978-0080966595 Chapter 1 Solution Manual Part 1

978-0080966595 Chapter 1 Solution Manual Part 1

Solutions to Towler & Sinnott Chemical Engineering Design 2nd edition Part I: Process Design Part II Plant Design Chapter 1: Introduction Chapter 13: Equipment design Chapter 2: Flowsheet development Chapter 14: Pressure vessel design Chapter 3: Utilities and energy recovery […]

14 Pages | August 7, 2020
978-0080966595 Chapter 1 Solution Manual Part 2

978-0080966595 Chapter 1 Solution Manual Part 2

Solution 3.7 See example 3.5 for hand calculations. I solved this using UniSim ExchangerNet R360 and got the following olution 3.8 answers: match stream 5 with stream 3 (as it could not reach the target temperature), so instead we need […]

14 Pages | August 7, 2020
978-0080966595 Chapter 1 Solution Manual Part 3

978-0080966595 Chapter 1 Solution Manual Part 3

Chapter 7 Solution 7.1 Cost can be estimated using historic data correlations given in Table 7.1. Solution 7.2 Aniline is not listed in Table 7.1, so use the step counting methods given in Section 7.4.2 Gas phase reaction but liquid […]

13 Pages | August 7, 2020
978-0080966595 Excel Part 1

978-0080966595 Excel Part 1

Q102 T1 128.7748 LHS 468378.5 RHS 468378.5 difference -0.0062 Energy cost 4.6 $/MMBtu Heater duty 850 kW Heater efficiency 0.8 Evaporator duty 1062.5 kW Op hrs/yr 8000 Annual fuel consumption 30600 GJ/y annual heat rate (BTU) 29004.7393 MMBtu/yr Annual cost […]

10 Pages | August 7, 2020
978-0080966595 Excel Part 2

978-0080966595 Excel Part 2

$ Main plant items 18000 Installation factor 4 ISBL installed cost 72000 OSBL costs 0 EPC costs 21600 Contingency 14400 Total capital cost 108000 Year Gross profit ($) Depreciation charge ($) Taxable income ($) Taxes paid ($) Cash Flow ($) […]

10 Pages | August 7, 2020