13) Many activities have slack time; if we add these slack times together, this represents
the potential improvement in early completion for the project.
14) The earliest finish time for an activity is equal to the latest finish time minus the
activity time.
15) Ergonomics is an important part of job design to consider when we automate the
system.
16) An electronics firm produces two models of pocket calculators: the A-100 (A),
which is an inexpensive four-function calculator, and the B-200 (B), which also features
square root and percent functions. Each model uses one (the same) circuit board, of
which there are only 2,500 available for this week’s production. Also, the company has
allocated a maximum of 800 hours of assembly time this week for producing these
calculators, of which the A-100 requires 15 minutes (.25 hours) each, and the B-200
requires 30 minutes (.5 hours) each to produce. The firm forecasts that it could sell a
maximum of 4,000 A-100s this week and a maximum of 1,000 B-200s. Profits for the
A-100 are $1.00 each, and profits for the B-200 are $4.00 each. Which of the following
is not a feasible production/sales combination?
A.0 A and 0 B
B.0 A and 1,000 B
C.1,800 A and 700 B
D.2,500 A and 0 B
E.100 A and 1,600 B