Civil Engineering Chapter 9 Homework Temporary Benchmark Was Established Using Permanent Object

subject Type Homework Help
subject Pages 1
subject Words 337
subject Authors David Sauter

Unlock document.

This document is partially blurred.
Unlock all pages and 1 million more documents.
Get Access
page-pf1
EXERCISE DESCRIPTION
To complete this exercise mark the proper amount of cut
or fill at each corner stake for the design shown in Lab
Manual Figure 9–3. This will require locating the corners
ADDITIONAL INSTRUCTIONAL TECHNIQUES
Repeating this exercise in combination with other proj-
ects in later sections will improve the effectiveness of
skills gained in this exercise.
EXERCISE SETUP
To perform the exercise the following will need to be
completed ahead of time or as part of a combined
exercise:
Perform math calculations for existing grades
and cut/fill. Existing grade numbers and cut/
fill calculations will vary based on the site
and benchmark used. Each site/benchmark
EVALUATION RECOMMENDATIONS
Evaluation of this exercise should include the following
criteria:
Student established correct points and/or shapes
with proper use of techniques.
Temporary benchmark was established using
a permanent object and in a location that was
visible from the site.
Dumpy and laser levels were set up in a location
that had visibility of the benchmark and entire
construction site.
Exercise 9
Grade Staking
3555X_01_ch01-40_p001-048.indd 13 14/06/10 7:48 PM

Trusted by Thousands of
Students

Here are what students say about us.

Copyright ©2022 All rights reserved. | CoursePaper is not sponsored or endorsed by any college or university.