39-18) In Figure 39-32, what voltage operates the potential start relay coil?
39-19) In Figure 39-32, what is the purpose of the potential start relay?
39-20) List the heating operational sequence for the unit in Figure 39-24.
39-21) In Figure 39-23, what controls the fan operation in heating?
39-22) List the operational sequence for Figure 39-23.
With the system switch in the heat position, the heating thermostat
closes when the room temperature drops. This initiates a call for heat,
16), closing its contacts and energizing the igniter, line 1. The igniter is
energized for 60 seconds before the gas valve is energized. The gas valve
and 6. Starting of the indoor fan motor is delayed to allow the furnace
time to heat up.
39-23) List the operational sequence for the second stage of Figure 39-33. Just list what
happens when the W2 terminal is energized.
The second stage heating thermostat TSH2 closes to send 24 volts from R
to W2, energizing heat sequencer HS1, line 18. The HS1 coil is a small