While constructing a histogram, how is group width calculated?
A) number of groups (lower limit of the last group + upper limit of the first group)
B) (upper limit of the last group – lower limit of the first group) / number of groups
C) (upper limit of the first group + number of groups) lower limit of the last group +
number of groups)
D) (lower limit of the first group – number of groups) upper limit of the last group
Stone Age Surfboards is a small manufacturer of two types of popular high-tide
surfboards, the Rockwell and the Limestone models. The manufacturing process
consists of two departments: fabrication and finishing. The fabrication department has
15 skilled workers, each of whom works 5 hours per day. The finishing department has
5 workers, who also work a 5-hour shift. Each pair of Rockwell surfboards requires 3
labor hours in the fabrication department and 1.5 labor hours in finishing. The
Limestone model requires 4.5 labor- hours in fabrication and 2 labor-hours in finishing.
The company operates 6 days a week. It makes a per-unit profit of $60 on the Rockwell
model and $75 on the Limestone model. Approximately 4.1 Rockwell models and 8.4
Limestone models are produced per day.