CM CB SM SB HM HB d1- d1+ d2- d2+ d3- d3+
Constraints:
Cost goal 2.60 3.12 1.80 2.16 1.40 1.68 1 -1 14000.00 = 14000
Fabrication goal 0.5 0.2 0.6 1 -1 3000.00 = 3000
Coils bought goal 1 1 -1 200.00 = 200
Molding capacity 0.4 0.7 0.3 600.00 <= 3000
Inspection capacity 0.2 0.3 0.4 800.00 <= 1800
Coil required 1 1 2205.13 >= 2000
Shaft required 1 1 2000.00 >= 2000
Problem 6-33 (Rank R1 Goals Only)
CM CB SM SB HM HB d1- d1+ d2- d2+ d3- d3+
Solution values 2000.00 0.00 225.81 1774.19 3258.06 0.00 0.00 0.00 0.00 0.00 200.00 0.00
Objective coeff 1 0.00
Constraints:
Cost goal 2.60 3.12 1.80 2.16 1.40 1.68 1 -1 14000.00 = 14000
Fabrication goal 0.5 0.2 0.6 1 -1 3000.00 = 3000
Problem 6-33 (Rank R2 Goals Only)
Housing required 1 1 3258.06 >= 2000
CM CB SM SB HM HB d1- d1+ d2- d2+ d3- d3+
Solution values 1938.67 61.33 350.94 1649.06 3267.46 0.00 0.00 0.00 0.00 0.00 138.67 0.00
Objective coeff 1 138.67
Constraints:
Problem 6-33 (Rank R3 Goals Only)
Housing required 1 1 3267.46 >= 2000