1
2
3
4
14
15
16
26
27
28
29
30
A B C D E F G H I J
Queuing Model M/M/s (Exponential Service Times)
Probability (% of time) system is empty (P0)0.2000
6 0.0524 0.7903
7 0.0419 0.8322
8 0.0336 0.8658
9 0.0268 0.8926
10 0.0215 0.9141
Problem 9-20 1-Crew
40
41
42
43
44
55
56
57
58
59
70
71
72
73
20 0.0023 0.9908
Computations
n or s
(lam/mu)^n/n!
Cumsum(n-1)
term2 P0(s) Rho(s) Lq(s) L(s) Wq(s) W(S)
0 1
1 0.8 1 4 0.2 0.8 3.2 4 0.8 1
12 1.43E-10 2.2255409 1.53711E-10 0.4493 0.066667 4.93E-12 0.8 1.23E-12 0.2
13 8.83E-12 2.2255409 9.40747E-12 0.4493 0.061538 2.77E-13 0.8 6.93E-14 0.2
14 5.04E-13 2.2255409 5.35064E-13 0.4493 0.057143 1.46E-14 0.8 3.64E-15 0.2
15 2.69E-14 2.2255409 2.84219E-14 0.4493 0.053333 7.19E-16 0.8 1.8E-16 0.2
16 1.35E-15 2.2255409 1.41611E-15 0.4493 0.05 3.35E-17 0.8 8.37E-18 0.2
27 2.22E-31 2.2255409 2.28828E-31 0.4493 0.02963 3.14E-33 0.8 7.85E-34 0.2
28 6.34E-33 2.2255409 6.53082E-33 0.4493 0.028571 8.63E-35 0.8 2.16E-35 0.2
29 1.75E-34 2.2255409 1.79978E-34 0.4493 0.027586 2.29E-36 0.8 5.74E-37 0.2
30 4.67E-36 2.2255409 4.79488E-36 0.4493 0.026667 5.9E-38 0.8 1.48E-38 0.2
1
2
3
4
5
6
7
8
12
13
22
23
24
25
26
37
38
39
A B C D E F G H I J
Problem 9-20 2-Crews
40
51
52
53
54
55
66
67
68
69
70
A B C D E F G H I J
Number of crews L Truck cost/day Crew cost/day Total cost/day
1 4.0 trucks 4.0 x 8 hrs x $80 = $2,560 3 x $22 x 8 hrs = $528 $3,088
Problem 9-20 Costs