Unlock access to all the studying documents.
View Full Document
An asterisk (*) will appear to the right of an incorrect entry.
a.
Bal. Bal.
Direct Direct Factory
c. Materials Labor Overhead Total
No. 104
No. 106
d. Balance of Work in
e.
4. Schedule of completed jobs:
f.
Direct Direct Factory
Materials Labor Overhead Total
Computation of cost of jobs finished: Finished Goods,
Direct Factory
Job Materials Direct Labor Overhead Total
No. 101
No. 102
No. 103
No. 105
Total
g.
Computation of cost of jobs sold:
Cells with non-gray backgrounds are protected and cannot be edited.
Answers are entered in the cells with gray backgrounds.
An asterisk (*) will appear to the right of an incorrect entry.
Debit Credit (b) 262,490 (f) 175,090 (f) 175,090 (g) 142,610
a. 147,000
147,000 Bal. 127,880 Bal. 32,480
Job
Accum. Depr. – Machinery and Equipment
Materials Labor Overhead Total
Computation of finished jobs finished: Finished Goods,
Direct Factory 13,440$ 14,000$ 5,040$ 32,480$
Job Materials Direct Labor Overhead Total
Cells with non-gray backgrounds are protected and cannot be edited.
Answers are entered in the cells with gray backgrounds.