234 CHAPTER 14 MA T E R I A L REQ U I R E M E N T S PL A N N I N G ( M RP) AND E RP
CHAPTER 14 M A T ER I A L RE Q U I R E M EN T S PL A N N I N G (M RP) AND E RP 235
Scheduled receipt
On hand
Net requirement
3,750
Scheduled receipt
On hand
Net requirement
900
Planned order receipt
900
Planned order release
900
Level: 2
Parent: electrical unit
Quantity: 1X
Item: switch
Lead Time: 1 week
Lot Size: 12
Week No.
1
2
3
4
5
6
7
8
9
10
11
12
Gross requirement
900
Scheduled receipt
Item: knob
Lead Time: 1 week
Lot Size: 25
Week No.
1
2
3
4
5
6
7
8
9
10
11
12
Gross requirement
900
Scheduled receipt
200
On hand
200
200
200
14.14# (a)
2
D
1
3
E
1
1
F
1
2
G
1
2
H
1
Note: With low-level coding, C would be a Level 3 code.
236 CHAPTER 14 MA T E R I A L REQ U I R E M E N T S PL A N N I N G ( M RP) AND E RP
(b)
CHAPTER 14 M A T ER I A L RE Q U I R E M EN T S PL A N N I N G (M RP) AND E RP 237
Scheduled receipt
Lot
Projected on hand
Net requirement
0
Planned receipt
0
Scheduled receipt
Lot
Projected on hand
4
4
1
Net requirement
Planned receipt
14.15# (a)
(b)
Lot
1
0
—
—
0
A
Gross requirement
10
Scheduled receipt
Lot
Projected on hand
0
0
0
0
10
Net requirement
10
Planned receipt
Scheduled receipt
Lot
Projected on hand
2
2
0
Net requirement
Planned receipt
Planned release
Ten units are required for production and 10 each of B and F for field service repair:
238 CHAPTER 14 MA T E R I A L REQ U I R E M E N T S PL A N N I N G ( M RP) AND E RP
Note: M (in items B and F) means a repair or maintenance item.
CHAPTER 14 M A T ER I A L RE Q U I R E M EN T S PL A N N I N G (M RP) AND E RP 239
14.16 (a) Only Item G has changed because it has no subassem-
blies or components.
On hand 30
30
Net
60
P.O. receipt
60
P.O. release
60
Gross requirement
180
40
◼ Ask the supplier of G to expedite production or
P.O. receipt
160
40
P.O. release
160
40
Gross requirement
On hand 20
Net
P.O. receipt
P.O. release
6
Required Date
A
Order Release
Required Date
D
Order Release
Required Date
F
Order Release
3
7
Gross requirement
Net
P.O. receipt
(b)
240 CHAPTER 14 MA T E R I A L REQ U I R E M E N T S PL A N N I N G (M RP) AND E RP
Net requirement
8
Planned order receipt
8
Planned order release
Level: 1
Parent: A
Quantity: 3
Item: D
Lead Time: 1 week
Lot Size: L4L
Week No.
1
2
3
4
5
6
7
8
9
10
Gross requirement
24
Scheduled receipt
On hand
0
0
0
0
0
Net requirement
16
Planned order receipt
16
Planned order release
16
14.20* (a)
A
1
2
3
4
5
6
7
Gross requirement
30
14.20* (c)
P.O. receipt
P.O. release
30
B
1
2
3
4
5
6
7
Gross requirement
90
On hand 30
30
242 CHAPTER 14 MA T E R I A L REQ U I R E M E N T S PL A N N I N G (M RP) AND E RP
Net req.
4
7
10
5
Ord rec.
4
7
10
5
Net req.
2
10
5
Ord rec.
2
10
5
Beg inv
40
10
10
0
0
0
0
0
0
0
0
End inv
10
10
0
0
0
0
0
0
0
0
0
Ord rcpt
30
30
70
20
10
80
50
Lot size = EOQ
Setup cost = $150
Lead time = 1 week
1
3
4
6
8
10
11
12
Gross requirement
40
30
70
10
50
Scheduled receipt
On hand (beginning)
40
10
10
27
27
54
21
21
45
45
On hand (end of period)
10
27
27
54
41
21
11
45
52
Net requirements
30
3
16
5
57
57
57
57
Planned order release
57
57
57
57
14.22 Lot-for-lot ordering policy:
where D = period demand, S = setup or order cost, H = holding cost.
Reorder point:
330
Reorder point Demand during lead time units week 1 week
12
= =