16) The first step in developing an attribute process chart is to ________.
A) determine whether the critical product characteristic is a variable or an attribute
B) establish control limits
C) identify critical product characteristics
D) identify critical operations where process inspection might be needed
E) select the appropriate process chart from the many types of charts
17) A quality engineer notes that a process produces data that are binomial and has been obtained
using a sample space that is not constant. The primary interest of the process manager is in the
number of discrepancies per part. An appropriate control chart to use would be a(n) ________.
A) np chart
B) p chart
C) c chart
D) u chart
E) d chart
18) A quality engineer notes that a process produces data that are binomial and has been obtained
using a sample space that is not constant. The primary interest of the process manager is in the
percentage of bad parts. An appropriate control chart to use would be a(n) ________.
A) np chart
B) p chart
C) c chart
D) u chart
E) d chart