This document is partially blurred.
Unlock all pages and 1 million more documents.
Get Access
An asterisk (*) will appear to the right of an incorrect entry. The essay answer will not be graded.
1. and 2.
Customer Date
Address Date Wanted
Date Completed
Item Job No.
Amount Amount Amount
meters at hours at
Total
Amount Amount Amount
400 meters hours
at at
403 meters hours
at at
Comments:
Score:
Key Code:
Instructions
Problem 17(2)-3B
Name:
Section:
0%
Steve Scully
160 Soda Alley
[Key code here]
Answers are entered in the cells with gray backgrounds.
Cells with non-gray backgrounds are protected and cannot be edited.
JOB ORDER COST SHEET
January 21, 2014
March 3, 2014
Purchase, NY
Reupholster sofa and loveseat
March 1, 2014
Direct Materials
ESTIMATE
Direct Labor
Summary
Direct materials
Direct labor
Factory overhead
Summary
Total
Total
Direct Materials
ACTUAL
Direct Labor
[Key essay answer here]
Mat. Req. No.
Description
Time
Ticket No.
Description
Item
H12
Factory overhead
H9
Direct materials
Direct labor
Total
Total
Total
An asterisk (*) will appear to the right of an incorrect entry. The essay answer will not be graded.
1. and 2.
Customer Date
Address Date Wanted
Date Completed
Item Job No.
Amount Amount Amount
22 meters at $20 440.00 14 hours at $25 350.00 440.00
ON
Score:
Problem 17-3B
Name:
Solution
Section:
Instructions
Answers are entered in the cells with gray backgrounds.
JOB ORDER COST SHEET
Cells with non-gray backgrounds are protected and cannot be edited.
ESTIMATE
Direct Labor
Summary
Direct Materials
Direct materials
Steve Scully
160 Soda Alley
Purchase, NY
Reupholster sofa and loveseat
January 21, 2014
March 3, 2014
March 1, 2014
Trusted by Thousands of
Students
Here are what students say about us.
Resources
Company
Copyright ©2022 All rights reserved. | CoursePaper is not sponsored or endorsed by any college or university.