Number of people carrying out the inspection
Two methods which can be used to carry out continuity of circuit protective conductors
which are not completely visible are
Method 1 (R1 + R2), and method 2 (long lead)
Visual inspection and long lead method
Visual and R1 + R2 method
One consideration regarding test leads when carrying out a ring circuit test is
The leads must be nulled or the resistance subtracted from the test result
Leads must be correctly coloured
They must be manufactured by the same company as the test instrument
When conducting an earth fault loop impedance test on a final circuit
The installation must be isolated and the earthing conductor disconnected
The earthing conductor must be disconnected and the installation energised
The earthing conductor must be connected and the circuit energised
Three checks which must be carried out on an electrical installation before an installation
resistance test is carried out on it are
Installation isolated, lamps removed, switches open
Lamps removed, installation energised and dimmers bypassed
Installation energised, all lamps in place and switches closed
Switches closed, installation isolated and lamps removed
When carrying out a ring final circuit test the measured value of stages 2 and 3 are lower
than the measured value of stage 1 because
The conductors are connected in parallel
The conductors are disconnected