C-17
C-18
Project 2
New 20,000 tonnes/y Allyl Chloride Plant – Unit 600
C-20
C-21
C-22
C-23
C-24
C-25
Project 3
Scale-Down of Phthalic Anhydride Production – Unit 700
24.13
22.2 24.13.
C-26
22.12
22.3.
Project 4
Design of a new 100,000 tonnes/y Phthalic Anhydride Plant
C-28
C-29
Project 5
Problems at the Cumene Production Facility – Unit 800
24.4.
24.4
Project 6
Design of a new 100,000 tonnes/y Cumene Plant
23.10,
2.
C-31