MSE 722 Test

subject Type Homework Help
subject Pages 6
subject Words 525
subject Authors F. Robert Jacobs, Richard Chase

Unlock document.

This document is partially blurred.
Unlock all pages and 1 million more documents.
Get Access
page-pf1
Industrial robots are programmable, multifunctional machines that may be equipped
with an end effector.
Answer:
Sunk costs are expenses or investments that continue to exist and do not change
regardless of the decision.
Answer:
Job design is defined as the function of specifying the work activities of an individual
or group in an organizational setting.
Answer:
The master production schedule is a crucial input into the aggregate operations plan.
page-pf2
Answer:
Marketing is responsible for both the 'service promise" and "fulfillment of service
promise" elements of Services.
Answer:
A disadvantage of a matrix project organizational structure is that a project manager is
held responsible for successful completion of the project.
Answer:
The term "conformance quality" refers to the relative level of performance of a product
as compared to competing products. For instance, certain luxury sedans are said to be of
"higher quality" than some low-priced sub-compact automobiles.
Answer:
page-pf3
A "process" is any part of an organization that takes inputs and transforms them into
outputs that, hopefully, are of greater value to the organization than the original inputs.
Answer:
Run time is calculated by multiplying the number of units in a batch by the set-up time.
Answer:
Lean production is a management philosophy and a pull system throughout the plant.
Answer:
In general, investments should not be made unless the return in funds is less than the
marginal cost of the investment capital.
page-pf4
Answer:
According to the theory of constraints, Throughput is the rate at which money is
generated by the system through sales.
Answer:
When recovering from a defective service encounter, poor treatment from a server calls
for an apology.
Answer:
Cycle counting is a physical inventory-taking technique in which inventory is counted
on a frequent basis rather than once or twice a year.
Answer:
page-pf5
The idea of supply-chain management is to apply a total system approach to managing
the entire flow of information, materials and services from raw-materials suppliers
through factories and warehouses to the end customer.
Answer:
The "theme" of MRP is getting the right materials to the right place before they are
needed.
Answer:
Lean production replaced JIT in the 1990s because JIT did not address the problem of
reducing waste.
Answer:
Specialized design firms tend to have highly developed processes that support the needs
of particular industries.
page-pf6
Answer:
Just-in-time manufacturing (JIT) is applicable only for small-scale manufacturing
operations and can be used to eliminate production defects.
Answer:

Trusted by Thousands of
Students

Here are what students say about us.

Copyright ©2022 All rights reserved. | CoursePaper is not sponsored or endorsed by any college or university.