Quick search
Join
Home
>
Quiz
>
Chapter 5 Project scope statements should include at least a product
Sidebar
Close
Chapter 5 Project scope statements should include at least a product
0
Helpful
0
Unhelpful
August 15, 2022
Related documents
Econ 120 Practice Test Answers
Chapter 1 Business And Its Environment
Sociology
Wow My Love
Case Report Laquinta
Article Review: Administrators and Accountability: The Plurality of Value Systems in the Public Domain
FC 42957
FC 62472
FIN 91396
FE 34842
Unlock access to all the studying documents.
View Full Document
Chapter 5: Project
Scope Management
True / False
1. Scope refers
to
all the w
ork involved
in
c
reating the
products of the p
roject and the proc
esses used
to
create the
m.
a.
True
b.
False
True
1
Difficulty: Easy
p.184
INFO.SC
HW.14.31 – LO: 5-1
United States – BU
SPROG: Techno
logy
What
Is
Project Scope Man
agement?
Bloom’s: Knowledge
2. Deliverables are o
nly product-rela
ted, such
as
a pi
ece of hardwa
re
or
software.
a.
True
b.
False
False
process-related, such
as
a plann
ing documen
t or meeting minut
es.
1
Difficulty: Modera
te
p.184
INFO.SC
HW.14.31 – LO: 5-1
United States – BU
SPROG: Techno
logy
What
Is
Project Scope Man
agement?
Bloom’s: Knowledge
3. Project scope man
agement inclu
des the processes
involved
in
defining and con
trolling what
is
or
is
no
t incl
uded
in
a
project.
a.
True
b.
False
True
1
Difficulty: Modera
te
p.184
INFO.SC
HW.14.31 – LO: 5-1
4. The scope manage
ment plan
can
be
informal a
nd broad or form
al and detailed,
based on the needs
of
the pr
oject.
a.
True
b.
False
True
1
Difficulty: Modera
te
p.186
United States – BU
SPROG: Techno
logy
Planning Scope Mana
gement
Bloom’s: Comprehens
ion
5. The
project’s
size, co
mplexi
ty, importance, and
other facto
rs
do
not affect how much effort
is
spent on co
llecting
requirements for scope p
lanning.
a.
True
b.
False
False
effort
is
spent on
collecting
requirements.
1
Difficulty: Modera
te
p.190
INFO.SC
HW.14.33 – LO: 5-3
United States – BU
SPROG: Techno
logy
Collecting Require
ments
Bloom’s: Comprehens
ion
6. Information from
the project char
ter provides a bas
is for further defi
ning the project scope.
a.
True
b.
False
True
1
Difficulty: Modera
te
p.191
United States – BU
SPROG: Techno
logy
What
Is
Project Scope Man
agement?
Bloom’s: Knowledge
7. Project scope sta
tements must inclu
de the projec
t boundaries, const
raints, and a
ssumptions.
a.
True
b.
False
False
1
Difficulty: Modera
te
p.191
INFO.SC
HW.14.34 – LO: 5-4
United States – BU
SPROG: Techno
logy
Defining Scope
Bloom’s: Knowledge
8. The scope
of
a project
is
clear and speci
fic from the
start.
a.
True
b.
False
False
Feedback:
As
time progress
es, the scope
of
a project should b
ecome more clea
r and specific.
1
Difficulty: Easy
p.193
INFO.SC
HW.14.34 – LO: 5-4
United States – BU
SPROG: Techno
logy
Defining Scope
Bloom’s: Comprehens
ion
9. Many informati
on technology pro
jects also require
detailed function
al and design speci
fications for develo
ping
software, which also sh
ould be re
ferenced
in
th
e detaile
d scope statem
ent.
a.
True
b.
False
True
developing software, wh
ich also shou
ld
be
referenced
in
the detailed scope st
atement.
1
Difficulty: Easy
p.193
INFO.SC
HW.14.34 – LO: 5-4
Defining Scope
Bloom’s: Knowledge
10. The project sco
pe statement sho
uld reference supp
orting documen
ts, such
as
product specifica
tions that will affect
what products are prod
uced or purcha
sed, or corporate
policies, which
might affect
how products or servic
es are
produced.
a.
True
b.
False
True
1
Difficulty: Modera
te
p.191-193
INFO.SC
HW.14.34 – LO: 5-4
United States – BU
SPROG: Techno
logy
Defining Scope
Bloom’s: Knowledge
11. The project sco
pe statement, s
takeholder requirem
ents documentatio
n, and organizat
ional process ass
ets are the
primary inputs for c
reating a WBS.
a.
True
b.
False
True
1
Difficulty: Modera
te
p.194
INFO.SC
HW.14.35 – LO: 5-5
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
12. The scope basel
ine
in
a WBS
consists
of
the requirements docu
mentation and
enterprise environm
ental factors.
a.
True
b.
False
False
associated WBS and
WBS dictionary.
1
Difficulty: Easy
p.194
INFO.SC
HW.14.35 – LO: 5-5
13. The WBS
is
organized
solely around proje
ct phases.
a.
True
b.
False
False
or the project manage
ment process g
roups.
1
Difficulty: Modera
te
p.194
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
14. A work package r
epresents one c
omponent
of
the product tha
t the project aim
s
to
del
iver.
a.
True
b.
False
False
1
Difficulty: Modera
te
p.197
INFO.SC
HW.14.35 – LO: 5-5
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
15. A work package
must always rep
resent less than
80
hours of work.
a.
True
b.
False
False
1
Difficulty: Modera
te
INFO.SC
HW.14.35 – LO: 5-5
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
16. Given the proje
ct manageme
nt software that
is
available,
it
is
r
elatively eas
y
to
create a good WBS.
a.
True
b.
False
False
the project and its sc
ope and inco
rporate the needs
and knowledge
of
the stakehol
ders.
1
Difficulty: Modera
te
p.197
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
17. The tasks
in
a WBS must be
developed
as
a s
equential list
of
steps.
a.
True
b.
False
False
1
Difficulty: Modera
te
p. 198
INFO.SC
HW.14.35 – LO: 5-5
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Comprehens
ion
18. The executing t
asks of the WBS r
emain consta
nt from project
to
projec
t.
a.
True
b.
False
False
1
Difficulty: Modera
te
p.198
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
19. Many organiza
tions provide d
ifferent guidelin
es and templates for d
eveloping WBS
s.
a.
True
b.
False
True
1
Difficulty: Easy
p.200
INFO.SC
HW.14.35 – LO: 5-5
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
20. Mind mapping al
lows people
to
w
rite and ev
en draw pict
ures of ideas
in
a nonlin
ear format.
a.
True
b.
False
True
1
Difficulty: Easy
p.201
INFO.SC
HW.14.35 – LO: 5-5
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
21. The format of the
WBS diction
ary
is
essent
ially the
same for all projec
ts.
a.
True
b.
False
False
1
Difficulty: Modera
te
p.203
United States – BU
SPROG: Techno
logy
Bloom’s: Knowledge
22. A unit of work
should appear
at
only
one place
in
the WBS.
a.
True
b.
False
True
work should appear
at
only one place
in
the
WBS.
1
Difficulty: Modera
te
p.204
INFO.SC
HW.14.35 – LO: 5-5
Creating The Work B
reakdow
n Structure
Bloom’s: Comprehens
ion
23. Scope creep
if
n
ot mana
ged well can lead
to
the
failure
of
information technolo
gy projects.
a.
True
b.
False
True
1
Difficulty: Modera
te
p.205
INFO.SC
HW.14.36 – LO: 5-6
United States – BU
SPROG: Techno
logy
Validating Scope
Bloom’s: Knowledge
Multiple Choice
24. The term ______ d
escribes a produ
ct produced
as
p
art of a project.
a.
variance
b.
scope
c.
deliverable
d.
work package
1
Difficulty: Easy
p.184
INFO.SC
HW.14.31 – LO: 5-1
United States – BU
SPROG: Techno
logy
Bloom’s: Knowledge
25. Scope refers to:
a.
each
level
of
work that
is
o
utlined
in
a work breakdow
n structur
e.
b.
the end product c
reated
as
part of
a project that
is
delivered
to
the clien
t.
c.
tasks that are deco
mposed into sma
ller tasks
in
a work
breakdown structu
re.
d.
the work involved
in
crea
ting the products and th
e processes used
to
create
them.
processes used
to
create the
m.
INFO.SC
HW.14.31 – LO: 5-1
United States – BU
SPROG: Techno
logy
What
Is
Project Scope Man
agement?
Bloom’s: Knowledge
26. _____ involves de
fining and docum
enting the feat
ures and functio
ns
of
t
he products pr
oduced during the
project
as
well
as
the processe
s used for crea
ting them.
a.
Collecting requir
ements
b.
Defining scope
c.
Controlling scope
d.
Validating scope
Difficulty: Modera
te
INFO.SC
HW.14.31 – LO: 5-1
United States – BU
SPROG: Techno
logy
What
Is
Project Scope Man
agement?
Bloom’s: Knowledge
27. _____ involves r
eviewing the pro
ject charter, requi
rements document
s, and organizat
ional process ass
ets
to
create a
scope statement, addi
ng more info
rmation
as
requirements are deve
loped and chan
ge requests are app
roved.
a.
Creating scope
b.
Defining scope
c.
Controlling scope
d.
Validating scope
What
Is
Project Scope Man
agement?
Bloom’s: Knowledge
28. _____ involves fo
rmalizing acce
ptance of the proj
ect deliverables and du
ring this pha
se the key project
stakeholders,
such
as
the customer and sponsor
for the project, insp
ect and then f
ormally accept
the deliverables.
a.
Creating scope
b.
Defining scope
c.
Controlling scope
d.
Validating scope
d
formally accept the de
liverables du
ring this process.
1
Difficulty: Modera
te
p.185
INFO.SC
HW.14.31 – LO: 5-1
United States – BU
SPROG: Techno
logy
What
Is
Project Scope Man
agement?
Bloom’s: Knowledge
29. Creating the WBS
is
a s
ubprocess associat
ed with the _____ pro
cess
in
pro
ject scope ma
nagement.
a.
planning
b.
monitoring and con
trolling
c.
closing
d.
executing
project scope mana
gement.
1
Difficulty: Easy
p.185
INFO.SC
HW.14.32 – LO: 5-2
United States – BU
SPROG: Techno
logy
Planning Scope Mana
gement
Bloom’s: Knowledge
30. The ______ docu
ments how pro
ject needs will be a
nalyzed, docu
mented, and managed.
a.
requirements trace
ability matrix
b.
requirements manage
ment plan
c.
WBS
d.
project scope sta
tement
b
1
Difficulty: Modera
te
p.185
INFO.SC
HW.14.31 – LO: 5-1
United States – BU
SPROG: Techno
logy
What
Is
Project Scope Man
agement?
Bloom’s: Knowledge
31. Generating ideas by
comparing spe
cific project p
ractices or prod
uct characte
ristics
to
tho
se
of
other projects
or
products inside or o
utside the perfo
rming organizat
ion
is
know
n
as
_____.
a.
variance
b.
benchmarking
c.
prototyping
d.
decomposition
b
organization, can be
used
to
collect requireme
nts.
1
Difficulty: Easy
p.189
INFO.SC
HW.14.33 – LO: 5-3
United States – BU
SPROG: Techno
logy
Collecting Require
ments
Bloom’s: Knowledge
32. A(n) _____
is
a table that lis
ts requirement
s, their various attri
butes, and the s
tatus of the requ
irements
to
ensure that
all are addressed.
a.
requirements trace
ability matrix
b.
Gantt chart
c.
state transition tabl
e
d.
entity-attribute-va
lue model
various attributes, and t
he status
of
the requirements
to
ensure that
all are address
ed.
1
Difficulty: Easy
p.191
INFO.SC
HW.14.33 – LO: 5-3
United States – BU
SPROG: Techno
logy
Collecting Require
ments
Bloom’s: Knowledge
33. A(n) _____
is
a deliverable-or
iented grouping
of the work
involved
in
a project that define
s the total sco
pe of the
project.
a.
project charter
b.
business case
c.
project scope sta
tement
d.
work breakdown st
ructure
d
p.187
INFO.SC
HW.14.32 – LO: 5-2
United States –
BUS
PRO
G: Technology
Planning Scope Mana
gement
Bloom’s: Knowledge
34. The main techn
ique used
in
c
reating a WBS
is
_____, w
hich involves su
bdividing projec
t deliverables in
to smaller
pieces.
a.
conglomeration
b.
accumulation
c.
decomposition
d.
catalyzation
subdividing projec
t deliverables into
smaller pieces.
1
Difficulty: Easy
p.194
INFO.SC
HW.14.35 – LO: 5-5
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
35. A(n) ____
is
a
task
at
the lowest leve
l
of
t
he WBS.
a.
variance
b.
objective
c.
deliverable
d.
work package
d
Feedback: A work pa
ckage
is
a
task
at
the lowest level of th
e WBS.
1
Difficulty: Modera
te
p.196
INFO.SC
HW.14.35 – LO: 5-5
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
36. The _____ should
list and des
cribe all of the del
iverables required fo
r the proje
ct.
a.
project charter
b.
scope statement
c.
WBS
d.
Gantt chart
b
1
1
Difficulty: Easy
p.194
INFO.SC
HW.14.35 – LO: 5-5
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
37.
In
the _____approach f
or constructing a WBS,
you use a
similar
project’s
WBS
as
a
starting point.
a.
top-down
b.
bottom-up
c.
mind-mapping
d.
analogy
d
Difficulty: Modera
te
P.200
INFO.SC
HW.14.35 – LO: 5-5
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
38. The _____ appro
ach for constru
cting a WBS invol
ves refining th
e work into greate
r and greater level
s of detail.
a.
analogy
b.
bottom-up
c.
top-down
d.
mind mapping
levels
of
detail.
1
Difficulty: Easy
p.201
INFO.SC
HW.14.35 – LO: 5-5
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge
39. The _____ appro
ach for constru
cting a WBS starts
with the largest ite
ms of the projec
t and breaks them int
o
subordinate items.
a.
analogy
b.
bottom-up
c.
top-down
d.
mind mapping
1
p.199
INFO.SC
HW.14.35 – LO: 5-5
United States – BU
SPROG: Techno
logy
Creating The Work B
reakdow
n Structure
Bloom’s: Knowledge