An asterisk (*) will appear to the right of an incorrect entry.
1. 2.
Debit Credit
a.
Bal. Bal.
b.
3. Schedule of unfinished jobs:
Direct Direct Factory
c. Materials Labor Overhead Total
No. 204
No. 206
d. Balance of Work in
Process, January 30
e.
4. Schedule of completed jobs:
f.
Direct Direct Factory
Materials Labor Overhead Total
Computation of cost of jobs finished: Finished Goods,
Direct Factory
Job Materials Direct Labor Overhead Total
No. 201
No. 202
No. 203
No. 205
Total
g.
Computation of cost of jobs sold:
Job Total
No. 201
No. 202
No. 203
Total
Job
January 30 (Job 205)
Work in Process
Finished Goods
Description
Job
Problem 17(2)-2A
Name:
Section:
Score:
Key Code:
Instructions
Cells with non-gray backgrounds are protected and cannot be edited.
JOURNAL
[Key code here]
Answers are entered in the cells with gray backgrounds.
An asterisk (*) will appear to the right of an incorrect entry.
1. 2.
Debit Credit (b) 66,380 (f) 46,640 (f) 46,640 (g) 29,960
(e) 17,280
ON
Score:
Work in Process
Finished Goods
Description
Problem 17(2)-2A
Name:
Solution
Section:
Cells with non-gray backgrounds are protected and cannot be edited.
JOURNAL
Instructions
Answers are entered in the cells with gray backgrounds.