23) For which of the following is a subjective measure most appropriate?
A) level of satisfaction of patient care in a hospital
B) degree of improvement in closing sales in a real estate brokerage
C) quality of a water supply
D) reduction of waste in a manufacturing process
24) ________ corrects the problem at once to get performance back on track.
A) Basic corrective action
B) Immediate corrective action
C) Verbal feedback
D) Disciplinary action
25) “No, James, you must start the timer after you lower the French fry basket into the fryer, not
before.” This supervisor is using ________.
A) basic corrective action
B) disciplinary action
C) immediate corrective action
D) delayed corrective action
26) If a manager investigates how and why performance has deviated beyond the acceptable
range of variation, and then corrects the source of the deviation, she is using ________.
A) feedback control
B) immediate corrective action
C) basic corrective action
D) concurrent control