E.reliable supply schedules
13) The MRP input listing the assemblies, subassemblies, parts, and raw materials
needed to produce one unit of finished product is the:
A.master production schedule.
B.bill of materials.
C.inventory records.
D.assembly time chart.
E.net requirements chart.
14) The operations manager for a local bus company wants to decide whether he should
purchase a small, medium, or large new bus for his company. He estimates that the
annual profits (in $000) will vary depending upon whether passenger demand is low,
medium, or high, as follows:
If he uses the maximin criterion, which size bus will he decide to purchase?
A.small
B.medium
C.large
D.either small or medium
E.either medium or large
15) A production line is to be designed for a job with three tasks. The task times are .3
minutes, 1.4 minutes, and .7 minutes. The minimum cycle time in minutes is:
A..3
B..7
C.1.4
D.2.4
E..8