pounds of aluminum. A Deluxe chassis rack requires 12 pounds of each metal. The output of metal sheeting is restricted
only by the capacity of the polisher. For the next production cycle, the polisher can handle any mix of the two metals up to
4,000 pounds of metal sheeting. Chassis manufacture can be restricted by either metal stamping or assembly operations;
no polishing is required. During the cycle no more than 2,500 total chassis can be stamped, and there will be 920 hours of
assembly time available. The assembly time required is 24 minutes for the Standard chassis rack and 36 minutes for the
Deluxe chassis rack. Finally, market conditions limit the number of Standard chassis racks sold to no more than 1,200
Standard and no more than 1,000 Deluxe. Any quantities of metal sheeting can be sold.
28. Refer to Exhibit 3-2. What is the incremental contribution associated with adding an hour of assembly time? Over
what range of increase is the marginal value valid?
29. Refer to Exhibit 3-2. What is the value of additional capacity on the polisher? How much increase and decrease in this
capacity is possible before a change occurs in the optimal production schedule?