Archives: Solution Manual
Mathematics Chapter 7 Homework Family Planning Research Center of Nigeria
Activity Pred Time EST EFT LST LFT Slack Critical? A—5 0 5 8 13 8 N B—7 0 7 12 19 12 N Case: Family Planning Research Center of Nigeria (a) C—5 0 5 0 5 0 Y D A […]
Mathematics Chapter 6 Homework Problem 6-43 Load (Hrs) 68.56 Max Load (Hrs) 68.56
1 2 3 4 5 6 LHS RHS 418.27 0.00 0.00 0.00 1.00 0.00 0.00 1.0 = 1.0 635.20 0.00 0.00 1.00 0.00 0.00 0.00 1.0 = 1.0 817.20 0.00 0.00 0.00 0.00 0.00 1.00 1.0 = 1.0 10 17.20 […]
Mathematics Chapter 6 Homework Problem 6-42 Demand for B A capacity
QAQBPAPB QAQBPAPBQA*PAQB*PB Variable terms 275.00 212.50 26.13 19.06 7184.38 4049.31 Objective coeff -18 -12 1 1 $3,733.68 Constraints: Demand for A 1 200 5500.00 =5500 Demand for B 1 225 4500.00 =4500 A capacity 1 275.00 <= 275 B capacity […]
Mathematics Chapter 6 Homework Problem 6-41 Total invest Min return Max Alpha
A B G A B G A2B2G2A*B A*G B*G Variable terms 0.21 0.33 0.46 0.04 0.11 0.22 0.07 0.10 0.15 Objective coeff 3.00 2.00 2.00 2.00 -1.10 -0.70 0.70 Constraints: Total invest 1 1 1 1.00 = 1.00 Min return […]
Mathematics Chapter 6 Homework Problem 6-40 Constraints: Testing hours
XJ6 XJ7 XJ8 Solution value 13.32 7.49 9.65 Problem 6-40 XJ6 XJ7 XJ8 XJ62XJ72XJ82 Variable terms 13.32 7.49 9.65 177.39 56.08 93.22 Objective coeff 4 5 6 -0.1 -0.2 -0.2 $101.05 Constraints: Testing hours 1 1.5 1.6 40.00 <= 40 […]
Mathematics Chapter 6 Homework Problem 6-39 Costs 180000 Fixed Costs
4-cyl 6-cyl 8-cyl X1X2X3 X1X2X3X33 Variable terms 0.00 38.46 0.00 0.00 Fixed Costs 1800.00 2400.00 1950.00 Objective coeff -50 -70 -65 $89,615.38 Constraints: Prodn hours 100 130 140 5000.00 <= 5000 LHS Sign RHS Problem 6-39 Solution value 0.00 38.46 […]
Mathematics Chapter 6 Homework Problem 6-38 Solution Value Variable Constraint 3
X1X2X3 X1X2X3X1X2X33 Variable terms 3.00 1.00 8.00 3.00 512.00 Objective coeff 2 1 -2 3 7 3,584.00 Constraints: Constraint 1 2 4 3 34.00 >= 34 Constraint 2 3 1 10.00 >= 10 Constraint 3 1 1 1 12.00 <= […]
Mathematics Chapter 6 Homework Problem 6-37 Solution Value Variable Terms Objective Constraint 1
X1X2X3 Solution value 2.80 4.92 3.37 X1X2X3X12X22X33 Variable terms 2.80 4.92 3.37 7.83 24.17 38.40 Objective coeff 10 15 25 186.07 Constraints: Problem 6-37 Constraint 1 1 1 1 11.09 <= 12 Constraint 2 1 1 32.00 <= 32 Constraint […]
Mathematics Chapter 6 Homework Problem 6-36 Define Variables Lbs Apples The Fruit Salad Banana avail Grape avail
A B G P S d1- d1+ d2- d2+ d3- d3+ Solution values 0.00 10.92 3.19 5.16 4.73 0.00 0.00 0.00 4.92 0.00 2.16 Objective coeff 1 0.00 Constraints: Problem 6-36 (Rank R1 Goals Only) Cost goal 1.49 0.49 1.69 […]
Mathematics Chapter 6 Homework Problem 6-35 over and underachievement of Goal 1
A B C D E F d1- d1+ d2- d2+ d3- d3+ d4- d4+ d5- d5+ d6- d6+ d7- d7+ Solution values 0.0 1650.0 600.0 0.0 4500.0 2250.0 0.0 0.0 416.5 0.0 0.0 0.0 0.0 1350.0 0.0 0.0 0.0 2250.0 […]
Mathematics Chapter 6 Homework Problem 6-34 Lhs Sign Rhs Problem 634 Rank Goals
BKT BB PG SF d1- d2- d2+ d3- d3+ d4- d4+ Solution values 4.00 5.00 0.00 6.00 0.00 0.00 0.00 0.00 0.00 0.00 4.00 Objective coeff 1 0.00 Constraints: Budget goal 300 250 75 175 1 3500.00 = 3500 Problem […]
Mathematics Chapter 6 Homework Problem 6-33 Shaft Required Housing Required 200000 260 05
CM CB SM SB HM HB d1- d1+ d2- d2+ d3- d3+ Constraints: Cost goal 2.60 3.12 1.80 2.16 1.40 1.68 1 -1 14000.00 = 14000 Fabrication goal 0.5 0.2 0.6 1 -1 3000.00 = 3000 Coils bought goal 1 […]
Mathematics Chapter 6 Homework Problem 6-32 Solution Value Obj Coefficient Constraints
Begin Mon Begin Tue Begin Wed Begin Thu Begin Fri Begin Sat Begin Sun d1- d1+ d2+ d3+ Constraints: Sunday goal 0 0 1 1 1 1 1 -1 15 =15 Monday need 1 0 0 1 1 1 1 […]
Mathematics Chapter 6 Homework Problem 6-31 Newspaper ads Exposure (million)
TV News d1–d1+d2–d2+d3–d3+d4–d4+ Solution value 16.00 20.00 – – – 6.00 – – 1.20 – Problem 6-31 (Rank R1 Goal Only) Obj coefficient 1 0.00 Constraints: Budget 10000 4000 1-1 240000.00 =240000 TV spots 1 1 -1 10.00 =10 Newspaper […]
Mathematics Chapter 6 Homework Problem 6-30 Three-drawer sales 2-draw 3-draw d1
2-draw 3-draw d1–d1+d2–d3–d4– Solution value 650.00 300.00 0.00 0.00 25.00 0.00 100.00 Obj Coefficient 1 1 0.00 Constraints: Problem 6-30 (Rank R1 Goals Only) Profit 12 14 1-1 12000.00 =12000 Production limit 1.5 2 1 1600.00 =1600 Two-drawer sales 1 […]
Mathematics Chapter 6 Homework Problem 6-29 Decision Variables Bk1 Book Published Bk2
#B1 #B2 #B3 #B4 #B5 B1Pub B2Pub B3Pub B4Pub B5Pub Solution values 0.0 8000.0 5000.0 0.0 7000.0 0.0 1.0 1.0 0.0 1.0 Revenue $40 $60 $52 $34 $45 Problem 6-29 Binary variables Regular variables BK1 = # of Book 1 […]
Mathematics Chapter 6 Homework Problem 6-28 Note The Capacity Lumber
ND NT NC D T C Solution values 625.0 0.0 0.0 1.0 0.0 0.0 Revenue $135 $110 $50 Problem 6-28 Regular variables Binary variables Decision variables: D = 1 if desks are made, = 0 if not T = 1 […]
Mathematics Chapter 6 Homework Problem 6-27b Selected Yes Objective Coeff Constraints
Assignment: Location A B C D E F G H Flow out Node Flow in Flow out Net flow Sign RHS 1 1 1 – 1 1 1 – – 5.0 1 5 -5 >= -8 B 1 1 = […]
Mathematics Chapter 6 Homework Problem 6-26 Decision Variables Units Shipped From Charlotte Region
C1 C2 C3 T1 T2 T3 M1 M2 M3 B1 B2 B3 C T M B Memp capacity 1 1 1 7000.0 <= 7250 7250 Buff capacity 1 1 1 0.0 <= 07500 Buffalo : Tulsa 1 0.0 <= 1 […]
Mathematics Chapter 6 Homework Problem 6-25 Decision Variables Units Shipped From Philadelphia The
PN PS PW TN TS TW CN CS CW DN DS DW P T C D Constraints: Capacity Phil capacity 1 1 1 250.0 <= 250 250 TB capacity 1 1 1 0.0 <= 0260 Chi capacity 1 1 1 […]
Mathematics Chapter 6 Homework Problem 6-24 Select Yes Objective Coeff Constraints
A B C D E F E requirements 1 1 1 2.0 >= 1 F requirements 1 1 1 1 1.0 >= 1 LHS Sign RHS Community Within 5 mts A A, B, D, E BA, B, C, F CB, […]
Mathematics Chapter 6 Homework Problem 6-23 Within 1400 Miles Phila served Seattle served
Problem 6-23 Atlanta Boston Chicago Dallas Denver LA Phila Seattle Selected? (1 = yes) 1 – – – – 1 – – LA served 1 1 1 1.0 >= 1 Phila served 1 1 1 1 1.0 >= 1 Seattle […]
Mathematics Chapter 6 Homework Problem 6-22 Selected Yes Npv 000 Constraints
Problem 6-22 P1 P2 P3 P4 P5 P6 Selected? (1 = yes) 0.0 0.0 0.0 1.0 1.0 1.0 NPV ($’000) $140 $260 $88 $124 $176 $192 $492.0 Constraints: Year 1 budget $80 $95 $58 $32 $115 $48 $195.0 <= $225 […]
Mathematics Chapter 6 Homework Problem 6-21 At least 2 ST At least 1 RHR
Problem 6-21 A B C D E F G H Selected? (1 = yes) – 1 1 1 – 1 – 1 Value 8 5 6 5 8 5 7 4 25.0 Constraints: Budget ($Million) $9 $4 $5 $5 $6 […]
Mathematics Chapter 6 Homework Problem 6-20 Selected Yes Value Constraints Capacity
Problem 6-20 A B C D E F G Selected? (1 = yes) 1.0 1.0 1.0 0.0 0.0 1.0 0.0 Value $1,800 $1,400 $1,100 $900 $1,600 $1,100 $1,200 $5,400.0 Constraints: Capacity 700 600 450 400 650 350 600 2,100.0 <= […]
Mathematics Chapter 6 Homework Problem 6-19 Selected Yes Return Constraints Available
Problem 6-19 A B C D E F G Selected? (1 = yes) – 1 1 1 1 1 1 Return $700 $1,000 $390 $500 $750 $640 $300 $3,580.0 Constraints: $ available ($’000) $10.0 $12.0 $3.5 $5.0 $8.5 $8.0 $4.0 […]
Mathematics Chapter 6 Homework Problem 6-18 Nebraska Southern Manuel Builders 10 10 00
Problem 6-18 Andover Hamilton Easy Nebraska Southern Manuel Builders Rest Invest? (1 = Yes) 1.0 0.0 0.0 1.0 1.0 0.0 1.0 1.0 Exp return ($’000) $35 $100 $30 $65 $45 $20 $90 $50 $285.0 Constraints: Cost ($’000) $400 $1,000 $350 […]
Mathematics Chapter 6 Homework Problem 6-17 Number Used Objective Coeff Constraints
$1 $0.25 $0.10 $0.05 $0.01 $1 available 1 5 <= 8 $0.25 available 1 2 <= 9 $0.10 available 1 0 <= 7 $0.05 available 1 1 <= 11 $0.01 available 1 2 <= 10 LHS Sign RHS Problem 6-17 […]
Mathematics Chapter 6 Homework Problem 6-16 Double 500 Min Single Min CCU
Problem 6-16 Single Double ICU CCU Constraints: Space (Sq. Ft.) 300 360 320 340 39960.0 <= 40000.0 Max Double 1 50.0 <= 50.0 Max ICU 1 20.0 <= 20.0 Max CCU 1 14.0 <= 20.0 Min Single 1 36.0 >= […]
Mathematics Chapter 6 Homework Problem 6-15 Part Mon Tue Wed Thu Fri Sat
Begin Mon Begin Tue Begin Wed Begin Thu Begin Fri Begin Sat Begin Sun Number scheduled 11.0 1.0 3.0 2.0 4.0 6.0 0.0 Objective coeff 1 1 1 1 1 1 1 27 Problem 6-15(a) Constraints: Monday need 1 1 […]
Mathematics Chapter 6 Homework Problem 6-14 Number Units Passengers Constraints Total
Problem 6-14 7A7s 7B7s 7C7s Number of units 9.0 8.0 0.0 Passengers 125000 95000 80000 1885000.0 Constraints: Total planes 1 1 1 17.0 =17.0 $ available (millions) $38 $27 $22 558.0 <= 700.0 $ maint (millions) $0.8 $0.6 $0.5 12.0 […]
Mathematics Chapter 6 Homework Problem 6-13 Constraints Labor Hours 11800 Lhs Sign Rhs
House Lawyer Doctor Problem 6-13 Number of units 8.0 10.0 Profit $90.00 $133 $250 $2,050.00 Constraints: Labor Hours 6 7 10 118.00 <= 120 Houses 1 8.00 >= 8 LHS Sign RHS
Mathematics Chapter 6 Homework The Purpose This Question Have The Student
6-2. The student should provide five realistic examples of IP. One good exercise would be to require students to find five articles and use those as examples. are integers. Mixed IP models are more common, as firms generally have only […]
Mathematics Chapter 6 Homework Schank Marketing Research Hardgraves
G to H G to N G to G G to C R to H R to N R to G R to C H to H H to N H to G H to C General 1 1 1 […]
Mathematics Chapter 6 Homework Oakton River Bridge Begin work on
Sun A Mon A Tue A Wed A Thu A Fri A Sat A Sun B Mon B Tue B Wed B Thu B Fri B Sat B Sun C Mon C Tue C Wed C Th u C Fri […]
Mathematics Chapter 6 Homework Bath & Beauty Children’s Chinese Electronics Game Hardware
Bath & Body Beauty Parlor Children’s Clothing Chinese Food Electronics Store Game Arcade Hardware Store Hobby Store Icecream Store Kitchen Store Lingerie Store Luggage Store Men’s Clothing Pizza Parlor Shoe Store Sports Bar Tex-Mex Food Toy Store Travel Agent Women’s […]
Mathematics Chapter 5 Homework Problem 5-41 Load (Hrs) 68.22 Max Load (Hrs) 68.22
1 2 3 4 5 6 LHS RHS 418.27 0.00 0.00 1.00 0.00 0.00 0.00 1.0 = 1.0 635.20 0.00 1.00 0.00 0.00 0.00 0.00 1.0 = 1.0 817.20 0.00 0.00 0.00 1.00 0.00 0.00 1.0 = 1.0 10 17.20 […]
Mathematics Chapter 5 Homework Problem 5-40 Minimal spanning Tree Model Optimal Solution
Minimal-spanning tree model Problem 5-40 2 5 6 3 8 7 9 1 6 3 4 7 4 8 3 5 6 3 9 8 8 10 9 2 4 6 4 6 An optimal solution to this problem is […]
Mathematics Chapter 5 Homework Problem 5-39 Minimum Distance 2100 Yards
Problem 5-39 Minimal-spanning tree model An optimal solution to this problem is shown by the bold arcs. Minimum distance = 21 (= 2,100 yards)
Mathematics Chapter 5 Homework Problem 5-38 Distances: From Node 1
Node 3 200 10 200 200 200 200 16 200 200 200 200 200 200 200 Node 4 200 200 200 200 200 200 200 200 200 200 200 200 200 200 Node 5 26 200 200 200 200 22 […]
Mathematics Chapter 5 Homework Problem 5-37 Flow out Shortest distance
Node 4 200 10 8200 12 200 12 200 200 200 200 200 200 200 Node 5 26 200 200 12 200 22 200 18 18 200 200 200 200 200 Node 6 19 200 200 200 22 200 200 […]
Mathematics Chapter 5 Homework Problem 5-36 Flows From Node Flow balance equations
Node 3 1 0 0 0 0 2 2 0 0 0 0 0 0 0 Node 4 3 0 0 0 0 0 0 1 0 0 0 0 0 0 Node 5 0 0 0 0 0 0 […]
Mathematics Chapter 5 Homework Problem 5-35 Flows From Node Flow in Flow out Net flow Sign RHS
Node 5 0 0 0 0 0 0 0 0 4 0 0 0 0 0 Node 6 0 0 2 0 0 0 2 0 0 3 0 0 6 0 Node 7 0 0 1 0 0 1 […]
Mathematics Chapter 5 Homework Problem 5-34 Node Flow balance equations Flow in Flow
Node 4 0 0 0 0 0 0 8 2 0 0 0 Node 5 4 0 0 0 0 0 0 14 0 0 0 Node 6 0 0 0 0 0 0 0 0 4 0 0 Node […]
Mathematics Chapter 5 Homework Problem 5-33 Flows From Node Flow balance equations Node 4
Flows: From Node 1 Node 2 Node 3 Node 4 Node 5 Node 6 Flow out Node Flow in Flow out Net flow Sign RHS Node 1 0.0 55.0 45.0 67.0 0.0 0.0 167.0 Node 1 167.0 167.0 0.0 = […]
Mathematics Chapter 5 Homework Problem 5-32 Total Length Only optimal solution to this problem is shown
Minimal-spanning tree model Only optimal solution to this problem is shown by the bold arcs. Total length = 177 units Problem 5-32
Mathematics Chapter 5 Homework Problem 5-31 Shortest distance To N-3
Flows: From N-1 N-2 N-3 N-4 N-5 N-6 N-7 N-8 N-9 N-10 N-11 N-12 N-13 Flow out Node Flow in Flow out Net flow Sign RHS Node 1 0.0 1.0 0.0 1.0 Node 1 0.0 1.0 -1.0 = -1.0 Node […]
Mathematics Chapter 5 Homework Problem 5-30 Flow in Flow out Net flow Sign RHS
Flows: From Node 1 Node 2 Node 3 Node 4 Node 5 Node 6 Node 7 Node 8 Flow out Node Flow in Flow out Net flow Sign RHS Node 1 0.0 2.0 2.0 1.0 0.0 0.0 0.0 0.0 5.0 […]
Mathematics Chapter 5 Homework Problem 5-29 Total Length 4500 Feet
Minimal-spanning tree model An optimal solution is shown by the bold arcs. Total length = 45 (= 4,500 feet). Problem 5-29
Mathematics Chapter 5 Homework Problem 5-28 Econ Flow Balance Equations Node Flow
Assignments: Professor Stat Mgmt Fin Econ Flow out Node Flow in Flow out Net flow Sign RHS Mgmt 1 1 = 1 Ratings: Finance 1 1 = 1 Professor Stat Mgmt Fin Econ Economics 1 1 = 1 Kelley 80 […]