Chapter 6 – Defining Scope and Constructing Work Breakdown Structures (WBS)
TRUE/FALSE
1. Plan scope management is the process of creating a project scope statement.
2. The project scope refers to the features and functions that characterize a product, service or result.
3. The project scope is the work that must be performed to deliver a product, service or result with the
specified features and functions.
4. A thorough scope definition process will often yield multiple project deliverables including
intermediate project deliverables due before the project is complete.
5. The project scope statement will frequently state what features and work elements are excluded from
the project in addition to stating which are included.
6. The best project scope statements are brief, succinct and limit their focus specifically to the work to be
performed.
7. The Work Breakdown Structure is normally developed by listing major deliverables and then
progressively smaller ones, until the team feels that every deliverable has been identified.
8. By using a systematic process of creating a Work Breakdown Structure, project team members can
ensure that they remember all deliverables that need to be created.
9. If a problem occurs during project execution, the Work Breakdown Structure can be used to
understand exactly where and why the problem occurred.