Unlock access to all the studying documents.
View Full Document
Module 00106–15 Exam Introduction to Basic Rigging
Trainee Name:
Social Security Number: Date:
MULTIPLE CHOICE. Choose the one alternative that best completes the statement or answers the question.
The maximum load weight that a sling is designed to carry is the _____.
Most alloy steel chain slings can be used in temperatures up to _____.
When a tattle–tail has been pulled into the jacket of a synthetic sling, the sling most likely has been _____.
If a wire rope sling appears to be damaged, the decision to keep it in service must be made by a _____.
Because of the need for increased toughness, shackles for most overhead lifting are made from _____.
Which style of hook is designed to be used on alloy steel chain slings?
To lift heavy loads, all chain hoists use a(n) _____.
A type of hand–operated winching device that should never be used for vertical overhead lifting is a _____.
Two choker hitches are recommended when lifting a load longer than _____.
If an emergency occurs during a rigging operation, who is allowed to give the emergency stop hand signal?
Only another crane operator in the vicinity.
Only a designated signal person.
Only a qualified rigger who has completed signal training.
Anyone on the ground who is in site of the crane operator.
Answer Key
Testname: M06_00106–15