You have just used the capability index (Cpk) formulas to compute the two values “min
[1, 1].” Which of the following is the proper interpretation of these numbers?
A. The TRUE capability index value is exactly 1
B. The mean of the production process has shifted to the left of the design limits
C. The mean of the production process has shifted to the right of the design limits
D. The mean has not shifted at all
E. None of the above
Answer:
When developing an operations and supply chain strategy, which of the following is an
important product-specific criterion to consider?
A. Technical liaison
B. Learning curve
C. Competitor’s product performance
D. Production lot-size
E. Total quality management