Chapter 9
Project Documentation
Review Questions:
1. Which member of the construction team is responsible for physically mobilizing onto
the job site?
2. Which member of the construction team is responsible for mobilizing the paper flow?
3. The file code system on a job site should be similar to what other code systems?
4. Where should the project files be located?
5. How long are files kept in storage?
6. What is a journal or daily report?
7. List at least five important types of information that is recorded on a daily job diary.
8. Who should originate a diary?
9. List three miss-uses of a diary.
10. List three different types of logs
page-pf2
30
11. Why would it be important for a document control log to be up to date?
12. How would it be possible for different members of the team to be working from different
revisions of construction drawings?
13. How are as-built drawings created?
14. List three types of record drawings.
1. On NanoEngineering Building, what is the date of and the revision number for Drawing
A2.03-2 that the drywall subcontractor should use as a reference in its daily diary when
framing the first floor elevator lobby?
8/21/15, Revision one