33 Serve Bad 100 Use hard 1st serve.

Mathematics Chapter 8 Homework Problem 8-33 Serve Bad 100 Use hard 1st serve.

Problem 8-33 0.75 Win point Accept the wager. 0.65 $100 0.75 Win point 0.65 $100 Hard 1st serve Serve good $100 $100 $0 $31.63 $0 $50 0.25 Lose point Hard 2nd serve -$100 -$100 -$100 $0 -$3 0.35 Serve bad […]

1 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-32 Competitor Low 95000 Competitor

Mathematics Chapter 8 Homework Problem 8-32 Competitor Low 95000 Competitor

0.30 Competitor High 0.55 Our price high Competitor Medium $170,000 $0 $181,250 $250,000 $170,000 0.15 Competitor Low -$55,000 $25,000 -$55,000 0.20 Competitor High $395,000 475000 $395,000 0.75 0.70 Competitor Our price medium Competitor Medium 2 $245,000 $0 $260,000 $0 $260,000 […]

1 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-31 Cocoa 20 If he says “bad chance”, take cocoa.

Mathematics Chapter 8 Homework Problem 8-31 Cocoa 20 If he says “bad chance”, take cocoa.

0.83 Sunny (a) Hire Elmo. $16 If he says “good chance”, take lemonade. Cocoa $20 $16 If he says “bad chance”, take cocoa. 0.3 $76 Bad chance $80 $76 1 $0 $61.00 0.25 Sunny $56 Lemonade $60 $56 1 $50.36 […]

1 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-30 New Blower Seasonably Cold 025 Moderate Snow

Mathematics Chapter 8 Homework Problem 8-30 New Blower Seasonably Cold 025 Moderate Snow

P8-30 0.4 EVSI = $101.88 Heavy snow EVwPI $340.00 $700 Max EMV = $125.00 $700 EVPI = $215.00 Efficiency = 47.38% 0.3 New blower Moderate snow $200 Dont hire Adams $0 $70.00 $200 3 $0 $125.00 0.3 Light snow -$900 […]

1 Pages | June 13, 2023
Mathematics Chapter 8 Homework Problem 8-29 All Costs Have Been Expressed Negative Amounts

Mathematics Chapter 8 Homework Problem 8-29 All Costs Have Been Expressed Negative Amounts

0.6 1% defect 0.25 Buy from A 3% defect -$180 $0 -$126 -$180 -$180 0.15 5% defect -$300 -$300 -$300 1 -$126 0.3 1% defect -$23 -$60 -$23 0.4 Buy from B 3% defect -$143 $37 -$143 -$180 -$143 0.3 […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-37a Immed Optim Most Likely Pessim

Mathematics Chapter 7 Homework Problem 7-37a Immed Optim Most Likely Pessim

Activity Immed pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation R L, M 1 2 3 2.00 0.11 0.33 15.00 17.00 26.50 28.50 11.50 N S N 6 6 9 6.50 0.25 […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-36 Activity Immediate Optim Most Likely Pessim Expected

Mathematics Chapter 7 Homework Problem 7-36 Activity Immediate Optim Most Likely Pessim Expected

Activity Immediate pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation G B 2.0 4.0 6.0 4.00 0.44 0.67 3.50 7.50 15.00 19.00 11.50 N I C 9.0 10.0 14.0 10.50 0.69 0.83 […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-35 Some Elective Courses Have Prerequisites While Others

Mathematics Chapter 7 Homework Problem 7-35 Some Elective Courses Have Prerequisites While Others

The overall purpose of Problem 7-35 is to have students use a project approach in attempting to solve a problem that almost all students face. The first step is for students to list all courses that they must take, including […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-34 Variance deviation Slack Critical?

Mathematics Chapter 7 Homework Problem 7-34 Variance deviation Slack Critical?

Activity Immediate predecessors Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LST Slack Critical? 1—1.00 4.00 7.00 4.00 1.000 1.00 0.00 4.00 7.50 11.50 7.50 N 2—2.00 3.00 4.00 3.00 […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-33 Immediate Optim Most Likely

Mathematics Chapter 7 Homework Problem 7-33 Immediate Optim Most Likely

Activity Immediate pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LST Slack Critical? 1 – 3 4 5 4.00 0.11 0.33 0.00 4.00 0.00 4.00 0.00 Y 2 1 […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-32 Constraints Solution value

Mathematics Chapter 7 Homework Problem 7-32 Constraints Solution value

Activity Normal time Crash time Normal cost Crash cost Crash cost per day A 7 5 $2,000 $3,500 $750 B10 8$3,000 $4,700 $850 Problem 7-32 C 8 7 $3,400 $3,700 $300 D 6 4 $1,600 $2,600 $500 E 7 4 […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-31 Start Solution value Crash cost

Mathematics Chapter 7 Homework Problem 7-31 Start Solution value Crash cost

Activity Normal time Crash time Normal cost Crash cost Crash cost per day A 4 2 $2,000 $2,600 $300 B 6 5 $3,500 $4,300 $800 Problem 7-31 C 8 6 $3,300 $3,900 $300 D 5 4 $1,200 $1,800 $600 E […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-30 Crash limit A Crash project to (weeks)

Mathematics Chapter 7 Homework Problem 7-30 Crash limit A Crash project to (weeks)

TATBTCTDTETFTGTEnd CACBCCCDCECFCG Start A Start B Start C Start D Start E Start F Start G Start End Crash A Crash B Crash C Crash D Crash E Crash F Crash G Crash limit C 1 0 <= 0 Crash […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-29 Solution Value Crash Cost Constraints

Mathematics Chapter 7 Homework Problem 7-29 Solution Value Crash Cost Constraints

TATBTCTDTETFTGTHCACBCCCDCECFCGCH Start A Start B Start C Start D Start E Start F Start G Start H Crash A Crash B Crash C Crash D Crash E Crash F Crash G Crash H G –> H -1 1 1 5 […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-28 Total Activity cost ($) completed cost

Mathematics Chapter 7 Homework Problem 7-28 Total Activity cost ($) completed cost

Activity Budgeted cost ($) % completed Value of work completed Actual cost ($) Difference ($) A$2,200 100% $2,200 $1,900 -$300 Problem 7-28 B$5,100 100% $5,100 $5,300 $200 C$6,000 100% $6,000 $6,150 $150 D$3,600 40% $1,440 $1,800 $360 E$2,700 60% $1,620 […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-27 Act Pred Time Budget per day Cumulative budget

Mathematics Chapter 7 Homework Problem 7-27 Act Pred Time Budget per day Cumulative budget

Problem 7-27 B D F A C E Using EST: Act Pred Time Cost Cost/P d EST EFT LST LFT 1 2 3 4 5 6 7 8 9 10 11 12 Using LST: A##### ##### B $1,700 $1,700 $1,700 […]

3 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-26 Total Actual Difference completed cost

Mathematics Chapter 7 Homework Problem 7-26 Total Actual Difference completed cost

Activity Budgeted cost ($) % completed Value of work completed Actual cost ($) Difference ($) A$10,000 100% $10,000 $13,000 $3,000 B$14,000 100% $14,000 $12,000 -$2,000 Problem 7-26 C$5,000 100% $5,000 $6,000 $1,000 D$6,000 100% $6,000 $6,000 $0 E$14,000 60% $8,400 […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-25 Using Budget Chart EST Budget

Mathematics Chapter 7 Homework Problem 7-25 Using Budget Chart EST Budget

Using EST: Act Time Cost Cost/P d EST LST 12345678910 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 A 6 ###### ##### […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-24 Total 183380 Underrun

Mathematics Chapter 7 Homework Problem 7-24 Total 183380 Underrun

Activity Budgeted cost ($) % completed Value of work completed Actual cost ($) Difference ($) A$22,000 100% $22,000 $20,000 -$2,000 Problem 7-24 B$30,000 100% $30,000 $36,000 $6,000 C$26,000 100% $26,000 $26,000 $0 D$48,000 100% $48,000 $44,000 -$4,000 E$56,000 55% $30,800 […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-23 Mean (weeks) Standard deviation (weeks)

Mathematics Chapter 7 Homework Problem 7-23 Mean (weeks) Standard deviation (weeks)

Problem 7-23 Mean (weeks) 25 (a) P(need <= 30 weeks) = 0.8944 (b) P(need <= 22 weeks) = 0.2266 (c) 99% completion time = 34.31 (d) 85% completion time = 29.15 Standard deviation (weeks) 4

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-22 need Months Standard deviation (months)

Mathematics Chapter 7 Homework Problem 7-22 need Months Standard deviation (months)

Problem 7-22 Mean (months) 21 Variance (months^2) 6 Standard deviation (months) 2.4495 (a) P(need >= 17 months) = 0.9488 (b) P(need <= 20 months) = 0.3415 (c) P(need >= 23 months) = 0.2071 (d) P(need <= 25 months) = 0.9488

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-21 Activity Pred Optim Most likely Pessim Expected

Mathematics Chapter 7 Homework Problem 7-21 Activity Pred Optim Most likely Pessim Expected

Problem 7-21 H A D C F B I G E J Start Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LST Slack Critical? A – 3 7 […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-20 Optim Most likely Pessim Expected

Mathematics Chapter 7 Homework Problem 7-20 Optim Most likely Pessim Expected

Problem 7-20 C I G E B H F A D Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LST Slack Critical? A – 4 8 12 8.00 […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-19 Activity Pred time (a) time (m) time (b)

Mathematics Chapter 7 Homework Problem 7-19 Activity Pred time (a) time (m) time (b)

Problem 7-19 F I A D K C B H G E Start J L End Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LST Slack Critical? A […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-18 Project variance Project std deviation

Mathematics Chapter 7 Homework Problem 7-18 Project variance Project std deviation

Problem 7-18 B I E C D H F A G Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LFT Slack Critical? A – 3 6 6 5.50 […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-17 Start End Problem 717 Optim

Mathematics Chapter 7 Homework Problem 7-17 Start End Problem 717 Optim

Problem 7-17 A H F C B I D Start E G J K End Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LFT Slack Critical? A – […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-16 A10 Critical Path Project

Mathematics Chapter 7 Homework Problem 7-16 A10 Critical Path Project

Problem 7-16 A2 A5 A9 A3 A4 A6 A10 A7 A1 End A8 Activity Time EST EFT LST LST Slack Critical? A1 5 0 5 0 5 0 Y A2 6 5 11 612 1 N A3 2 5 7 […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-15 Critical Paths Beg Project Length Days

Mathematics Chapter 7 Homework Problem 7-15 Critical Paths Beg Project Length Days

Problem 7-14 A C G B D E H F Start End Activity Time EST EFT LST LFT Slack Critical? A 5 0 5 2 7 2 N B 4 0 4 0 4 0 Y Problem 7-15 C 2 […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-14 Activity Time EST EFT

Mathematics Chapter 7 Homework Problem 7-14 Activity Time EST EFT

Problem 7-15 H K C B D E J F A End G I Activity Time EST EFT LST LFT Slack Critical? A 4 0 4 0 4 0 Y B 6 4 10 410 0 Y C12 10 22 […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-13 Project length = 17 weeks

Mathematics Chapter 7 Homework Problem 7-13 Project length = 17 weeks

Problem 7-13 A D G B C E H F Start End Activity Time EST EFT LST LFT Slack Critical? A 4 0 4 0 4 0 Y B 6 0 6 1 7 1 N Problem 7-13 C 3 […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Problem 7-12 Critical Path Bdeg Project Length Days

Mathematics Chapter 7 Homework Problem 7-12 Critical Path Bdeg Project Length Days

Problem 7-12 B C D E A F G Start Activity Time EST EFT LST LFT Slack Critical? A 2 0 2 13 15 13 N B 5 0 5 0 5 0 Y Problem 7-12 C 1 0 1 […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Latest Activity Start Times Are Determined Making

Mathematics Chapter 7 Homework Latest Activity Start Times Are Determined Making

these estimates, the expected completion time and completion variance can be determined. CPM allows the use of crashing. This technique allows a manager to reduce the total project completion time by expending additional resources on activities within the network. CPM […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework Critical Path Project Length Project Variance Project

Mathematics Chapter 7 Homework Critical Path Project Length Project Variance Project

Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Exp time Var Std dev C A 50.00 60.00 100.00 65.00 69.44 8.33 30.00 95.00 30.00 95.00 0.00 Y E B 25.00 30.00 35.00 30.00 2.78 1.67 90.00 […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Southwestern University Days From The Current

Mathematics Chapter 7 Homework Southwestern University Days From The Current

total cost of $15,000. To further crash the project to 240 days from the current 250 days, we crash activity D by 10 days at $1,900/day, for a total cost of $19,000. Hence, the total additional cost to crash the […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Shale Oil Company Optim Most likely Pessim

Mathematics Chapter 7 Homework Shale Oil Company Optim Most likely Pessim

Activity Predecessors Optim time (a) Most likely time (m) Pessim time (b) Exp time Var Std dev EST EFT LST LFT Slack Critical? Critical path = 1 – 1.0 2.0 2.5 1.92 0.06 0.25 0.00 1.92 0.00 1.92 0.00 Y […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Shale Oil Would Have Determine The Costs

Mathematics Chapter 7 Homework Shale Oil Would Have Determine The Costs

CHAPTER 7 PROJECT MANAGEMENT Internet Case Study: Shale Oil Company 1. The project network is shown below. See file Ch07 Internet Case Shale Oil.XLS. The expected shutdown time is 45.75 days. There are 9 activities on the critical path: 1, […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Bay Community Hospital Activity End Pred Critical

Mathematics Chapter 7 Homework Bay Community Hospital Activity End Pred Critical

Activity Pred Time EST EFT LST LFT Slack Critical? D B 4.0 4.0 8.0 6.0 10.0 2.0 N F C, E 2.0 8.0 10.0 8.0 10.0 0.0 Y End D, F 0.0 10.0 10.0 10.0 10.0 0.0 Y Critical path […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework If activity E on the critical path is reduced by one week using

Mathematics Chapter 7 Homework If activity E on the critical path is reduced by one week using

However, $300 is saved by allowing activity A (not on any of the critical paths) to take 3 weeks, yielding a net cost increase of $1,050. weeks, with a critical path of E-F. See file Ch07 Internet Case Bay Community.XLS, […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Alpha Beta Gamma Record

Mathematics Chapter 7 Homework Alpha Beta Gamma Record

Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Exp time Var Std dev EST EFT LST LFT Slack Critical? Critical path = A – 1.00 2.00 3.00 2.00 0.11 0.33 0.00 2.00 0.00 2.00 0.00 Y […]

2 Pages | June 13, 2023
Mathematics Chapter 7 Homework This Yields Standard Normal Value 48 Implying

Mathematics Chapter 7 Homework This Yields Standard Normal Value 48 Implying

the same as before, but has an expected length of only 31.0 days with a variance of 0.6944. This yields a standard normal value of 4.8 implying that it is almost certain that the issues will be sent out on […]

1 Pages | June 13, 2023
Mathematics Chapter 7 Homework Case Haygood Brothers Immed Optim Most Likely

Mathematics Chapter 7 Homework Case Haygood Brothers Immed Optim Most Likely

Activity Immed pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation I E 5 7 9 7.00 0.44 0.67 21.00 28.00 21.00 28.00 0.00 Y J D, I 10 11 12 11.00 0.11 […]