Quick search
Join
Home
>
Quiz
>
Journalism Chapter 3 Quiz Answer A 500v Dc Insulation Resistance Test
Sidebar
Close
Journalism Chapter 3 Quiz Answer A 500v Dc Insulation Resistance Test
0
Helpful
0
Unhelpful
July 20, 2022
Related documents
Econ 120 Practice Test Answers
Chapter 1 Business And Its Environment
Sociology
Wow My Love
Case Report Laquinta
Article Review: Administrators and Accountability: The Plurality of Value Systems in the Public Domain
FC 42957
FC 62472
FIN 91396
FE 34842
Unlock access to all the studying documents.
View Full Document
1
During initial ver
ification the three
conditions whic
h must be verified a
s stated in BS767
1
are
(A)
Polarity, R1 + R2 and all ma
terials compliant with BS
(B)
Environment, utilization and constr
uction
(C)
Installed equipment i
s of the correct type and comp
lies with appropriate BS. (not B
S 7671),All
of the fixed installation has
been correctl
y selected and erected and it i
s not visibly damaged or
defective
(D)
Installed equipment wor
ks correctly, all cir
cuits are RCD protected and all eq
uipment installed
in zone 1 of a bathroom is t
o IP4X
2
The title
given in law to the person carryi
ng out peri
odic inspections is
(A)
Duty holder
(B)
Competent person
(C)
Electrician
(D)
Qualified electrician
3
The electricit
y at work regulations sta
te that per
sons carrying out electri
cal work must
(A)
Wear glasses
(B)
Be supervised
(C)
Be insured
(D)
Be competent
4
State one supply par
ameter which may
be measured or obtained fr
om the DNO
(A)
Frequency
(B)
Voltage
(C)
Ipf
(D)
I∆n
5
State two supply parame
ters
which can only be ob
tained by enquiry
to the DNO
(A)
Ipf , PFC
(B)
Voltage, Frequency
(C)
Zs, Maximum demand
(D)
Voltage, PFC
6
The purpose of initia
l verification as
identified in guidance note
3 is to ensure t
hat
(A)
All installed equipment works
(B)
The installation has been designe
d and constructed to comp
ly with BS7671
(C)
That the installation has been corr
ectly tested
(D)
The installation complies wi
th the customers requirements
7
The resista
nce of a single conductor is 0
.7O. If the length is do
ubled and the
c.s.a is
doubled the effect o
n the resist
ance will be
(A)
It is doubled
(B)
It is halved
(C)
It remains the same
(D)
It increases
8
When a test on a
cable is carried out using a l
ow resist
ance ohmmeter the va
lue provided
by the instrument will
be in
(A)
kA
(B)
mΩ
(C)
MΩ
(D)
Ω
9
The test volt
age required for an i
nsulation test carried out t
o prove electrica
l separation
between a SELV circuit
and a low voltage cir
cuit is
(A)
500v d.c.
(B)
25v d.c.
(C)
250v d.c.
(D)
50v d.c.
10
An insulation resista
nce test of an el
ectrical installati
on formed of five circuit
s produces the
following results 100Mâ
„¦, 80MΩ, 25Mâ
„¦, 70MΩ and 20Mâ„
¦. The insul
ation resist
ance
value expected if the tes
t was carri
ed out at the meter
tails would be
(A)
0.126Ω
(B)
7.88mΩ
(C)
7.88MΩ
(D)
0.126MΩ
(C)
7.88MΩ
11
An insulation resista
nce test is t
o be carried out on a
circuit which contains
a socket outlet
with surge protecti
on, the maximum test
voltage is
(A)
500v d.c.
(B)
230v d.c.
(C)
250v d.c.
(D)
50v d.c.
(C)
250v d.c.
12
Additional protection
will be required for
(A)
Circuits which cannot meet the
required disconnection time
(B)
A lighting circuit in a room
containing a bath or a shower
(C)
Installations where there i
s no protective bondi
ng
(D)
Circuits supplied by a TT system
(B)
A lighting circuit in a room
containing a bath or a shower
13
The earth fault
return path for a TT
system is
(A)
The general mass of earth
(B)
The earthing conductor and
the general mass of earth
(C)
The protective bondi
ng conductor, the mass of earth and
the earthing conductor
(D)
The earthing conductor, the
earth electrode
and the general mass of earth
(D)
The earthing conductor, the
earth electrode
and the general mass of earth
14
The maximum tabulat
ed Zs for a protect
ive device as
shown in BS 7671 is 1.44Ω
, the
maximum permissible me
asured Zs will be
(A)
1.44Ω
(B)
1.43Ω
(C)
1.15Ω
(D)
1.08Ω
(C)
1.15Ω
15
The prospective fault
current for a
n installation is t
o be measured at
the origin of a
polyphase insta
llation, the highest mea
sured value
is likely to be between
(A)
L1 – E
(B)
L1 – N
(C)
L3 – N
(D)
L1 –
L2
16
One point of a 3 phase
instal
lation where phase rot
ation must be checked
(A)
Each consumers unit
(B)
Each distribution board
(C)
The origin of the installation
(D)
The terminals of an electri
c motor
17
The type of inspectio
n during which voltage dro
p should be
verified
(A)
Initial verification
(B)
Periodic inspe
ction
(C)
Visual
(D)
Formal
18
The type of instrument
which can be used to c
heck phase
sequence is
(A)
An approved voltage indicato
(B)
An earth fault loop re
sistance tester
(C)
A rotating disc type
(D)
A multi meter
19
One condition that
must be checked whe
n confirming polarity
is
(A)
Correct IP ratings
(B)
Double pole switche
s are used to switch all line
conductors
(C)
The thread of an ES lamp ho
lder i
s not connected to the neutral
(D)
Correct connection of equipme
nt
20
Determine the volt
age drop for a circuit
with a combined L-
N resista
nce of 0.43Ω at 20
deg C and a load current
of 20A
(A)
5v
(B)
8.6v
(C)
10.32v
(D)
4.65v
(C)
10.32v