In a CPM analysis, if you subtract the late finish from the early finish, the result is the
activity’s slack time.
A restriction in using linear regression is that it assumes that past data and future
projections fall on or near a straight line.
Subcontractor networks are not very important in Japanese manufacturing.
Assembly lines are a special case of product layout.
Under the STR/OP sequencing priority rule, orders with the jobs with the longest
STR/OP are run first.