MSE 537 Midterm 1

subject Type Homework Help
subject Pages 9
subject Words 1575
subject Authors Barry Render, Jay Heizer

Unlock document.

This document is partially blurred.
Unlock all pages and 1 million more documents.
Get Access
page-pf1
Constraints are needed to solve linear programming problems by hand, but not by
computer.
One guideline for a retail layout is to locate high-draw items around the periphery of the
store.
If a manager conducting a time study needed an accuracy of ± 0.1 minutes, rather than
± 0.2 minutes, the adequate sample size would have to be twice as large.
The level scheduling strategy allows lower inventories than the pure chase strategy.
page-pf2
The stepping-stone method frequently achieves an optimal solution as soon as it
calculates an initial feasible solution.
Product-oriented layouts tend to have high levels of work-in-process inventories.
Failures are tolerable as long as their results are not catastrophic.
In a decision tree, a square symbol represents a state of nature node.
page-pf3
A cause-and-effect diagram helps identify the source of a problem.
Outsourcing
A) transfers traditional internal activities to outside vendors
B) utilizes the efficiency which comes with specialization
C) lets the outsourcing firm focus on its key success factors
D) None of the above are true of outsourcing.
E) All of the above are true of outsourcing.
What information is contained in the roof of the House of Quality?
A) what the customer wants
B) what we can do
C) competitive assessment
D) how well what we do meets the customer€s wants
E) relationship between the things we can do
page-pf4
Yamaha manufactures which set of products with complementary demands to address
seasonal fluctuations?
A) golf clubs and skis
B) swimming suits and winter jackets
C) jet skis and snowmobiles
D) pianos and guitars
E) ice skates and water skis
One fundamental difference between a process chart and a process map is that
A) the process chart uses a time dimension, while a process map is not time-oriented
B) the process chart includes the supply chain, while the process map stays within an
organization
C) the process chart is more like a table, while the process map is more like a schematic
diagram
D) the process chart focuses on the customer and on the provider's interaction with the
customer, while the process map does not deal directly with the customer
E) None of these is true, because a process chart and a process map are the same thing.
page-pf5
The Japanese method of organizing for product design features
A) teams
B) product managers (champions)
C) distinct departments with assigned tasks
D) a single organization without subdivision or individual teams
E) none of the above
Cyclone Appliances has developed a new European-style convection oven that will be
made on an assembly line. The schedule requires 80 ovens in an 8-hour day. The
assembly includes seven tasks. The table below indicates the performance time and the
sequence requirements for each task.
page-pf6
a. What is the cycle time for this assembly operation?
b. What is the theoretical minimum number of workstations?
c. Draw the precedence diagram.
page-pf7
PDCA is most often applied in regard to which aspect of TQM?
A) Six Sigma
B) Employee Empowerment
C) Continuous Improvement
D) Benchmarking
E) JIT
Fred's Fabrication, Inc. wants to increase capacity by adding a new machine. The firm
is considering proposals from vendor A and vendor B. The fixed costs for machine A
are $90,000 and for machine B, $70,000. The variable cost for A is $9.00 per unit and
for B, $14.00. The revenue generated by the units processed on these machines is $20
per unit. The crossover between machine A and machine B is
A) 4,000 units, with A more profitable at low volumes
B) 4,000 dollars, with A more profitable at low volumes
C) 4,000 units, with B more profitable at low volumes
D) 4,000 dollars, with B more profitable at low volumes
page-pf8
E) none of the above
Which of the following documents lists the operations (including assembly and
inspection) necessary to produce the component with the material specified in the bill of
material?
A) an engineering drawing
B) an assembly drawing
C) a route sheet
D) an assembly chart
E) an operations chart
In job shop (make-to-order) operations, the master production schedule is usually
expressed in
A) end items
B) modules
C) kits
D) customer orders
E) warehouse orders
Which of the following metrics is most likely used in evaluating an outsourced call
page-pf9
center but not a manufacturing process?
A) quality
B) delivery
C) logistics
D) cost
E) personnel evaluations and training
Which of the following statements concerning the operations management decision is
relevant to services?
A) There are many objective quality standards.
B) The customer is not involved in most of the process.
C) The work force's technical skills are very important.
D) Labor standards vary depending on customer requirements.
E) Ability to inventory may allow the leveling of the output rates.
There are 5 jobs (A, B, C, D, E) that need to be completed in a work center. The due
dates are the 10th, 13th, 8th, 20th, and 15th respectively with process times of 7, 12, 7,
20, and 10 respectively as well. If today is the 1st of the month calculate the critical
ratio for each and use this value to sequence the jobs in the order they should be started.
page-pfa
What steps can be taken to develop benchmarks?
What is the difference between the process capability ratio C and the process capability
index Cpk?
__________ involves capacity decisions that determine the allocation of classes of
resources in order to maximize profit or yield.
Provide an example of the postponement strategy for improving service productivity.
page-pfb
Identify five parts which Boeing's 787 Dreamliner gets from global suppliers; match
each part with the country that supplies it.
A small private university normally charges the same price -$200-per credit-hour for all
courses and for all students. While the university is pretty near capacity in the fall and
spring, it finds that its classrooms are only about 60 percent occupied during the
summer session. A student of operations management (who has recently read this
chapter) wonders if yield management might be useful to both the university and its
students alike. This student, with help from some economics majors, estimates a
demand curve for summer course enrollment. Points on this demand curve include 9000
credit-hours at the current rate of $200, 12,000 credit hours at $180, 15,000 credit-hours
at $160, and 18,000 credit-hours at $140. Based on this demand curve, what price point
would best serve the university, if its objective is the greatest revenue for the summer
session?
Why is Harley-Davidson identified as a repetitive manufacturer, not a mass customizer?

Trusted by Thousands of
Students

Here are what students say about us.

Copyright ©2022 All rights reserved. | CoursePaper is not sponsored or endorsed by any college or university.