An asterisk (*) will appear to the right of an incorrect entry.
a.
Budgeted
Activity Activity Cost =
Casting mh /mh
Assembly dlh /dlh
b.
Activity Activity Activity Activity
Activity
Activity Base Usage Rate =Cost Activity Base Usage Rate =Cost
Casting mh mh
Assembly dlh dlh
Inspecting insp. insp.
Setup setups setups
Materials handling loads loads
Total activity cost
Number of units
Activity cost per unit
Entry Lighting Fixtures
Dining Room Lighting Fixtures
[Key code here]
Answers are entered in the cells with gray backgrounds.
Cells with non-gray backgrounds are protected and cannot be edited.
Total Activity Base
Activity Rate
Score:
Key Code:
Instructions
Name:
Section:
0%
An asterisk (*) will appear to the right of an incorrect entry.
a.
Budgeted
Activity Activity Cost =
Casting 570,000$ 19,000 mh $30 /mh
Materials handling 23,750 950 loads $25 /load
b.
Activity Activity Activity Activity
Activity Activity Base Usage Rate =Cost Activity Base Usage Rate =Cost
Casting 6,000 mh $30 180,000$ 13,000 mh $30 390,000$
Entry Lighting Fixtures
Dining Room Lighting Fixtures
Name:
Solution
Section:
Total Activity Base
Activity Rate
ON
Cells with non-gray backgrounds are protected and cannot be edited.
Score:
Instructions
Answers are entered in the cells with gray backgrounds.