Chapter 11 – Waiting Line Models
times are constant at 7.5 seconds. Find the average length of the waiting line.
Operating characteristics: M/D/1
56. The 8 students in a seminar class must come to the professor’s office to turn in a paper and give a 5-minute oral
summary. Assume there is a service rate of 10 per hour and adequate time is available for all. The arrival rate for each unit
is 5 per hour. What is the probability there is no one in the office or waiting when you come?
Finite calling population
57. Andy Archer, Ph.D., is a training consultant for six mid-sized manufacturing firms. On the average, each of his six
clients calls him for consulting assistance once every 25 days. Andy typically spends an average of five days at the client’s
firm during each consultation.
Assuming that the time between client calls follows an exponential distribution, determine the following:
the average number of clients Andy has on backlog
the average time a client must wait before Andy arrives to it
the proportion of the time Andy is busy
Finite calling population
58. The Quick Snap photo machine at the Lemon County bus station takes four snapshots in exactly 75 seconds.
Customers arrive at the machine according to a Poisson distribution at the mean rate of 20 per hour. On the basis of this
information, determine the following:
the average number of customers waiting to use the photo machine
the average time a customer spends in the system
the probability an arriving customer must wait for service.
W = .028 hour = 1.7 minutes
59. Quick Clean Rooter cleans out clogged drains. Due to the competitive nature of the drain cleaning business, if a
customer calls Quick Clean and finds the line busy, they immediately try another company and Quick Clean loses the
business.
Quick Clean management estimates that on the average, a customer tries to call Quick Clean every three minutes and the
average time to take a service order is 200 seconds. The company wishes to hire enough operators so that at most 4% of
its potential customers get the busy signal.
How many operators should be hired to meet this objective?