Mathematics Chapter 8 Homework Problem 8-42 If rate is unchanged or decreases
Lock-in now -$1,000 0.3 0.5 Increase 0.5% Increase 0.5% 1 -$4,800 -$2,900 -$4,800 0.25 Don’t lock-in 1 month Unchanged 2 -$2,400 -$270 -$3,000 -$2,400 0.25 Decrease 0.5% $0 $0 Lock-in 1 month -$500 -$500 0.5 0.25 Don’t lock-in now Unchanged […]
Mathematics Chapter 8 Homework Problem 8-41 Pilot Study 018 Good Market 0745 0900
0.78 Good market 0.45 Poor market Positive result 0.500 1 0.500 0.851 Not Produce 0.800 0.800 Questionnaire 0.27 0.823 Good market 0.950 Produce 0.950 0.622 0.73 0.55 Poor market Negative result 0.500 2 0.500 0.800 Not Produce 0.800 0.800 0.89 […]
Mathematics Chapter 8 Homework Problem 8-40 Good Market 120000 Produce 140000
0.78 Good market (a) Conduct questionnaire. $135,000 If positive, produce razor. Produce $140,000 $135,000 0.27 -$5,000 $35,824 Good market $135,000 Produce $140,000 $135,000 $0 -$28,520 0.73 0.55 Poor market Negative result -$89,000 2 -$84,000 -$89,000 $0 -$5,000 Not Produce -$5,000 […]
Mathematics Chapter 8 Homework Problem 8-39 Monetary Value Risk Seeker 2400
Dollar Utility -$600 0.00 -$500 0.03 $550 0.17 $3,400 0.90 $3,500 1.00 0.75 Risk seeker. -$600 $0 $600 $1,200 $1,800 $2,400 $3,000 $3,600 Monetary value Problem 8-39 (b) 0.00 0.25 0.50 1.00 Utility Utility Curve -$50 0.10 $400 0.15
Mathematics Chapter 8 Homework Problem 8-38 Sell Land 50 063 Negative 50 50
Test land. If test is positive, drill. If test is negative, sell. Expected profit = $427,300. Sell land 0.37 $650 $550 Positive 2 0.46 $0 $1,240 Oil $3,400 Drill Land $4,000 $3,400 -$500 $1,240 0.54 Test land Dry -$600 -$100 […]
Mathematics Chapter 8 Homework Problem 8-37 If test is negative, sell Land 50 Negative
Test land. If test is positive, drill. If test is negative, sell. Expected profit = $565,000. Sell land 0.3 $650 $550 Positive 2 0.65 $0 $2,000 Oil $3,400 Drill Land $4,000 $3,400 -$500 $2,000 0.35 Test land Dry -$600 -$100 […]
Mathematics Chapter 8 Homework Problem 8-36 Lose Point If serve bad, use hard 2nd serve.
0.75 Win point 0.00 0.00 0.000 0.75 Win point 0.65 1.00 Hard 1st serve Serve good 1.00 1.00 0.00 0.658 0.00 0.750 0.25 Lose point Hard 2nd serve 0.00 0.00 0.00 0.00 0.488 0.35 Serve bad 0.00 0.35 0.00 0.000 […]
Mathematics Chapter 8 Homework Problem 8-35 Posterior probabilities GIVEN pilot works
Conditional probabilities Prior Probabilities P(Pilot works | Facility works) = 0.80 P(Facility works) = 0.60 P(Pilot fails | Facility works) = 0.20 P(Facility fails) = 0.40 Problem 8-35 P(Pilot works | Facility fails) = 0.15 P(Pilot fails | Facility fails) […]
Mathematics Chapter 8 Homework Problem 8-34 If pilot plant succeeds, build facility
0.85 Facility works 0.60 Facility fails Pilot works -$885,000 1 -$825,000 –$885,000 $0 $390,000 Don’t build -$60,000 $0 -$60,000 Build pilot 0.20 -$60,000 $210,000 Facility works $615,000 Build facility $675,000 $615,000 $0 -$585,000 0.80 0.40 Facility fails Pilot fails -$885,000 […]
Mathematics Chapter 8 Homework Problem 8-33 Serve Bad 100 Use hard 1st serve.
Problem 8-33 0.75 Win point Accept the wager. 0.65 $100 0.75 Win point 0.65 $100 Hard 1st serve Serve good $100 $100 $0 $31.63 $0 $50 0.25 Lose point Hard 2nd serve -$100 -$100 -$100 $0 -$3 0.35 Serve bad […]
Mathematics Chapter 8 Homework Problem 8-32 Competitor Low 95000 Competitor
0.30 Competitor High 0.55 Our price high Competitor Medium $170,000 $0 $181,250 $250,000 $170,000 0.15 Competitor Low -$55,000 $25,000 -$55,000 0.20 Competitor High $395,000 475000 $395,000 0.75 0.70 Competitor Our price medium Competitor Medium 2 $245,000 $0 $260,000 $0 $260,000 […]
Mathematics Chapter 8 Homework Problem 8-31 Cocoa 20 If he says “bad chance”, take cocoa.
0.83 Sunny (a) Hire Elmo. $16 If he says “good chance”, take lemonade. Cocoa $20 $16 If he says “bad chance”, take cocoa. 0.3 $76 Bad chance $80 $76 1 $0 $61.00 0.25 Sunny $56 Lemonade $60 $56 1 $50.36 […]
Mathematics Chapter 8 Homework Problem 8-30 New Blower Seasonably Cold 025 Moderate Snow
P8-30 0.4 EVSI = $101.88 Heavy snow EVwPI $340.00 $700 Max EMV = $125.00 $700 EVPI = $215.00 Efficiency = 47.38% 0.3 New blower Moderate snow $200 Dont hire Adams $0 $70.00 $200 3 $0 $125.00 0.3 Light snow -$900 […]
Mathematics Chapter 8 Homework Problem 8-29 All Costs Have Been Expressed Negative Amounts
0.6 1% defect 0.25 Buy from A 3% defect -$180 $0 -$126 -$180 -$180 0.15 5% defect -$300 -$300 -$300 1 -$126 0.3 1% defect -$23 -$60 -$23 0.4 Buy from B 3% defect -$143 $37 -$143 -$180 -$143 0.3 […]
Mathematics Chapter 7 Homework Problem 7-37a Immed Optim Most Likely Pessim
Activity Immed pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation R L, M 1 2 3 2.00 0.11 0.33 15.00 17.00 26.50 28.50 11.50 N S N 6 6 9 6.50 0.25 […]
Mathematics Chapter 7 Homework Problem 7-36 Activity Immediate Optim Most Likely Pessim Expected
Activity Immediate pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation G B 2.0 4.0 6.0 4.00 0.44 0.67 3.50 7.50 15.00 19.00 11.50 N I C 9.0 10.0 14.0 10.50 0.69 0.83 […]
Mathematics Chapter 7 Homework Problem 7-35 Some Elective Courses Have Prerequisites While Others
The overall purpose of Problem 7-35 is to have students use a project approach in attempting to solve a problem that almost all students face. The first step is for students to list all courses that they must take, including […]
Mathematics Chapter 7 Homework Problem 7-34 Variance deviation Slack Critical?
Activity Immediate predecessors Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LST Slack Critical? 1—1.00 4.00 7.00 4.00 1.000 1.00 0.00 4.00 7.50 11.50 7.50 N 2—2.00 3.00 4.00 3.00 […]
Mathematics Chapter 7 Homework Problem 7-33 Immediate Optim Most Likely
Activity Immediate pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LST Slack Critical? 1 – 3 4 5 4.00 0.11 0.33 0.00 4.00 0.00 4.00 0.00 Y 2 1 […]
Mathematics Chapter 7 Homework Problem 7-32 Constraints Solution value
Activity Normal time Crash time Normal cost Crash cost Crash cost per day A 7 5 $2,000 $3,500 $750 B10 8$3,000 $4,700 $850 Problem 7-32 C 8 7 $3,400 $3,700 $300 D 6 4 $1,600 $2,600 $500 E 7 4 […]
Mathematics Chapter 7 Homework Problem 7-31 Start Solution value Crash cost
Activity Normal time Crash time Normal cost Crash cost Crash cost per day A 4 2 $2,000 $2,600 $300 B 6 5 $3,500 $4,300 $800 Problem 7-31 C 8 6 $3,300 $3,900 $300 D 5 4 $1,200 $1,800 $600 E […]
Mathematics Chapter 7 Homework Problem 7-30 Crash limit A Crash project to (weeks)
TATBTCTDTETFTGTEnd CACBCCCDCECFCG Start A Start B Start C Start D Start E Start F Start G Start End Crash A Crash B Crash C Crash D Crash E Crash F Crash G Crash limit C 1 0 <= 0 Crash […]
Mathematics Chapter 7 Homework Problem 7-29 Solution Value Crash Cost Constraints
TATBTCTDTETFTGTHCACBCCCDCECFCGCH Start A Start B Start C Start D Start E Start F Start G Start H Crash A Crash B Crash C Crash D Crash E Crash F Crash G Crash H G –> H -1 1 1 5 […]
Mathematics Chapter 7 Homework Problem 7-28 Total Activity cost ($) completed cost
Activity Budgeted cost ($) % completed Value of work completed Actual cost ($) Difference ($) A$2,200 100% $2,200 $1,900 -$300 Problem 7-28 B$5,100 100% $5,100 $5,300 $200 C$6,000 100% $6,000 $6,150 $150 D$3,600 40% $1,440 $1,800 $360 E$2,700 60% $1,620 […]
Mathematics Chapter 7 Homework Problem 7-27 Act Pred Time Budget per day Cumulative budget
Problem 7-27 B D F A C E Using EST: Act Pred Time Cost Cost/P d EST EFT LST LFT 1 2 3 4 5 6 7 8 9 10 11 12 Using LST: A##### ##### B $1,700 $1,700 $1,700 […]
Mathematics Chapter 7 Homework Problem 7-26 Total Actual Difference completed cost
Activity Budgeted cost ($) % completed Value of work completed Actual cost ($) Difference ($) A$10,000 100% $10,000 $13,000 $3,000 B$14,000 100% $14,000 $12,000 -$2,000 Problem 7-26 C$5,000 100% $5,000 $6,000 $1,000 D$6,000 100% $6,000 $6,000 $0 E$14,000 60% $8,400 […]
Mathematics Chapter 7 Homework Problem 7-25 Using Budget Chart EST Budget
Using EST: Act Time Cost Cost/P d EST LST 12345678910 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 A 6 ###### ##### […]
Mathematics Chapter 7 Homework Problem 7-24 Total 183380 Underrun
Activity Budgeted cost ($) % completed Value of work completed Actual cost ($) Difference ($) A$22,000 100% $22,000 $20,000 -$2,000 Problem 7-24 B$30,000 100% $30,000 $36,000 $6,000 C$26,000 100% $26,000 $26,000 $0 D$48,000 100% $48,000 $44,000 -$4,000 E$56,000 55% $30,800 […]
Mathematics Chapter 7 Homework Problem 7-23 Mean (weeks) Standard deviation (weeks)
Problem 7-23 Mean (weeks) 25 (a) P(need <= 30 weeks) = 0.8944 (b) P(need <= 22 weeks) = 0.2266 (c) 99% completion time = 34.31 (d) 85% completion time = 29.15 Standard deviation (weeks) 4
Mathematics Chapter 7 Homework Problem 7-22 need Months Standard deviation (months)
Problem 7-22 Mean (months) 21 Variance (months^2) 6 Standard deviation (months) 2.4495 (a) P(need >= 17 months) = 0.9488 (b) P(need <= 20 months) = 0.3415 (c) P(need >= 23 months) = 0.2071 (d) P(need <= 25 months) = 0.9488
Mathematics Chapter 7 Homework Problem 7-21 Activity Pred Optim Most likely Pessim Expected
Problem 7-21 H A D C F B I G E J Start Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LST Slack Critical? A – 3 7 […]
Mathematics Chapter 7 Homework Problem 7-20 Optim Most likely Pessim Expected
Problem 7-20 C I G E B H F A D Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LST Slack Critical? A – 4 8 12 8.00 […]
Mathematics Chapter 7 Homework Problem 7-19 Activity Pred time (a) time (m) time (b)
Problem 7-19 F I A D K C B H G E Start J L End Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LST Slack Critical? A […]
Mathematics Chapter 7 Homework Problem 7-18 Project variance Project std deviation
Problem 7-18 B I E C D H F A G Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LFT Slack Critical? A – 3 6 6 5.50 […]
Mathematics Chapter 7 Homework Problem 7-17 Start End Problem 717 Optim
Problem 7-17 A H F C B I D Start E G J K End Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation EST EFT LST LFT Slack Critical? A – […]
Mathematics Chapter 7 Homework Problem 7-16 A10 Critical Path Project
Problem 7-16 A2 A5 A9 A3 A4 A6 A10 A7 A1 End A8 Activity Time EST EFT LST LST Slack Critical? A1 5 0 5 0 5 0 Y A2 6 5 11 612 1 N A3 2 5 7 […]
Mathematics Chapter 7 Homework Problem 7-15 Critical Paths Beg Project Length Days
Problem 7-14 A C G B D E H F Start End Activity Time EST EFT LST LFT Slack Critical? A 5 0 5 2 7 2 N B 4 0 4 0 4 0 Y Problem 7-15 C 2 […]
Mathematics Chapter 7 Homework Problem 7-14 Activity Time EST EFT
Problem 7-15 H K C B D E J F A End G I Activity Time EST EFT LST LFT Slack Critical? A 4 0 4 0 4 0 Y B 6 4 10 410 0 Y C12 10 22 […]
Mathematics Chapter 7 Homework Problem 7-13 Project length = 17 weeks
Problem 7-13 A D G B C E H F Start End Activity Time EST EFT LST LFT Slack Critical? A 4 0 4 0 4 0 Y B 6 0 6 1 7 1 N Problem 7-13 C 3 […]
Mathematics Chapter 7 Homework Problem 7-12 Critical Path Bdeg Project Length Days
Problem 7-12 B C D E A F G Start Activity Time EST EFT LST LFT Slack Critical? A 2 0 2 13 15 13 N B 5 0 5 0 5 0 Y Problem 7-12 C 1 0 1 […]
Mathematics Chapter 7 Homework Latest Activity Start Times Are Determined Making
these estimates, the expected completion time and completion variance can be determined. CPM allows the use of crashing. This technique allows a manager to reduce the total project completion time by expending additional resources on activities within the network. CPM […]
Mathematics Chapter 7 Homework Critical Path Project Length Project Variance Project
Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Exp time Var Std dev C A 50.00 60.00 100.00 65.00 69.44 8.33 30.00 95.00 30.00 95.00 0.00 Y E B 25.00 30.00 35.00 30.00 2.78 1.67 90.00 […]
Mathematics Chapter 7 Homework Southwestern University Days From The Current
total cost of $15,000. To further crash the project to 240 days from the current 250 days, we crash activity D by 10 days at $1,900/day, for a total cost of $19,000. Hence, the total additional cost to crash the […]
Mathematics Chapter 7 Homework Shale Oil Company Optim Most likely Pessim
Activity Predecessors Optim time (a) Most likely time (m) Pessim time (b) Exp time Var Std dev EST EFT LST LFT Slack Critical? Critical path = 1 – 1.0 2.0 2.5 1.92 0.06 0.25 0.00 1.92 0.00 1.92 0.00 Y […]
Mathematics Chapter 7 Homework Shale Oil Would Have Determine The Costs
CHAPTER 7 PROJECT MANAGEMENT Internet Case Study: Shale Oil Company 1. The project network is shown below. See file Ch07 Internet Case Shale Oil.XLS. The expected shutdown time is 45.75 days. There are 9 activities on the critical path: 1, […]
Mathematics Chapter 7 Homework Bay Community Hospital Activity End Pred Critical
Activity Pred Time EST EFT LST LFT Slack Critical? D B 4.0 4.0 8.0 6.0 10.0 2.0 N F C, E 2.0 8.0 10.0 8.0 10.0 0.0 Y End D, F 0.0 10.0 10.0 10.0 10.0 0.0 Y Critical path […]
Mathematics Chapter 7 Homework If activity E on the critical path is reduced by one week using
However, $300 is saved by allowing activity A (not on any of the critical paths) to take 3 weeks, yielding a net cost increase of $1,050. weeks, with a critical path of E-F. See file Ch07 Internet Case Bay Community.XLS, […]
Mathematics Chapter 7 Homework Alpha Beta Gamma Record
Activity Pred Optim time (a) Most likely time (m) Pessim time (b) Exp time Var Std dev EST EFT LST LFT Slack Critical? Critical path = A – 1.00 2.00 3.00 2.00 0.11 0.33 0.00 2.00 0.00 2.00 0.00 Y […]
Mathematics Chapter 7 Homework This Yields Standard Normal Value 48 Implying
the same as before, but has an expected length of only 31.0 days with a variance of 0.6944. This yields a standard normal value of 4.8 implying that it is almost certain that the issues will be sent out on […]
Mathematics Chapter 7 Homework Case Haygood Brothers Immed Optim Most Likely
Activity Immed pred Optim time (a) Most likely time (m) Pessim time (b) Expected time Variance Standard deviation I E 5 7 9 7.00 0.44 0.67 21.00 28.00 21.00 28.00 0.00 Y J D, I 10 11 12 11.00 0.11 […]