9. Out-of control indicators may include a number of conditions. What is not one of these?
At least 8 upward (or downward) consecutive changes
At least 8 consecutive points above (or below) the centerline
At least 1 point beyond two standard deviations from the centerline
At least 4 of 5 consecutive points beyond one standard deviation from the centerline
10. Michael has incorporated a vigorous cross-training program within his department. This is an example of which of
Deming’s 14 points?
11. Mohammed is monitoring the diameter of bolts being produced on one of his assigned production lines. During this
process, he notices one, single measurement that jumped above the upper control limit. He immediately adjusts the
alignment on several machines to address the problem. Mohammed has likely committed a(n):
12. The average run length (ARL) indicates the mean length of time between:
false alarms in an in–control process
false alarms in an out-of-control process
out-of-control indications in an out-of—control process
type II errors in an in-control process
13. Jean is examining variation on a control chart. One of the machines was misaligned and is operated by an
inexperienced worker. The variation caused by these factors is caused by ____.
in statistical control causes
14. Which of the following are attributes charts?
p chart, chart, and u chart
p chart, chart, and u chart
p chart, c chart, and u chart
p chart, c chart, and R chart
15. Which of the following is not one of Deming’s 14 Points?
Use Lowest-Tender Contracts.
Have Constancy of Purpose.