Quick search
Join
Home
>
Quiz
>
Chapter 8 It is important for all project stakeholders to work together
Sidebar
Close
Chapter 8 It is important for all project stakeholders to work together
0
Helpful
0
Unhelpful
August 16, 2022
Related documents
Econ 120 Practice Test Answers
Chapter 1 Business And Its Environment
Sociology
Wow My Love
Case Report Laquinta
Article Review: Administrators and Accountability: The Plurality of Value Systems in the Public Domain
FC 42957
FC 62472
FIN 91396
FE 34842
Unlock access to all the studying documents.
View Full Document
Chapter 8: Project
Quality Management
True / False
1. The quality assuran
ce process inv
olves taking respo
nsibility for quali
ty throughout the
p
roject’s
life cyc
le.
a.
True
b.
False
True
1
p.303
United States – BU
SPROG: Techno
logy
2. Validated changes an
d validat
ed deliverables are
the outputs of the q
uality ass
urance process.
a.
True
b.
False
False
1
p.303
INFO.SC
HW.14.55 – LO: 8-2
What
Is
Project Quality Ma
nagement?
3. The design of expe
riments techniqu
e cannot be appl
ied
to
pro
ject manage
ment issues such
as
cost and sche
dule trade-
offs.
a.
True
b.
False
False
1
p.304
4. Customer require
ments are
an
important aspec
t
of
t
he quality p
lanning process.
a.
True
b.
False
False
1
Difficulty: Easy
p.304
INFO.SC
HW.14.56 – LO: 8-3
United States – BU
SPROG: Techno
logy
Planning Quality Mana
gement
Bloom’s: Comprehens
ion
5. Reliability
is
the ability of a p
roduct
or
service
to
perfor
m
as
expected und
er deviant condi
tions.
a.
True
b.
False
False
1
Difficulty: Modera
te
p.305
INFO.SC
HW.14.56 – LO: 8-3
United States – BU
SPROG: Techno
logy
Planning Quality Mana
gement
Bloom’s: Knowledge
6. Project managers ar
e ultimately respon
sible for qua
lity managemen
t on their projec
ts.
a.
True
b.
False
True
1
Difficulty: Easy
INFO.SC
HW.14.56 – LO: 8-3
Planning Quality Mana
gement
Bloom’s: Comprehens
ion
7. Only
in
-house
auditors can pe
rform quality audi
ts.
a.
True
b.
False
False
quality audits; these qua
lity audits can
be
scheduled
or
random.
1
Difficulty: Modera
te
p.307
Bloom’s: Knowledge
8. Products that are
accepted by pro
ject stakeholde
rs are conside
red
to
be
validated del
iverables.
a.
True
b.
False
True
1
p.307
United States – BU
SPROG: Techno
logy
9. A run chart
is
a bar graph tha
t depicts data po
ints and their orde
r
of
occurrence.
a.
True
b.
False
False
1
Difficulty: Modera
te
p.313
Bloom’s: Comprehens
ion
Chapter 8: Project
Quality Management
10. Using Six Sig
ma principles
is
an
organiza
tion-wide co
mmitment and all
employees mu
st embrace its prin
ciples.
a.
True
b.
False
True
1
Difficulty: Easy
p.316
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Comprehens
ion
11. The Six Sigma app
roach w
orks best for a pro
ject where a qua
lity proble
m
is
identified between the curr
ent and desire
d
performance.
a.
True
b.
False
True
1
Difficulty: Modera
te
p.317
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Comprehens
ion
12. The term sigma
means median.
a.
True
b.
False
False
The term sigma mean
s standard devi
ation.
1
Difficulty: Modera
te
p.318
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Bloom’s: Knowledge
Chapter 8: Project
Quality Management
13. Testing
as
a s
tage
is
i
mportant only
at
the end
of
an
information technology produc
t development.
a.
True
b.
False
False
1
Difficulty: Modera
te
p.320
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Comprehens
ion
14. Integration test
ing involves t
esting of
each
individual co
mponent
to
ensure that
it
is
as
defect-free
as
possible.
a.
True
b.
False
False
grouped component
s.
It
ensures that a subset
or
subsets of the en
tire system work
together.
1
Difficulty: Modera
te
p.320
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Knowledge
15.
In
TQC, product quality
is
more import
ant than production
rates, and wo
rkers are allowed
to
stop produ
ction
whenever a quality pro
blem occurs.
a.
True
b.
False
True
1
Difficulty: Easy
p.325
INFO.SC
HW.14.60 – LO: 8-7
United States – BU
SPROG: Techno
logy
Modern Quality Manag
ement
Bloom’s: Comprehens
ion
16. DeMarco and
L
ister’s
study on
organization
s and productiv
ity found direct cor
relations betw
een productiv
ity and
programming langu
age, years
of
experience, and sa
lary.
Chapter 8: Project
Quality Management
a.
True
b.
False
False
1
p.329
United States – BU
SPROG: Techno
logy
17. Frameworks for hel
ping organ
izations improv
e their processes and s
ystem are
called Six Sigma ch
arts.
a.
True
b.
False
False
increasingly organize
d and systematica
lly more matu
re processes.
1
Difficulty: Modera
te
p.330
United States – BU
SPROG: – Technolo
gy
Bloom’s: Knowledge
18. Gantt charts canno
t be used
to
a
id project qua
lity manage
ment.
a.
True
b.
False
False
1
Difficulty: Easy
p.333
INFO.SC
HW.14.62 – LO: 8-9
Bloom’s: Knowledge
Chapter 8: Project
Quality Management
19. _____ means the
project’s
process
es and products mee
t written specific
ations.
a.
Conformance
to
requireme
nts
b.
Fitness for use
c.
Project feasibili
ty
d.
Benchmarking
1
Difficulty: Modera
te
p.302
INFO.SC
HW.14.55 – LO: 8-2
United States – BU
SPROG: Techno
logy
What
Is
Project Quality Ma
nagement?
Bloom’s: Knowledge
20. _____ means tha
t a product
can
be
used a
s
it
was intend
ed.
a.
Conformance
to
requireme
nts
b.
Fitness for use
c.
Critical chain schedu
ling
d.
Free slack
b
Feedback: Fitness fo
r use means that
a product can be
used
as
it
was
intend
ed.
1
Difficulty: Modera
te
p.302
INFO.SC
HW.14.55 – LO: 8-2
United States – BU
SPROG: Techno
logy
What
Is
Project Quality Ma
nagement?
Bloom’s: Knowledge
21. Process improve
ment plan, qual
ity metrics, and qu
ality checklist
s are the outp
uts
of
the _____ process
of
project
quality management.
a.
controlling quality
b.
planning quality manag
ement
c.
quality certifica
tion
d.
performing quality assu
rance
1
Difficulty: Modera
te
p.302-303
INFO.SC
HW.14.55 – LO: 8-2
United States – BU
SPROG: Techno
logy
What
Is
Project Quality Ma
nagement?
Chapter 8: Project
Quality Management
22. A _____
is
a standard
of
measurement
in
quality m
anagement.
a.
milestone
b.
metric
c.
merge
d.
matrix
b
1
Difficulty: Modera
te
p.303
INFO.SC
HW.14.55 – LO: 8-2
United States – BU
SPROG: Techno
logy
What
Is
Project Quality Ma
nagement?
Bloom’s: Knowledge
23. The _____ proce
ss
is
of
ten associated with
the technica
l tools and techni
ques
of
quality managemen
t, such
as
Pa
reto
charts, quality contr
ol charts, and
statistical sampl
ing.
a.
quality planning
b.
quality certificatio
n
c.
quality assurance
d.
quality control
d
1
Difficulty: Modera
te
p.303
INFO.SC
HW.14.55 – LO: 8-2
United States – BU
SPROG: Techno
logy
What
Is
Project Quality Ma
nagement?
Bloom’s: Knowledge
24. Performing qual
ity assuranc
e
is
a subprocess of the _____ p
rocess
of
project quality man
agement.
a.
initiating
b.
closing
c.
monitoring and con
trolling
d.
executing
d
quality management.
1
Difficulty: Modera
te
p.303
INFO.SC
HW.14.55 – LO: 8-2
United States – BU
SPROG: Techno
logy
What
Is
Project Quality Ma
nagement?
Chapter 8: Project
Quality Management
25. Validated chang
es and valida
ted deliverables are
the outputs of the
_____ sub
process
of
project quality manage
ment.
a.
initiating
b.
closing
c.
monitoring and con
trolling
d.
executing
1
Difficulty: Modera
te
p.303
INFO.SC
HW.14.55 – LO: 8-2
United States – BU
SPROG: Techno
logy
What
Is
Project Quality Ma
nagement?
Bloom’s: Knowledge
26. _____
is
a t
echnique th
at helps identify which
variables hav
e the most influ
ence on the over
all outcome
of
a process.
a.
Design of experi
ments
b.
Backward pass
c.
Activity-on-arrow
d.
Crashing
outcome
is
a ve
ry importan
t part
of
quality planning.
1
Difficulty: Modera
te
p.304
INFO.SC
HW.14.56 – LO: 8-3
United States – BU
SPROG: Techno
logy
Planning Quality Mana
gement
Bloom’s: Comprehens
ion
27. _____
is
the
degree
to
which a syste
m performs its in
tended function.
a.
Reliability
b.
Validity
c.
Maintainability
d.
Functionality
d
optional.
1
Difficulty: Modera
te
p.304
INFO.SC
HW.14.56 – LO: 8-3
United States – BU
SPROG: Techno
logy
Performing Quality A
ssurance
Chapter 8: Project
Quality Management
28. _____ are the
sys
tem’s
special cha
racterist
ics that appeal
to
users.
a.
Features
b.
Outputs
c.
Yields
d.
Metrics
1
Difficulty: Modera
te
p.304
INFO.SC
HW.14.56 – LO: 8-3
United States – BU
SPROG: Techno
logy
Bloom’s: Knowledge
29. _____ addresses how w
ell a produc
t
or
service performs the
cu
stomer’s
intend
ed use.
a.
Reliability
b.
Performance
c.
Maintainability
d.
Functionality
b
intended use.
1
Difficulty: Modera
te
p.305
INFO.SC
HW.14.56 – LO: 8-3
United States – BU
SPROG: Techno
logy
Planning Quality Mana
gement
Bloom’s: Knowledge
30. _____
is
the
ability
of
a product
or
service
to
perfo
rm
as
expec
ted under normal co
nditions.
a.
Reliability
b.
Performance
c.
Maintainability
d.
Functionality
service management.
1
Difficulty: Modera
te
p.305
INFO.SC
HW.14.56 – LO: 8-3
United States – BU
SPROG: Techno
logy
Planning Quality Mana
gement
Bloom’s: Knowledge
31. _____ addresses
the ease of per
forming maintenanc
e on a product.
Chapter 8: Project
Quality Management
a.
Reliability
b.
Performance
c.
Maintainability
d.
Functionality
Feedback: Maintain
ability addresses th
e ease
of
performing mainten
ance on a product.
1
Difficulty: Modera
te
p.305
INFO.SC
HW.14.56 – LO: 8-3
United States – BU
SPROG: Techno
logy
Planning Quality Mana
gement
32. _____ genera
tes ideas for qua
lity improvement
s by comparing s
pecific projec
t practices or produc
t charact
eristics
to
those of other project
s
or
products within or outside th
e performing or
ganization.
a.
Prototyping
b.
Systems thinking
c.
Mind mapping
d.
Benchmarking
d
1
Difficulty: Modera
te
p.306-307
INFO.SC
HW.14.57 – LO: 8-4
Performing Quality A
ssurance
Bloom’s: Knowledge
33. _____ refers
to
action taken
to
bring re
jected items
into compliance wi
th product requ
irements or spec
ifications
or
other stakeholder expe
ctations.
a.
A process adjust
ment
b.
Rework
c.
An
acceptance decision
d.
Validation
b
or corrective or prev
entive
ac
tions.
1
Difficulty: Modera
te
P.307
INFO.SC
HW.14.58 – LO: 8-5
United States – BU
SPROG: Techno
logy
Controlling Quality
Bloom’s: Comprehens
ion
34. _____ correct(s)
or
prevent(s) fu
rther quality pro
blems based on qual
ity control meas
urements.
Chapter 8: Project
Quality Management
a.
Process adjustmen
ts
b.
Rework
c.
Acceptance decis
ions
d.
Decomposition
1
P.308
INFO.SC
HW.14.58 – LO: 8-5
United States – BU
SPROG: Techno
logy
Controlling Quality
Bloom’s: Knowledge
35. A _____
is
a graphic display of d
ata that illustr
ates the result
s
of
a process over time.
a.
statistical sampli
ng chart
b.
Pareto chart
c.
Six Sigma chart
d.
control chart
d
control.
1
Difficulty: Modera
te
p.309
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Knowledge
36. _____ help users
to
identi
fy the vital few con
tributors tha
t account for mos
t quality prob
lems
in
a sys
tem.
a.
Gantt charts
b.
Pareto charts
c.
Control charts
d.
Tracking Gantt chart
s
b
problems
in
a system.
1
Difficulty: Modera
te
p.311
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Chapter 8: Project
Quality Management
37. _____ involves cho
osing par
t of a population
of
interest for
inspection.
a.
Statistical samp
ling
b.
Conformance
c.
System testing
d.
Fitness for use
1
Difficulty: Modera
te
p.314
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Knowledge
38. Six
Sigma’s
targ
et for perfect
ion
is
the ach
ievemen
t of
no
more than _____ def
ects, errors,
or
mistakes per million
opportunities.
a.
1.34
b.
3.4
c.
34
d.
13.4
b
errors, or mistakes per
million oppo
rtunities.
1
Difficulty: Modera
te
p.315
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Knowledge
39. Projects that us
e Six Sigma princi
ples for quality c
ontrol nor
mally follow a fiv
e-phase improv
ement proce
ss called
_____.
a.
DMAIC
b.
weighted scoring
model
c.
configuration man
agement
d.
use case modeling
1
Difficulty: Modera
te
p.316
INFO.SC
HW.14.59 – LO: 8-6
United States –
BUS
PRO
G: Technology
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Knowledge
40. Important tools us
ed
in
the _____ phase
of
the DMAI
C process include a p
roject charter, a d
escription of c
ustomer
Chapter 8: Project
Quality Management
requirements, proces
s maps, and Voice
of
the Custo
mer (VOC) data.
a.
define
b.
measure
c.
analyze
d.
improve
1
Difficulty: Modera
te
p.316
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Knowledge
41.
An
important tool used
in
the ___
__ phase
of
the DMAI
C process
is
the fishbone or Ish
ikawa diagram.
a.
define
b.
measure
c.
analyze
d.
improve
or Ishikawa diagra
m.
1
Difficulty: Modera
te
p.316
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Knowledge
42. A ____
is
a
bell-shaped
curve that
is
s
ymmetrical
regarding the ave
rage value of th
e population (the d
ata being
analyzed).
a.
skewed distribu
tion
b.
normal distribution
c.
bimodal distribut
ion
d.
degenerate distribu
tion
b
1
Difficulty: Modera
te
p.318
INFO.SC
HW.14.59 – LO: 8-6
United States – BU
SPROG: Techno
logy
Tools And Techniqu
es For Quali
ty Control
Bloom’s: Knowledge
43. A(n) _____
is
any insta
nce where the produ
ct
or
service fails
to
meet cu
stomer requ
irements.
a.
defect
b.
yield