Accounting Chapter 26 Homework Loudspeakers Subassembly Department Final Assembly Department Total

subject Type Homework Help
subject Pages 2
subject Words 478
subject Authors Carl S. Warren, James M. Reeve, Jonathan Duchac

Unlock document.

This document is partially blurred.
Unlock all pages and 1 million more documents.
Get Access
An asterisk (*) will appear to the right of an incorrect entry. The essay answer will not be graded.
1.
Production department rates:
Subassembly Final Assembly
Department Department
Factory overhead
Direct labor hours
Production department rate
/dlh /dlh
2.
Direct Labor Production Factory
Hours
Department Rate
= Overhead
Receivers:
Subassembly Department /dlh =
Final Assembly Department /dlh =
Total factory overhead
Number of units
Factory overhead per unit
Loudspeakers:
Subassembly Department /dlh =
Final Assembly Department /dlh =
Total factory overhead
Number of units
Factory overhead per unit
3.
Activity-based rates:
Factory overhead
Activity base setups insp. dlh dlh
Activity rate /setup /insp. /dlh /dlh
4.
Activity Usage Activity Rate =Activity Cost Activity Usage Activity Rate =Activity Cost
Setup setups /setup =
setups
/setup =
Quality Control insp. /insp. = insp. /insp. =
Subassembly Department dlh /dlh = dlh /dlh =
Final Assembly Department dlh /dlh = dlh /dlh =
Total
Number of units
Activity cost per unit
5.
Receivers
Loudspeakers
Activity
[Key essay answer here]
Final Assembly
Control
Department
Department
Quality
Problem 26(11)-3B
Name:
Section:
Answers are entered in the cells with gray backgrounds.
Score:
Key Code:
Instructions
Cells with non-gray backgrounds are protected and cannot be edited.
Subassembly
0%
[Key code here]
page-pf2
An asterisk (*) will appear to the right of an incorrect entry. The essay answer will not be graded.
1.
Production department rates:
Subassembly Final Assembly
Department Department
Factory overhead $420,000 $294,000
2.
Direct Labor Production Factory
Hours
Department Rate
= Overhead
Receivers:
Subassembly Department 875 $300 /dlh = 262,500$
3.
Activity-based rates:
Factory overhead $138,600 $261,800 $198,800 $114,800
Subassembly
Final Assembly
Setup
Control
Department
Department
Problem 26(11)-3B
Name:
Solution
Section:
Quality
Cells with non-gray backgrounds are protected and cannot be edited.
Score:
Instructions
Answers are entered in the cells with gray backgrounds.
ON

Trusted by Thousands of
Students

Here are what students say about us.

Copyright ©2022 All rights reserved. | CoursePaper is not sponsored or endorsed by any college or university.