CHAPTER 9 STORMWATER CONTROL
Review Question Page References
(1) 255 (5) 261 (9) 264 (13) 268
(2) 255 (6) 262
(17) 277
(10) 267 (14) 269
(3) 258 (7) 263
(18) http://h2osparc.wq.ncsu.edu/
(11) 267 (15) 275
(4) 261 (8) 264 (12) 267 (16) 275
descprob/urbstorm.html#intro
(19) www.envirosources.com
Solutions to Practice Problems
1. Q = C x i x A = 0.6 x 2 in./hr x 15 ac = 18 cfs (Equation 9-1)
6. i = 5.8 in/hr (Figure 3.5)
9. Overland flow time = 8 min (Figure 9.3)
22