Suppose that the introduction of a preventive maintenance program is deemed cost
effective. Which of the following is most likely true if the cost to actually perform
preventive maintenance is very expensive?
A) high standard deviation in MTBF
B) low standard deviation in MTBF
C) low Cost to Repair
D) repairs carry little non-monetary consequences
E) the system never fails
Which of the following is a key issue coupled between ethics and outsourcing?
A) moving pollution from one country to another
B) ignoring religious customs and holidays
C) low wages that are the result of labor abuse
D) short-term arrangements instead of long-term deals
E) All of the above are key tenets of ethics in outsourcing
An activity on a PERT network has these time estimates: optimistic = 2, most likely =
3, and pessimistic = 8. Its expected time and variance (if it is a critical activity) are
A) 3.67; 1