Quick search
Join
Home
>
Quiz
>
Chapter 8 States Bus prog Technology topics tools And Techniques For Quality
Sidebar
Close
Chapter 8 States Bus prog Technology topics tools And Techniques For Quality
0
Helpful
0
Unhelpful
August 16, 2022
Related documents
Econ 120 Practice Test Answers
Chapter 1 Business And Its Environment
Sociology
Wow My Love
Case Report Laquinta
Article Review: Administrators and Accountability: The Plurality of Value Systems in the Public Domain
FC 42957
FC 62472
FIN 91396
FE 34842
Unlock access to all the studying documents.
View Full Document
Chapter 8: Project
Quality Management
c.
deliverable
d.
variance
can
be severa
l opportunities
to
have a de
fect.
1
Difficulty: Easy
p.319
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Knowledge
44. The _____
is
a measu
re of quality contro
l equal
to
1 fault
in
1
million oppo
rtunities problems.
a.
ISO 9000
b.
six
9s
of
quality ru
le
c.
seven run rule
d.
Six Sigma rule
b
Difficulty: Modera
te
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Knowledge
45. A(n) _____
is
d
one
to
t
est
each
ind
ividual component
(often a program
)
to
ensure
that
it
is
as
defect-free
as
possible.
a.
integration test
b.
unit test
c.
user acceptance te
st
d.
system test
1
Difficulty: Modera
te
p.320
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Knowledge
46.
____
is
an
independen
t test perfor
med by end users
prior
to
accepting the deliv
ered system.
a.
Integration testing
b.
Unit testing
Chapter 8: Project
Quality Management
c.
User acceptance
testing
d.
System testing
accepting the deliver
ed system.
It
focuses on the bu
siness fit of
the system
to
the
organization, rather
than technical issues.
Difficulty: Modera
te
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Knowledge
47. Which
of
the following
is
one of
Dem
ing’s
14 Points for
Managemen
t?
a.
An
organization should in
crease depende
nce
on
inspection
to
ach
ieve quality.
b.
Award business based
on price tag a
lone rather than
on
other consider
ations.
c.
Minimize total co
st
by
working with multiple suppl
iers rather than a sin
gle supplier.
d.
Eliminate the annual
rating
or merit system.
Difficulty: Modera
te
p.323
INFO.SC
HW.14.60 – LO: 8-7
United States – BU
SPROG: Techno
logy
Modern Quality Manag
ement
Bloom’s: Knowledge
48. One of
Juran’s
ten s
teps
to
quality impro
vement states
that:
a.
an
organiza
tion should minimize top
management
involvement
in
the achievem
ent of individu
al employee
goals.
b.
an
organiza
tion should entr
ust improvement
to
individ
ual employees rather
than appointin
g teams
or
facilitators.
c.
an
organiza
tion should build awarenes
s of the need an
d opportunity fo
r improvemen
t.
d.
an
organiza
tion should avoid
“kee
ping
score”
in
o
rder
to
achieve
an
ov
erall atmosp
here of quality
improvement.
Difficulty: Modera
te
49. _____ wrote
Qual
ity
Is
Free
in
1979
and
is
b
est known for sugg
esting that o
rganizations st
rive for zero de
fects.
a.
Juran
b.
Ishikawa
c.
Crosby
d.
Deming
1
Difficulty: Modera
te
p.323-324
INFO.SC
HW.14.60 – LO: 8-7
United States – BU
SPROG: Techno
logy
Modern Quality Manag
ement
Bloom’s: Knowledge
50. _____, a quality
system standar
d
is
a thre
e-part, continuous
cycle
of
planning, controlling, an
d documenti
ng quality
in
an
organiza
tion.
a.
Seven run rule
b.
ISO 9000
c.
Six Sigma
d.
ASQ
b
continuous cycle of p
lanning, contro
lling, and docume
nting quality
in
an
org
anization.
1
Difficulty: Easy
p.325
INFO.SC
HW.14.60 – LO: 8-7
United States – BU
SPROG: Techno
logy
Modern Quality Manag
ement
Bloom’s: Knowledge
51. _____
is
the
cost of evalua
ting processes and
their outputs
to
ensure that
a project
is
e
rror-free
or
within
an
acceptable
error range.
a.
Prevention cost
b.
Appraisal cost
c.
Internal failure co
st
d.
External failure cos
t
b
reporting inspection d
ata all con
tribute
to
app
raisal cos
ts
of
quality.
p.323
INFO.SC
HW.14.60 – LO: 8-7
United States – BU
SPROG: Techno
logy
Modern Quality Manag
ement
Bloom’s: Knowledge
52. _____
is
a co
st that relates
to
all errors no
t detected and no
t corrected befor
e delivery
to
the custo
mer.
a.
Prevention cost
b.
Appraisal cost
c.
Internal failure co
st
d.
External failure cos
t
d
1
Difficulty: Modera
te
p.328
INFO.SC
HW.14.61 – LO: 8-8
United States – BU
SPROG: Techno
logy
Improving
IT
Project Quality
Bloom’s: Knowledge
53. _____ helps integra
te traditional
ly separate organ
izational functions
, set proces
s improvemen
t goals and prior
ities,
provide guidance for
quality proc
esses, and provide a
point of reference
for appraising cu
rrent process
es.
a.
SQFD
b.
MTBI
c.
OPM3
d.
CMMI
d
1
Difficulty: Modera
te
p.331
INFO.SC
HW.14.61 – LO: 8-8
United States – BU
SPROG: Techno
logy
Improving
IT
Project Quality
Bloom’s: Knowledge
Completion
54. The Internationa
l Organiza
tion for Standardiza
tion (ISO
) defines _____
as
“the
total
ity of characteris
tics
of
an
entity
that bear on its abil
ity
to
sa
tisfy stated or i
mplied
needs
.”
quality
1
Difficulty: Modera
te
p.327-328
INFO.SC
HW.14.61 – LO: 8-8
United States – BU
SPROG: Techno
logy
Improving
IT
Project Quality
Bloom’s: Knowledge
55. The term _____
means a product
can
be
used
as
it
was intended.
56. The purpose
of
_____
is
to
ensu
re that the project
will satisfy the need
s for which
it
w
as under
taken.
57. Performing _____ i
nvolves periodi
cally evaluating overa
ll project per
formance
to
en
sure that the pro
ject will sa
tisfy
the relevant quality
standards.
58. Performing _____ i
nvolves monito
ring specific projec
t results
to
ensu
re that they co
mply with the rele
vant quality
standards while iden
tifying ways
to
improve ov
erall quality.
59. _____
is
a qua
lity plann
ing techniqu
e that helps ide
ntify which variabl
es have the mo
st influence on th
e overall
outcome of a proces
s.
60. _____ are the sc
reens and repor
ts the system gener
ates.
61. _____
is
the
ability
of
a product
or
service
to
perfo
rm
as
expec
ted under normal co
nditions.
62. A(n)_____
is
a structur
ed review
of
specific quality man
agement activiti
es that help iden
tify lessons lear
ned that cou
ld
63. _____ correct
or
prevent further qual
ity problems b
ased
on
quality control mea
surements.
64. _____ diagrams
trace comp
laints about quality
problems back
to
the respo
nsible produc
tion operations.
65.
In
a _____, the closer d
ata points are
to
a
diagonal
line, the more close
ly the tw
o variables are re
lated.
66. _____ involves cho
osing par
t of a population
of
interest for
inspection.
67. Complete the for
mula: samp
le size = 0.25 * ( ____
_ /acceptab
le error)
2
Chapter 8: Project
Quality Management
68.
In
the DMAIC process,
the letter
“C”
stands
for _____.
69. _____ measures
how much variat
ion exists
in
a
distribution
of
data.
70. The _____ represen
ts the number of un
its handled c
orrectly through t
he proces
s steps.
71. _____
is
a m
easure of qual
ity control equal
to
1 fault
in
1 million oppo
rtunities
.
72. Watts
S.
Humphrey de
fines a(n) ___
__
as
anything
that must be c
hanged befor
e delivery
of
the program.
73. _____ are groups
of
non-superv
isors and work lea
ders
in
a
single company de
partment who volu
nteer
to
conduct
group studies on how
to
improve
the effectivene
ss
of
work
in
their depart
ment.
74. Genichi
Taguch
i’s
_____ me
thods focus
on
eliminating def
ects by substitu
ting scientif
ic inquiry for trial-
and-error
methods.
75. The _____ mean
s taking res
ponsibility for fa
ilures or no
t meeting quality ex
pectations.
76. The _____ mode
l focuses on def
ining user requiremen
ts and planning sof
tware projects.
77. Frameworks for hel
ping organ
ization improve th
eir processe
s and system a
re
78. List and briefly
describe the th
ree project qual
ity managemen
t processes.
79. What are the thr
ee main outco
mes of quality cont
rol? Briefly d
escribe each.
80. What are the fiv
e phases
in
the DMAIC
process? Briefly des
cribe
each
one.
81. Describe the rela
tionship betwe
en Six Sigma and S
tatistics. Wha
t statistical concept
s are involved
in
the Six Sig
ma
philosophy?
82. What are the fiv
e major cost ca
tegories related
to
qual
ity? Briefly desc
ribe each catego
ry.