a BASIS $70,000.00 LOAN PRINC $14,000.00 BTCF -$18,000.00 TAX RATE 40.00% BASIS $110,000.00 LOAN PRINC $14,000.00 BTCF -$14,000.00 TAX RATE 40.00%
EST SALV $3,000.00 LOAN PERIOD 3 USE LIFE 16
MARRAT = 9.00% EST SALV $4,000.00 LOAN PERIOD 3 USE LIFE 16 MARRAT = 9.00%
RCVD SALV $3,000.00 LOAN INT 10.00% PERIODS 16 RCVD SALV $4,000.00 LOAN INT 10.00% PERIODS 16
MACRS(10) LOAN PLAN 2 MACRS(10) LOAN PLAN 2
EOY BTCF PPMT IPMT DWO TI T ATCF MACRS(10) EOY BTCF PPMT IPMT DWO TI T ATCF MACRS(10)
0 -$70,000.00 -$14,000.00 -$70,000.00 0 -$110,000.00 -$14,000.00 -$96,000.00
1 -$18,000.00 $4,666.67 $1,400.00 $7,000.00 -$25,000.00 -$10,000.00 -$8,000.00 10.00% 1 -$14,000.00 $4,666.67 $1,400.00 $11,000.00 -$26,400.00 -$10,560.00 -$9,506.67 10.00%
2 -$18,000.00 $4,666.67 $933.33 $12,600.00 -$30,600.00 -$12,240.00 -$5,760.00 18.00% 2 -$14,000.00 $4,666.67 $933.33 $19,800.00 -$34,733.33 -$13,893.33 -$5,706.67 18.00%
3 -$18,000.00 $4,666.67 $466.67 $10,080.00 -$28,080.00 -$11,232.00 -$6,768.00 14.40% 3 -$14,000.00 $4,666.67 $466.67 $15,840.00 -$30,306.67 -$12,122.67 -$7,010.67 14.40%
4 -$18,000.00 $8,064.00 -$26,064.00 -$10,425.60 -$7,574.40 11.52% 4 -$14,000.00 $12,672.00 -$26,672.00 -$10,668.80 -$3,331.20 11.52%
5 -$18,000.00 $6,454.00 -$24,454.00 -$9,781.60 -$8,218.40 9.22% 5 -$14,000.00 $10,142.00 -$24,142.00 -$9,656.80 -$4,343.20 9.22%
6 -$18,000.00 $5,159.00 -$23,159.00 -$9,263.60 -$8,736.40 7.37% 6 -$14,000.00 $8,107.00 -$22,107.00 -$8,842.80 -$5,157.20 7.37%
7 -$18,000.00 $4,585.00 -$22,585.00 -$9,034.00 -$8,966.00 6.55% 7 -$14,000.00 $7,205.00 -$21,205.00 -$8,482.00 -$5,518.00 6.55%
8 -$18,000.00 $4,585.00 -$22,585.00 -$9,034.00 -$8,966.00 6.55% 8 -$14,000.00 $7,205.00 -$21,205.00 -$8,482.00 -$5,518.00 6.55%
9 -$18,000.00 $4,592.00 -$22,592.00 -$9,036.80 -$8,963.20 6.56% 9 -$14,000.00 $7,216.00 -$21,216.00 -$8,486.40 -$5,513.60 6.56%
10 -$18,000.00 $4,585.00 -$22,585.00 -$9,034.00 -$8,966.00 6.55% 10 -$14,000.00 $7,205.00 -$21,205.00 -$8,482.00 -$5,518.00 6.55%
11 -$18,000.00 $2,296.00 -$20,296.00 -$8,118.40 -$9,881.60 3.28% 11 -$14,000.00 $3,608.00 -$17,608.00 -$7,043.20 -$6,956.80 3.28%
12 -$18,000.00 $0.00 -$18,000.00 -$7,200.00 -$10,800.00 12 -$14,000.00 $0.00 -$14,000.00 -$5,600.00 -$8,400.00
13 -$18,000.00 $0.00 -$18,000.00 -$7,200.00 -$10,800.00 13 -$14,000.00 $0.00 -$14,000.00 -$5,600.00 -$8,400.00
14 -$18,000.00 $0.00 -$18,000.00 -$7,200.00 -$10,800.00 14 -$14,000.00 $0.00 -$14,000.00 -$5,600.00 -$8,400.00
15 -$18,000.00 $0.00 -$18,000.00 -$7,200.00 -$10,800.00 15 -$14,000.00 $0.00 -$14,000.00 -$5,600.00 -$8,400.00
16 -$15,000.00 $0.00 -$15,000.00 -$6,000.00 -$9,000.00 16 -$10,000.00 $0.00 -$10,000.00 -$4,000.00 -$6,000.00
MARRAT = 9% SUM DEPR MARRAT = 9%
PWAT = -$140,304.52 $110,000.00 PWAT = -$148,606.88
FWAT = -$557,051.86 BOOK VALUE FW AT = -$590,014.76
AWAT = -$16,878.62 $0.00 AWAT = -$17,877.39
SELECT THE CONVEYOR COSTING $70,000.
BASIS $98,600.63 GOAL SEEK CHANGED CELL
$14,000.00 BTCF -$14,000.00
RCVD SALV $4,000.00 LOAN INT 10.00% PERIODS 16
EOY BTCF PPMT IPMT DWO TI T ATCF MACRS(10)
0 -$98,600.63 -$14,000.00 -$84,600.63
1 -$14,000.00 $4,666.67 $1,400.00 $9,860.06 -$25,260.06 -$10,104.03 -$9,962.64 10.00%
2 -$14,000.00 $4,666.67 $933.33 $17,748.11 -$32,681.45 -$13,072.58 -$6,527.42 18.00%
3 -$14,000.00 $4,666.67 $466.67 $14,198.49 -$28,665.16 -$11,466.06 -$7,667.27 14.40%
4 -$14,000.00 $11,358.79 -$25,358.79 -$10,143.52 -$3,856.48 11.52%
5 -$14,000.00 $9,090.98 -$23,090.98 -$9,236.39 -$4,763.61 9.22%
6 -$14,000.00 $7,266.87 -$21,266.87 -$8,506.75 -$5,493.25 7.37%
7 -$14,000.00 $6,458.34 -$20,458.34 -$8,183.34 -$5,816.66 6.55%
8 -$14,000.00 $6,458.34 -$20,458.34 -$8,183.34 -$5,816.66 6.55%
9 -$14,000.00 $6,468.20 -$20,468.20 -$8,187.28 -$5,812.72 6.56%
10 -$14,000.00 $6,458.34 -$20,458.34 -$8,183.34 -$5,816.66 6.55%
11 -$14,000.00 $3,234.10 -$17,234.10 -$6,893.64 -$7,106.36 3.28%
12 -$14,000.00 $0.00 -$14,000.00 -$5,600.00 -$8,400.00
13 -$14,000.00 $0.00 -$14,000.00 -$5,600.00 -$8,400.00
14 -$14,000.00 $0.00 -$14,000.00 -$5,600.00 -$8,400.00
15 -$14,000.00 $0.00 -$14,000.00 -$5,600.00 -$8,400.00
16 -$10,000.00 $0.00 -$10,000.00 -$4,000.00 -$6,000.00
THE COST OF THE SECOND CONVEYOR MUST BE $98,600.63 FOR THE TWO TO BE EQUIVALENT.
IN THIS PROBLEM, WE ARE SEEKING THE COST OF THE SECOND CONVEYOR THAT MAKES THE TWO ALTERNATIVES