An asterisk (*) will appear to the right of an incorrect entry. The essay answer will not be graded.
1. and 2.
Customer Date
Address Date Wanted
Date Completed
Item Job No.
Amount Amount Amount
meters at hours at
Total
Amount Amount Amount
400 meters hours
at at
403 meters hours
at at
Comments:
Direct materials
Direct labor
Total
Total
Total
Direct Materials
ACTUAL
Direct Labor
H9
[Key essay answer here]
Description
Time
Ticket No.
Description
Item
H12
Factory overhead
Summary
Total
Total
Direct materials
Direct labor
Factory overhead
Purchase, NY
Reupholster sofa and loveseat
March 1, 2014
Direct Materials
ESTIMATE
Direct Labor
Summary
Steve Scully
160 Soda Alley
[Key code here]
Answers are entered in the cells with gray backgrounds.
Cells with non-gray backgrounds are protected and cannot be edited.
JOB ORDER COST SHEET
January 21, 2014
March 3, 2014
Score:
Key Code:
Instructions
Problem 19-3B
Name:
Section:
0%
An asterisk (*) will appear to the right of an incorrect entry. The essay answer will not be graded.
1. and 2.
Customer Date
Address Date Wanted
Date Completed
Item Job No.
Amount Amount Amount
22 meters at $20 440.00 14 hours at $25 350.00 440.00
January 21, 2014
March 3, 2014
March 1, 2014
Cells with non-gray backgrounds are protected and cannot be edited.
ESTIMATE
Direct Labor
Summary
Direct Materials
Direct materials
Problem 19-3B
Name:
Solution
Section:
Steve Scully
160 Soda Alley
Purchase, NY
Reupholster sofa and loveseat
Instructions
Answers are entered in the cells with gray backgrounds.
JOB ORDER COST SHEET
ON
Score:
Direct labor
Factory overhead
Summary
Direct Materials
Direct Labor
Factory overhead