Assignments:
From Prep Assem Finish Pack Flow out Node Flow in Flow out Net flow Sign RHS
Tom 1.0 0.0 0.0 0.0 1.0 Tom 0 1 -1 =-1
Assem 1 0 1 = 1
Hours: Finish 1 0 1 = 1
From Prep Assem Finish Pack Pack 1 0 1 = 1
Tom 100 60 90 25
To
To
Case: Old Oregon Wood Store
Flow balance equations
Assignments:
From Prep Assem Finish Pack Flow out Node Flow in Flow out Net flow Sign RHS
Leon 0.0 0.0 1.0 0.0 1.0 Leon 0 1 -1 >= -1
Randy 0.0 0.0 0.0 1.0 1.0 Randy 0 1 -1 >= -1
Flow in 1.0 1.0 1.0 1.0 Prep 1 0 1 = 1
Assem 1 0 1 = 1
Hours: Finish 1 0 1 = 1
Total hours = 230
To
To
Flow balance equations
Assignments:
From Prep Assem Finish Pack Flow out Node Flow in Flow out Net flow Sign RHS
Tom 0.0 1.0 0.0 0.0 1.0 Tom 0 1 -1 >= -1
George 0.0 0.0 1.0 0.0 1.0 George 0 1 -1 >= -1
Cathy 1.0 0.0 0.0 0.0 1.0 Cathy 0 1 -1 >= -1
Randy 0.0 0.0 0.0 0.0 0.0 Randy 0 0 0 >= -1
Flow in 1.0 1.0 1.0 1.0 Prep 1 0 1 = 1
Assem 1 0 1 = 1
Hours: Finish 1 0 1 = 1
Total hours = 250
To
To
Flow balance equations
Case: Old Oregon Wood Store (Cathy is given preparation)
Assignments:
From Prep Assem Finish Pack Flow out Node Flow in Flow out Net flow Sign RHS
Leon 0.0 0.0 0.0 0.0 0.0 Leon 0 0 0 >= -1
Randy 0.0 0.0 0.0 1.0 1.0 Randy 0 1 -1 >= -1
Flow in 1.0 1.0 1.0 1.0 Prep 1 0 1 = 1
Assem 1 0 1 = 1
Hours: Finish 1 0 1 = 1
Total hours = 250
To
To
Flow balance equations
Case: Old Oregon Wood Store (Cathy is given finishing)