Mini Case: 11 – 37
We generated these data with a spreadsheet model in the file Ch11 Mini Case.xlsx.
A. The sensitivity lines intersect at 0% change and the base-case NPV, $62,593. Since
all other variables are set at their base-case, or expected, values the zero change
situation is the base case and gives the base-case NPV, $62,593.
B. The plots for unit sales is steep and upward sloping, indicating that higher variable
values lead to higher NPVs. The salvage value line is also upward sloping, but only
slightly, indicating that the salvage value has a relatively small impact on NPV.
Conversely, the plot for cost per unit is downward sloping (and steeper than the line
for units sold), because a higher cost per unit leads to a lower NPV.
C. Steeper sensitivity lines indicate greater risk. Thus, in comparing two projects, the
one with the steeper sensitivity lines is considered to be the riskier project.