Accounting Chapter 27 Homework Withinbatch Wait Time Final Assembly Withinbatch Wait

subject Type Homework Help
subject Pages 2
subject Words 406
subject Authors Carl S. Warren, James M. Reeve, Jonathan Duchac

Unlock document.

This document is partially blurred.
Unlock all pages and 1 million more documents.
Get Access
An asterisk (*) will appear to the right of an incorrect entry. The essay answer will not be graded.
1.
Value-added time (minutes):
Assembly of PC board
Stereo assembly
Time to inspect one unit
Pack and label
Total
Non-value-added time (minutes):
Wait time:
Within-batch wait time - PC board assembly
Within-batch wait time - final assembly
Within-batch wait time - testing
Within batch wait time - shipping
Test setup
Total wait time
Move time:
Move from PC board assembly to final assembly
Move from final assembly to testing
Total move time
Total non-value-added time
Total lead time (minutes)
Value-Added Time / Total Time = Value-Added Ratio
2.
[Key essay answer here]
[Key code here]
Answers are entered in the cells with gray backgrounds.
Score:
Key Code:
Instructions
Cells with non-gray backgrounds are protected and cannot be edited.
0%
Problem 27(12)-2A
Name:
Section:
page-pf2
An asterisk (*) will appear to the right of an incorrect entry. The essay answer will not be graded.
1.
Value-added time (minutes):
Assembly of PC board 5
Cells with non-gray backgrounds are protected and cannot be edited.
Score:
Instructions
Answers are entered in the cells with gray backgrounds.
Problem 27(12)-2A
Name:
Solution
Section:

Trusted by Thousands of
Students

Here are what students say about us.

Copyright ©2022 All rights reserved. | CoursePaper is not sponsored or endorsed by any college or university.