Select the appropriate title of each cost from the dropdown list in the shaded cells in column C, and enter
the appropriate amounts in the shaded cells in columns E and G.
January February
Prevention costs:
Quality planning 2,000$ 2,000$
New product review 500 500
Appraisal costs:
Materials inspection 2,500$ 2,500$
Product acceptance 13,000 15,000
Field inspection 12,000 14,000
Total appraisal 27,500$ 31,500$
Internal failure costs:
Scrap 10,000$ 12,000$
Retesting 6,000 7,200
External failure costs:
Warranty 15,000$ 18,000$
Allowances 7,500 9,000
Actual Costs Bud. Costs Variance
Prevention costs:
Quality planning 2,500$ 2,000$ 500$ U
New product review 700 500 200 U
Appraisal costs:
Materials inspection 2,500$ 2,500$ –$
Product acceptance 14,000 14,300 300 F
Field inspection 14,000 13,200 800 U
Total appraisal 30,500$ 30,000$ 500$ U
Internal failure costs:
Scrap 12,500$ 11,000$ 1,500$ U
Retesting 7,000 6,600 400 U
External failure costs:
Warranty 17,500$ 16,500$ 1,000$ U
Allowances 8,500 8,250 250 U