An asterisk (*) will appear to the right of an incorrect entry.
1. 2.
Debit Credit
a.
Bal. Bal.
b.
3. Schedule of unfinished jobs:
d. Balance of Work in
Job
Process, March 31
e.
4. Schedule of completed jobs:
f.
Direct Direct Factory
Materials Labor Overhead Total
Computation of cost of jobs finished: Finished Goods,
Direct Factory
Job Materials Direct Labor Overhead Total
No. 301
No. 302
No. 303
No. 305
Total
g.
Computation of cost of jobs sold:
Job Total
Work in Process
Finished Goods
Description
Job
March 31 (Job 305)
Problem 16(2)-2A
Name:
Section:
Score:
Key Code:
Instructions
Cells with non-gray backgrounds are protected and cannot be edited.
JOURNAL
[Key code here]
Answers are entered in the cells with gray backgrounds.
An asterisk (*) will appear to the right of an incorrect entry.
1. 2.
Debit Credit (b) 41,595 (f) 38,755 (f) 38,755 (g) 26,200
(e) 9,000
a. 45,000
45,000 Bal. 11,840 Bal. 12,555
Job
Accum. Depr. – Machinery and Equipment
Materials Labor Overhead Total
Computation of cost of jobs finished: Finished Goods,
Direct Factory 4,230$ 6,225$ 2,100$ 12,555$
Job Materials Direct Labor Overhead Total
No. 301 1,850$ 2,500$ 900$ 5,250$
Job
March 31 (Job 305)
Work in Process
Finished Goods
Description
Materials
Problem 16(2)-2A
Name:
Solution
Section:
ON
Cells with non-gray backgrounds are protected and cannot be edited.
Score:
Instructions
Answers are entered in the cells with gray backgrounds.
JOURNAL
Accounts Payable